The DOI matches its Crossref record; 58 of the 58 references it cites were found in a registry or an index.
The effects of lean production on worker job stress
Abstract
Purpose: This empirical paper seeks to address the neglected work condition aspect of lean production (LP) implementation, specifically the relationship between LP and worker job stress. Design/methodology/approach: The Karasek job stress model was used to link shopfloor practices to expected worker stress. The model incorporates the effects of job demands (physical and psychological), job control and social support. The study employs management and worker questionnaires, management interviews and structured plant tours. The response variable is total worker job stress – the sum of the physical and mental stress levels. The independent variable for the first question is the degree of lean implementation at the sites. Findings: The results are based on 1,391 worker responses at 21 sites in the four UK industry sectors. About 11 tested practices are significantly related to stress and an unexpected non‐linear response of stress to lean implementation is identified. Results indicate that LP is not inherently stressful, with stress levels significantly related to management decisions in designing and operating LP systems. Practical implications: The hypotheses tests shed light on the relationships between LP practices and job stress, and reveal a significant managerial influence on stress levels. The regression model shows the scale and significant lean practices of this influence, with the work practices explaining 30 percent of job stress variations. The stress reduction and stress control opportunities identified in the study show the potential for designing and operating effective lean systems while also controlling stress levels. Originality/value: This is the first known multi‐industry empirical study of the relationship of job stress to a range of lean practices and to the degree of lean implementation.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“By transforming work structures and processes, Lean also affects the employees responsible for carrying out the work, as studies of Lean outside of healthcare demonstrate [32–36].”
From Lean Thinking in Emergency Departments: A Critical Review (2011) · cites this paper as [32]
In the citing paper
“These undesirable employee effects are well documented in the broader Lean literature [32–39, 94–97] but may not show up in reports on Lean in health care either because of how Lean is implemented in health care or because studies in health care simply do not measure employee effects.”
From Lean Thinking in Emergency Departments: A Critical Review (2011) · cites this paper as [32]
In the citing paper
“Lean implementers and researchers should be aware that Lean can increase workload, threaten autonomy, and bring about anxiety.”
From Lean Thinking in Emergency Departments: A Critical Review (2011) · cites this paper as [32]
In the citing paper
“Lean implementers and researchers should be aware that Lean can increase workload, threaten autonomy, and bring about anxiety.”
From Lean Thinking in Emergency Departments: A Critical Review (2011) · cites this paper as [32]
In the citing paper
“Lean implementers and researchers should be aware that Lean can increase workload, threaten autonomy, and bring about anxiety.”
From Lean Thinking in Emergency Departments: A Critical Review (2011) · cites this paper as [32]
Citations
Cites
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,820
Toyota production system: beyond large-scale production
Ohno, T., & Rosen, C. B. (1998) · CERN Document Server (European Organization for Nuclear Research) · Cited by 4,544
Total quality management as competitive advantage: A review and empirical study
Powell, T. C. (1995) · Strategic Management Journal · doi:10.1002/smj.4250160105 · Cited by 2,650
A Study of the Toyota Production System From an Industrial Engineering Viewpoint
Shingo, S., & Bodek, N. (2019) · doi:10.4324/9781315136509 · Cited by 1,064
(1990) · Computers Environment and Urban Systems · doi:10.1016/0198-9715(90)90035-r · Cited by 1,025
Research on work-related stress
Cox, T. (2000) · Cited by 529
Britain At Work: As Depicted by the 1998 Workplace Employee Relations Survey
Cully, M., O'Reilly, A., & Dix, G. (1999) · Medical Entomology and Zoology · Cited by 465
Choosing Sides: Unions and the Team Concept
Wells, D., Parker, M., & Slaughter, J. (1992) · Labour / Le Travail · doi:10.2307/25143610 · Cited by 441
Ergonomics contributions to company strategies
Dul, J., & Neumann, P. (2008) · Applied Ergonomics · doi:10.1016/j.apergo.2008.07.001 · Cited by 436
An examination of the relationships between JIT and financial performance
Fullerton, R. R., McWatters, C. S., & Fawson, C. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(03)00002-0 · Cited by 422
Research works printed but not linked: 12
- Berggren, C., Adler, P. and Cole, R. (1994), “NUMMI vs Uddevalla”, Sloan Management Review, Winter, pp. 37‐49.
- Buchanan, D. (1994), “Cellular manufacturing and the role of teams”, in Storey, J. (Ed.), New Wave Manufacturing Strategy, Paul Chapman, London.
- Conti, R. (1990), “The effect of restrictive work practices on repetitive flow, just‐in‐time manufacturing costs”, PhD dissertation, Lehigh University, University Microfilms International, Ann Arbor, MI.
- Cranwell‐Ward, J. (1998), “Stress”, in Poole, M. and Warner, M. (Eds), The Handbook of Human Resource Management, International Thomson Business Press, London.
- Fucini, J. and Fucini, S. (1990), Working for the Japanese, The Free Press, New York, NY.
- Graham, L. (1995), On the Line at Suburu‐Isuzu: The Japanese Model, ILR Press, Ithaca, NY.
- Koenigsaecker, G. (2000), “Multiple sites multiply change and management challenges”, The Lean Manufacturing Advisor, June, pp. 3‐7.
- Labour Market Trends (2001), Vol. 109 No. 6.
- Schonberger, R. (1982), Japanese Manufacturing Techniques, Lessons in Simplicity, The Free Press, New York, NY.
- Schonberger, R. (1998), “The Japanese era (1970s) and its influence on OM”, paper presented at the POMS Conference, Santa Fe, NM, March 30‐31.
- Shimizu, K. (1995), “Humanization of the production system and work at Toyota motor company and Toyota motor kyushu”, in Sandberg, A. (Ed.), Enriching Production, Avebury, Aldershot.
- Shingo, S. (1989), A Study of the Toyota Production System, Productivity Press, Portland, OR.
Cited by
Sorted by citations
Items 201–300 of 336
Brosnan, S., O’Donnell, D., & O’Regan, P. (2019) · Journal of Management & Governance · doi:10.1007/s10997-019-09450-8 · Cited by 6
Lean management and occupational health: team learning as a key factor
Stimec, A. (2020) · Journal of Workplace Learning · doi:10.1108/jwl-08-2019-0104 · Cited by 10
Assembly Tasks in the Automotive Industry: A Challenge for Older Employees
Frieling, E., Kotzab, D., Díaz, J. A. E., & Sytch, A. (2013) · Springer eBooks · doi:10.1007/978-3-642-35057-3_9 · Cited by 6
Lean Implementation : the significance of people and dualism
Halling, B. (2013) · Diva portal (Dalarna University Library) · Cited by 6
An information model for lean, agile, resilient and green supply chain management
Cabral, I. (2011) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT) · Cited by 6
CUSTOMER VALUE AND LEAN OPERATIONS IN MASTERS EDUCATION
Watt, C., Angelis, J., & Chapman, D. (2012) · Cited by 5
Self-citationSutarja, I. N., & Putra, I. D. G. A. D. (2022) · Civil Engineering and Architecture · doi:10.13189/cea.2022.100210 · Cited by 5
The Impact of Ergonomics on the Design of Hybrid Multi-model Production Lines in Lean Manufacturing
Botti, L., Mora, C., Piana, F., & Regattieri, A. (2017) · Advances in intelligent systems and computing · doi:10.1007/978-3-319-60474-9_16 · Cited by 5
Bouville, G., & Schmidt, C. (2020) · Revue de gestion des ressources humaines · doi:10.3917/grhu.114.0003 · Cited by 5
High task interdependence: job rotation and other approaches for overcoming ingroup favoritism
Wagner, J. P., Grigg, N. P., Mann, R. S., & Mohammad, M. (2017) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-11-2016-0160 · Cited by 6
Quality management, job-related contentment and performance
de Menezes, L. M., & Wood, S. (2015) · Evidence-based HRM a Global Forum for Empirical Scholarship · doi:10.1108/ebhrm-05-2014-0016 · Cited by 5
Gao, S., & Low, S. P. (2014) · Springer eBooks · doi:10.1007/978-981-287-014-8_4 · Cited by 5
Développer le travail d’organisation pour transformer l’organisation du travail
Bruère, S., & Chardeyron, J. (2013) · Activites · doi:10.4000/activites.573 · Cited by 6
Job satisfaction at risk: Measuring the role of process debt in agile software development
Gustavsson, T., Ahmad, M. O., & Saeeda, H. (2025) · Journal of Systems and Software · doi:10.1016/j.jss.2025.112350 · Cited by 8
Ratner, H., Bojesen, A., & Bramming, P. (2012) · Culture and Organization · doi:10.1080/14759551.2011.644674 · Cited by 4
Lean Transformation for Composite-Material Bonding Processes
Liu, C., Chiang, M.-S., & Chuang, W. (2012) · Open Journal Systems (Taiwan Association of Engineering and Technology Innovation) · Cited by 4
Live long and propser : Health-promoting conditions at work
Ståhl, A.-C. F. (2015) · Linköping University Electronic Press eBooks · doi:10.3384/diss.diva-117064 · Cited by 4
Baruch, Y. (2009) · Wiley eBooks · doi:10.1002/9780470682357.ch10 · Cited by 4
Lean, team and psychosocial factors : a longitudinal investigation at a Swedish hospital
Ulhassan, W. (2014) · Figshare · Cited by 4
Standardization and Certification in Lean Manufacturing
Degirmenci, T. (2008) · UWSpace (University of Waterloo) · Cited by 4
Rolander, B. (2010) · DiVA (Linkoping University) · Cited by 4
Pardi, H., Rahman, M. N. A., Saibani, N., & Muhamed, A. A. (2024) · Jurnal Kejuruteraan · doi:10.17576/jkukm-2024-36(2)-15 · Cited by 5
Conceitos e características de sistemas poka-yokes: uma revisão de literatura
Vidor, G., & Saurin, T. A. (2011) · Revista Produção Online · doi:10.14488/1676-1901.v11i2.644 · Cited by 3
Beyond lean manufacturing: the productivity, innovator's and proactivity dilemmas resolved
Shamshurin, A. (2012) · doi:10.25439/rmt.27332613 · Cited by 3
Pinto, J. L. Q., Matias, J. C. O., Pimentel, C., Azevedo, S. G., & Govindan, K. (2018) · Management for professionals · doi:10.1007/978-3-319-77016-1_3 · Cited by 3
Gender and Welfare Service Work in Biocapitalism
Jokinen, E., Hirvonen, H., Mankki, L., Aho, T., & Lehto, I. (2023) · Routledge eBooks · doi:10.4324/9781003309789 · Cited by 8
Tena, A. B. E., Segarra‐Ciprés, M., & Juan, B. G. (2024) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2023-0695 · Cited by 4
Pouring Temperature Effects on Mechanical and Electrical Responses of Cast 6063 Aluminum Alloy
Adeosun, S. O., Akpan, E. I., & Odetola, P. I. (2013) · Cited by 3
Classifying Lean Production: A Review of Empirical Research
Marshall, D. A. S. (2015) · Cited by 3
Professional assessment and collective standards - lean in a cancer department
Hasle, P. (2010) · Advances in human factors and ergonomics series · doi:10.1201/ebk1439835074-c37 · Cited by 3
Rampasso, I. S., & Anholon, R. (2017) · Revista Produção Online · doi:10.14488/1676-1901.v17i4.2637 · Cited by 3
An Empirical Study on Lean Management and HRM Practices in Relation towards Operational Performance
Ismail, A., & Zainuddin, Y. (2018) · The Turkish Online Journal of Design Art and Communication · doi:10.7456/1080sse/158 · Cited by 3
Cellular Manufacturing and Teamwork Concepts in Garment Manufacturing
Lanarolle, G., & Ratnayake, V. (2014) · IOSR Journal of Business and Management · doi:10.9790/487x-16638193 · Cited by 3
Applying Lean Production and Six Sigma in Global Operations
Kasemsap, K. (2017) · IGI Global eBooks · doi:10.4018/978-1-5225-3909-4.ch028 · Cited by 3
An analysis of work related stress factor in selected industries in Kerala India
Satheesh Kumar, K. (2011) · Dyuthi Digital Repository (Cochin University of Science and Technology) · Cited by 3
Stress Fracture: Adverse Effects of Lean Initiatives
Wullbrandt, J., & Downing, C. G. (2016) · ASEE Annual Conference & Exposition · doi:10.18260/p.25890 · Cited by 2
Managing the Conflict between Economic and Social Factors in a Lean Context
Boutayeb, A., Ennadi, A., Chamat, A., & Touache, A. (2022) · Journal of Engineering · doi:10.1155/2022/9369996 · Cited by 2
Lean Management and Employee Well-Being
Kilroy, S., & Flood, P. C. (2021) · Handbook series in occupational health sciences · doi:10.1007/978-3-030-24936-6_9-1 · Cited by 2
Fundamental Concepts of Lean and Agile Manufacturing
Akbari, M., Nguyen, K., Houdt, K. V., & Kok, S. K. (2022) · Textile science and clothing technology · doi:10.1007/978-981-19-2108-7_3 · Cited by 2
van Kleeff, R., van Harten, J., & Knies, E. (2023) · Leadership in health services · doi:10.1108/lhs-05-2023-0034 · Cited by 2
Tijani, B., Jin, X., & Osei‐Kyei, R. (2024) · International Journal of Building Pathology and Adaptation · doi:10.1108/ijbpa-06-2023-0076 · Cited by 2
A Regulation Mechanism Based on Work Activity to Improve Lean Approach
Badets, P., Pilnière, V., & Merlo, C. (2014) · Lecture notes in computer science · doi:10.1007/978-3-662-44733-8_16 · Cited by 2
Lean supply chains and the competitiveness of emerging market firms
Mefford, R. N. (2012) · International Journal of Business and Emerging Markets · doi:10.1504/ijbem.2013.050720 · Cited by 2
THREE ESSAYS ON THE "DARK SIDE" OF TEAMS
Cruz, K. S. (2011) · D-Scholarship@Pitt (University of Pittsburgh) · Cited by 2
Exploiting motivation in the change towards autonomation in construction projects
Filho, A. N. D. M., da Costa, J. M., & Heineck, L. F. M. (2007) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT) · Cited by 2
Naqvi, S. (2013) · Cited by 2
Gaps between psychophysical demands and perceived workload - a framework for lean production system
Tortorella, G. L., Fries, C. E., Trindade, C., da Silva, M. P., Amaral, F. G., & Fogliatto, F. S. (2015) · Cited by 2
FROM LEAN TO GREEN SUPPLY CHAIN MANAGEMENT BASED ON AUTOMOTIVE INDUSTRY
Pisarek, A. (2018) · Prace Naukowe Uniwersytetu Ekonomicznego we Wrocławiu · doi:10.15611/pn.2018.505.19 · Cited by 2
Lean Management 4.0 Proposition for the Evolution of Managerial Criteria
Rother, E., Baboli, A., & Bernardini, L. (2020) · doi:10.1109/ieem45057.2020.9309877 · Cited by 2
Reischl, J. N. (2008) · NSUWorks (Nova Southeastern University) · Cited by 2
Lean in Healthcare: An Evaluation of Lean Implementation in NHS Lothian
Lindsay, C. F. (2026) · Research Output (Edinburgh Napier University) · doi:10.17869/enu.455610 · Cited by 2
Aybar, S., Gürül, B., & Karatürk, H. E. (2023) · Journal of Business Research - Turk · doi:10.20491/isarder.2023.1579 · Cited by 1
Eisenhard, C. M., & Morgeson, F. P. (2025) · Oxford University Press eBooks · doi:10.1093/oso/9780197692554.003.0003 · Cited by 1
At the Mercy of the Market? E-Commerce, Warehouse Work, and Job Quality in the United States
Kowalski, A. M., Pinto, S., Gutelius, B., & Vallas, S. P. (2026) · Industrial and Labor Relations Review · doi:10.1177/00197939261444716 · Cited by 1
Gentil, S., Grimand, A., Stimec, A., Journé, B., & Michel, X. (2026) · GRH · doi:10.3917/grh.pr.0012 · Cited by 1
A model of implementing lean logistics principles in Lithuanian transport enterprises
Vasiliauskas, A. V., Macijauskytė, I., Vitkūnas, R., Zinkevičiūtė, V., & Pavlova, J. (2014) · Business and management · doi:10.3846/bm.2014.096 · Cited by 1
Filho, A. N. D. M. (2008) · Cited by 1
Messaoudène, Z. (2018) · IFIP advances in information and communication technology · doi:10.1007/978-3-030-02456-7_4 · Cited by 1
CHANGE IN STAFF PERCEPTION OF LEAN HEALTH PRACTICES AFTER INITIATING LEAN IMPLEMENTATION
Hizli, I., Hizli, S., & Gürhan, N. (2020) · doi:10.21506/j.ponte.2020.4.12 · Cited by 1
Moyes, T. (2015) · Clinical Psychology Forum · doi:10.53841/bpscpf.2015.1.271.1 · Cited by 1
Lean Experience Analysis at a Leading Automotive Manufacturer in Vietnam
Minh, N. D. (2023) · Management Systems in Production Engineering · doi:10.2478/mspe-2023-0002 · Cited by 1
Job management and work-life balance minimize hotel and catering staff stress
Rawat, A., & Dani, R. (2024) · AIP conference proceedings · doi:10.1063/5.0182890 · Cited by 2
Zangara, G., Corvello, V., & Filice, L. (2024) · Procedia Computer Science · doi:10.1016/j.procs.2024.01.009 · Cited by 1
Liu, C., González, V. A., Lee, G., Davies, R. C., Cabrera‐Guerrero, G., & Zou, Y. (2025) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-15724 · Cited by 1
Not All Alike: The Distinctive Impact of Voluntary and Involuntary Effort on Stress and Fatigue
López, A. O., Bayo‐Moriones, A., & Larraza‐Kintana, M. (2013) · Applied Research in Quality of Life · doi:10.1007/s11482-013-9252-8 · Cited by 1
Virgilio, F. D., Bova, N., Pietro, L. D., & Sheehan, L. (2014) · International Journal of Public Administration · doi:10.1080/01900692.2014.880850 · Cited by 1
Lean Management and Organizational Effectiveness
Sparrow, P., Hird, M., & Cooper, C. L. (2015) · Palgrave Macmillan UK eBooks · doi:10.1057/9781137313775_4 · Cited by 1
Self-citationLP Impacts on the Neoliberal Political-Economic Context
Santos, M. J. (2016) · Management and industrial engineering · doi:10.1007/978-3-319-44909-8_2 · Cited by 1
Probation Officer Productivity: Using the Effort-Reward Imbalance Model
Presley, B. C. (2017) · Journal of International Crisis and Risk Communication Research · Cited by 1
Relations Between Key Elements of Quality Management: A Dematel Method Approach
Vasić, S., Delić, M., Brkljač, N., Vrhovac, V., & Žižakov, M. (2020) · Lecture notes on multidisciplinary industrial engineering · doi:10.1007/978-3-030-43616-2_25 · Cited by 1
Need of Ergonomics for Autonomous Vehicles
Mishra, D. (2023) · Springer eBooks · doi:10.1007/978-3-031-46708-0_9 · Cited by 1
van Dun, D. H., & Wilderom, C. P. M. (2014) · Academy of Management Proceedings · doi:10.5465/ambpp.2014.15791abstract · Cited by 1
The relationship between stress and emotional intelligence among direct-care workers
Karriem, K. L. (n.d.) · ProQuest Demo Repository · Cited by 1
Beaman, J. M. (2011) · ProQuest Demo Repository · Cited by 1
Cellular Manufacturing and Teamwork Concepts in Garment Manufacturing
Journals, I., & Gamini Lanarolle1, V. R. (2014) · Figshare · doi:10.6084/m9.figshare.1119080 · Cited by 1
Towards an understanding of the HRM bundle for lean service in the UK
Zirar, A. (2018) · Loughborough University Institutional Repository (Loughborough University) · Cited by 1
Lean Management and Employee Well-Being
Kilroy, S., & Flood, P. C. (2022) · Handbook series in occupational health sciences · doi:10.1007/978-3-030-29010-8_9 · Cited by 3
Losonci, D. I. (2011) · Vezetéstudomány / Budapest Management Review · doi:10.14267/veztud.2011.ksz.06
Lean production, job satisfaction and motivation in the Italian manufacturing industry
Chiarini, A., & Vagnoni, E. (2014) · doi:10.7433/srecp.2014.17
Metod för hantering av kalibrerparametrar för styrsystem
Ålin, D. (2010) · KTH Publication Database DiVA (KTH Royal Institute of Technology)
Forster, D., da Silva, W. V., Róglio, K. D. D., & Duclós, L. C. (2010) · Revista de Negócios · doi:10.7867/1980-4431.2010v15n2p53-72
Seis Sigma: uma metodologia inovadora ou uma nova embalagem para a Melhoria Contínua?
Rebelato, M. G., Rodrigues, A. M., & Rodrigues, I. C. (2012) · GEPROS. Gestão da Produção, Operações e Sistemas · doi:10.15675/gepros.v4i3.357
Growth of food sector’s productivity through innovations
Melece, L., & Krieviņa, A. (2015) · Management Theory and Studies for Rural Business and Infrastructure Development · doi:10.15544/mts.2015.23
De invloed van Lean Six Sigma op de werkmotivatie in de publieke sector
van Huysduynen, S. L. H. (2015) · Utrecht University Repository (Utrecht University)
Vidor, G., & Saurin, T. A. (2010) · Revista Gestão Industrial · doi:10.3895/s1808-04482010000200001
Lean Production Systems in the Context of Social Trends: Job Satisfaction the Key Factor to Success
Stock, T. W. (2014) · Advanced materials research · doi:10.4028/www.scientific.net/amr.1018.509
Customer value and lean operations in a self-care setting
Angelis, J., Watt, C., & Macintyre, M. (2018) · CRC Press eBooks · doi:10.4324/b21767-11
Self-citationLosonci, D. I. (2013) · Vezetéstudomány / Budapest Management Review · doi:10.14267/veztud.2013.06.03
Gowda, V. (2011) · ResearchSpace (University of KwaZulu-Natal)
Relações entre estratégias de produção e motivação para a autonomação
Filho, A. M., da Costa, J. M., & Heineck, L. F. M. (2007) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT)
Sharma, S. (2014) · IOSR Journal of Mechanical and Civil Engineering · doi:10.9790/1684-11477682
Influence of Lean Management Practices on Quality in Construction Industries
Ravindaran, T., Anandakumar, S., & Krishnamoorthy, D. V. (2016) · Bonfring International Journal of Industrial Engineering and Management Science · doi:10.9756/bijiems.7089
Jayawardane, V. P. P. (2016)
A Conceptual Model for Assessment of Wastes in an Enterprise
Swaroopa, B. (2018) · International Journal for Research in Applied Science and Engineering Technology · doi:10.22214/ijraset.2018.1072
From silos to cells: Reducing repetitive jobs through sociotechnical redesign
Vermeerbergen, L. J. G., Pless, S., Hootegem, G. V., & Benders, J. (2018) · Economic and Industrial Democracy · doi:10.1177/0143831x18756758 · Cited by 1
Metadata
- Authors
- Conti, R., Angelis, J., Cooper, C., Faragher, B., & Gill, C.
- Affiliations
- Bryant University (US)
- University of Warwick (GB)
- Lancaster University (GB)
- University of Manchester (GB)
- University of Cambridge (GB)
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 2006-09-01
- Volume
- 26
- Issue
- 9
- Pages
- 1013-1038
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W2030474117
- Cited by
- 336
- References
- 58
- Citations by year
- 2026: 10 · 2025: 8 · 2024: 7 · 2023: 16 · 2022: 27 · 2021: 15 · 2020: 20 · 2019: 21 · 2018: 22 · 2017: 25 · 2016: 16 · 2015: 26 · 2014: 22 · 2013: 23 · 2012: 23
- FWCI
- 13.29
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- International Journal of Operations & Production Management (publishedVersion)
- Lancaster EPrints (Lancaster University) (submittedVersion)
- Cambridge University Engineering Department Publications Database (submittedVersion)
- Research Explorer (The University of Manchester) (submittedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Health Sciences › Medicine › Public Health, Environmental and Occupational Health › Workplace Health and Well-being
- Health Sciences › Health Professions › Occupational Therapy › Occupational Health and Safety Management
- Keywords
- lean manufacturing, occupational stress, job demands, job control, social support, lean implementation, working conditions
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review