Performance measurement system design: A literature review and research agenda
The DOI matches its Crossref record; 75 of the 77 references it cites were found in a registry or an index.
Abstract
The importance of performance measurement has long been recognized by academics and practitioners from a variety of functional disciplines. Seeks to bring together this diverse body of knowledge into a coherent whole. To ensure that the key issues are identified, focuses on the process of performance measurement system design, rather than the detail of specific measures. Following a comprehensive review of the literature, proposes a research agenda.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Citations
Cites
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
(1992) · PubMed · Cited by 7,979
Deming, W. E. (1982) · Medical Entomology and Zoology · Cited by 7,297
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
The Concept of Corporate Strategy
Iverson, T., & Andrews, K. R. (1987) · Public Productivity Review · doi:10.2307/3380432 · Cited by 4,092 · cited 1×
“Many of the early writers on strategy, such as Andrews (1971)”
BackgroundPatterns in Strategy Formation
Mintzberg, H. (1978) · Management Science · doi:10.1287/mnsc.24.9.934 · Cited by 3,494 · cited 1×
“Measurement may be the “process of quantification”, but its affect is to stimulate action, and as Mintzberg (1978)”
BackgroundRelevance Lost: The Rise and Fall of Management Accounting
Johnson, T. H., & Kaplan, R. S. (1987) · Medical Entomology and Zoology · Cited by 3,177
Marketing Management: Analysis, Planning and Control
Borden, N. H., & Kotler, P. (1973) · Journal of Marketing · doi:10.2307/1250783 · Cited by 2,439 · cited 1×
“According to the marketing perspective, organizations achieve their goals, that is they perform, by satisfying their customers with greater efficiency and effectiveness than their competitors ( Kotler, 1984”
Background(1982) · Medical Entomology and Zoology · Cited by 2,277
Putting the Balanced Scorecard to Work
Kaplan, R. S., & Norton, D. P. (1998) · The Economic Impact of Knowledge · doi:10.1016/b978-0-7506-7009-8.50023-9 · Cited by 2,180
Research works printed but not linked: 50
- 23. Campanella, J. and Corcoran, F.J., “Principles of quality costs ”, Quality Progress, April 1983, pp. 16‐22.
- 24. Crosby, P.B., Quality is Free, McGraw‐Hill, New York, NY, 1972.
- 31. Drucker, P.F., “The emerging theory of manufacturing”, Harvard Business Review, May‐June 1990, pp. 94‐102.
- 32. Potts, D., “Just‐in‐time improves the bottom line”, Engineering Computers, September 1986, pp. 55‐60.
- 34. Galloway, D. and Waldron, D., “Throughput accounting part 1 – the need for a new language for manufacturing”, Management Accounting, November 1988, pp. 34‐5.
- 35. Galloway, D. and Waldron, D., “Throughput accounting part 2 – ranking products profitability”, Management Accounting, December 1988, pp. 34‐5.
- 36. Galloway, D. and Waldron, D., “Throughput accounting part 3 – a better way to control labour costs”, Management Accounting, January 1989, pp. 32‐3.
- 37. Galloway, D. and Waldron, D., “Throughput accounting part 4 – moving on to complex products”, Management Accounting, February 1989, pp. 40‐1.
- 39. Darlington, J., Innes, J., Mitchell, F. and Woodward, J., “Throughput accounting – the Garrett Automotive experience ”, Management Accounting, April 1992, pp. 32‐8.
- 41. Fooks, J.H., Profiles for Performance: Total Quality Methods for Reducing Cycle Time, Addison‐Wesley, Reading, MA, 1992.
- 45. Johnson, H.T., “The role of history in the study of modern business enterprise”, The Accounting Review, July 1975, pp. 444‐50.
- 48. Johnson, H.T., “Toward a new understanding of nineteenth‐century cost accounting ”, The Accounting Review, July 1981, pp. 510‐18.
- 52. Chandler, A.D., The Visible Hand – Managerial Revolution in American Business, Harvard University Press, Boston, MA, 1977.
- 53. Banks, R.L. and Wheelwright, S.C., “Operations versus strategy – trading tomorrow for today”, Harvard Business Review, May‐June 1979, pp. 112‐20.
- 56. Murphy, J.C. and Braund, S.L., “Management accounting and new manufacturing technology”, Management Accounting, February 1990, pp. 38‐40.
- 58. Cooper, R., “The two‐stage procedure in cost accounting: part 1”, Journal of Cost Management, Summer 1987, pp. 43‐51.
- 59. Cooper, R., “The two‐stage procedure in cost accounting: part 2”, Journal of Cost Management, Fall 1987, pp. 39‐45.
- 60. Cooper, R., “The rise of activity‐based cost systems: part I – what is an activity‐based cost system?”, Journal of Cost Management, Summer 1988, pp. 45‐54.
- 61. Cooper, R., “The rise of activity‐based cost systems: part II – when do I need an activity‐based cost system?”, Journal of Cost Management, Fall, 1988, pp. 41‐8.
- 62. Cooper, R., “The rise of activity‐based cost systems: part III – how many cost drivers do you need and how should you select them?”, Journal of Cost Management, Winter 1989, pp. 34‐46.
- 63. Cooper, R., “The rise of activity‐based cost systems: part IV – what do activity‐based systems look like?”, Journal of Cost Management, Spring 1989, pp. 34‐46.
- 64. Jeans, M. and Morrow, M., “The practicalities of using activity‐based costing”, Management Accounting, November 1989, pp. 42‐4.
- 65. Miller, J.G. and Vollmann, T.E., “The hidden factory”, Harvard Business Review, September/October 1985, pp. 142‐50.
- 66. Troxel, R.B. and Weber, M.G., “The evolution of activity‐based costing ”, Journal of Cost Management, Spring 1990, pp. 14‐22.
- 69. Piper, J.A. and Walley, P., “Testing ABC logic”, Management Accounting, September 1990, pp. 37‐42.
- 70. Piper, J.A. and Walley, P., “ABC relevance not found”, Management Accounting, March 1991, pp. 42‐54.
- 73. Maskell, B., “Relevance regained – an interview with Professor Robert S. Kaplan”, Management Accounting, September 1988, pp. 38‐42.
- 75. Innes, J. and Mitchell, F., “Activity‐based costing research”, Management Accounting, May 1990, pp. 28‐9.
- 80. Craig, C.E. and Harris, C.R., “Total productivity measurement at the firm level”, Sloan Management Review, Vol. 14 No. 3, 1973, pp. 13‐29.
- 81. Hayes, R.J., Wheelwright, S.C. and Clark, K.B., Dynamic Manufacturing: Creating the Learning Organisation, Free Press, New York, NY, 1988.
- 91. Buzacott, J.A., “The fundamental principles of flexibility in manufacturing systems ”, Proceedings of the First International Congress on Flexible Manufacturing Systems, Brighton, 1982, pp. 13‐22.
- 92. Cox, T., “Towards the measurement of manufacturing flexibility”, Productivity and Inventory Management, Vol. 30 No. 1, 1989, pp. 68‐72.
- 93. Skinner, W., “Manufacturing – missing link in corporate strategy”, Harvard Business Review, May‐June 1969, pp. 136‐45.
- 103. Morgan, M.J. and Weerakoon, P.S.H., “Japanese management accounting, its contribution to the Japanese economic miracle”, Management Accounting, June 1989, pp. 40‐3.
- 105. Yoshikawa, T., Innes, J. and Mitchell, F., “Japanese management accounting – a comparative survey”, Management Accounting, November 1989, pp. 20‐3.
- 106. Sakurai, M., “Target costing and how to use it”, Journal of Cost Management, Summer 1989, pp. 39‐50.
- 112. Keegan, D.P., Eiler, R.G. and Jones, C.R., “Are your performance measures obsolete?”, Management Accounting, June 1989, pp. 45‐50.
- 114. Maskell, B., “Performance measures of world class manufacturing”, Management Accounting, May 1989, pp. 32‐3.
- 119. Hayes, R.H. and Abernathy, W.J., “Managing our way to economic decline”, Harvard Business Review, July‐August 1980, pp. 67‐77.
- 120. Kaplan, R.S., “Yesterday′s accounting undermines production”, Harvard Business Review,Vol. 62, 1984, pp. 95‐101.
- 121. Fry, T.D. and Cox, J.F., “Manufacturing performance: local versus global measures”, Production and Inventory Management Journal, Vol. 30 No. 2, 1989, pp. 52‐6.
- 125. Wisner, J.D. and Fawcett, S.E., “Link firm strategy to operating decisions through performance measurement”, Production and Inventory Management Journal, Third Quarter, 1991, pp. 5‐11.
- 127. Weick, K., “The significance of corporate culture”, in Frost, P. , Moore, L., Louis, M., Lundberg, C. and Martin, J. (Eds), Organisational Culture, Sage, Beverly Hills, CA, 1985, pp. 381‐9.
- 128. Shapiro, B.P., “Can marketing and manufacturing coexist?”, Harvard Business Review, September‐October 1977, pp. 104‐14.
- 130. Richardson, P.R. and Gordon, J.R.M., “Measuring total manufacturing performance”, Sloan Management Review, Winter 1980, pp. 47‐58.
- 132. Garvin, D.A., “Quality on the line”, Harvard Business Review, September‐October, 1983,pp. 65‐75.
- 138. Young, S., “Checking performance with competitive benchmarking”, Professional Engineering, February 1993, pp. 14‐15.
- 140. Oge, C. and Dickinson, H., “Product development in the 1990s – new assets for improved capability”, Economist Intelligence Unit, Japan Motor Business, December 1992, pp. 132‐44.
- 144. Skinner, W., “The decline, fall and renewal of manufacturing”, Industrial Engineering, October 1974, pp. 32‐8.
- 147. Turney, P.B.B. and Anderson, B., “Accounting for continuous improvement”, Sloan Management Review, Vol. 30 No. 2, 1989, pp. 37‐48.
Cited by
Items 601–700 of 1,002
Maaz, M. A. M., & Ahmad, R. (2022) · Business Process Management Journal · doi:10.1108/bpmj-05-2021-0292 · Cited by 62
Kasemsap, K. (2014) · Advances in business information systems and analytics book series · doi:10.4018/978-1-4666-6473-9.ch012 · Cited by 43
BALANCED SCORECARD IMPLEMENTATION IN JORDAN: AN INITIAL ANALYSIS
Sawalqa, F. A. A., Holloway, D. A., & Alam, M. (2011) · Murdoch University Research Portal · Cited by 63
Doeleman, H. J., ten Have, S., & Ahaus, K. (2012) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2012.669935 · Cited by 55
Kollberg, B., Elg, M., & Lindmark, J. (2005) · Quality Management in Health Care · doi:10.1097/00019514-200504000-00005 · Cited by 55
Impact of the integration of tactical supply chain planning determinants on performance
Okongwu, U., Lauras, M., François, J., & Deschamps, J. (2015) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2014.10.003 · Cited by 42
Development and application of lean product development performance measurement tool
Al-Ashaab, A., Golob, M., Urrutia, U. A., Gourdin, M., Petritsch, C., Summers, M. D., & El-Nounu, A. (2015) · International Journal of Computer Integrated Manufacturing · doi:10.1080/0951192x.2015.1066858 · Cited by 42
Benchmarking healthcare logistics processes – a comparative case study of Danish and US hospitals
Feibert, D. C., Andersen, B. S., & Jacobsen, P. (2017) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2017.1299570 · Cited by 56
Influence of Social Identity on Negative Perceptions in Global Virtual Teams
Vahtera, P., Buckley, P. J., Aliyev, M., Clegg, J., & Cross, A. R. (2017) · Journal of International Management · doi:10.1016/j.intman.2017.04.002 · Cited by 40
Marín‐Idárraga, D. A., & Cuartas-Marín, J. C. (2019) · Revista de Administração de Empresas · doi:10.1590/s0034-759020190203 · Cited by 68
A Systematic Literature Review of Fraud Detection Metrics in Business Processes
Omair, B., & Alturki, A. (2020) · IEEE Access · doi:10.1109/access.2020.2971604 · Cited by 46
An International Analysis of IT Service Management Benefits and Performance Measurement
Gacenga, F., Cater‐Steel, A., & Toleman, M. (2010) · Journal of Global Information Technology Management · doi:10.1080/1097198x.2010.10856525 · Cited by 46
Taylor, A., & Taylor, M. (2013) · International Journal of Production Research · doi:10.1080/00207543.2013.784412 · Cited by 58
“Email: w.a.taylor@bradford.ac.uk International Journal of Production Research, 2013 Vol. 51, No. 18, 5485–5498, http://dx.doi.org/10.1080/00207543.2013.784412 2013 Taylor & Francis (Lucey 2009), total quality management (TQM) (Venkateswarlu and Nilakant 2005) and enterprise resource planning systems (Chian-Son 2005).”
BackgroundInfluentialCoherence analysis methods for production systems by performance aggregation
Ducq, Y., Vallespir, B., & Doumeingts, G. (2001) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00054-2 · Cited by 42
Parida, A. (2006) · DiVA (Luleå University of Technology) · Cited by 67
Alhyari, S., Alazab, M., Venkatraman, S., Alazab, M., & Alazab, A. (2013) · Benchmarking An International Journal · doi:10.1108/bij-08-2011-0063 · Cited by 68
“More importantly, performance measurement system and environment should match with the firm’s culture and provide data for external comparison and benchmarking (Neely et al. , 1995).”
BackgroundGlobal engineering networks (GEN)
Zhang, Y., Gregory, M., & Shi, Y. (2008) · Journal of Manufacturing Technology Management · doi:10.1108/17410380810853740 · Cited by 41
Self-citationHerzog, N. V., Tonchia, S., & Polajnar, A. (2009) · Computers & Industrial Engineering · doi:10.1016/j.cie.2009.03.015 · Cited by 41
“…work written by Buchmeister (2008), Garengo & Bititci (2007), Neely (1998, 1999), Neely and Al Najjar (2006), Neely, Bourne, and Kennerley (2000), Neely, Gregory, and Platts (1995), Neely, Richards, Mills, Platts, and Bourne (1997), Kuwaiti and Kay (2000), De Toni and Tonchia (2001) and Hudson…”
BackgroundCosenz, F. (2014) · International Journal of Public Administration · doi:10.1080/01900692.2014.952824 · Cited by 53
Can innovation be measured? A framework of how measurement of innovation engages attention in firms
Brattström, A., Frishammar, J., Richtnér, A. D., & Pflueger, D. P. (2018) · Journal of Engineering and Technology Management · doi:10.1016/j.jengtecman.2018.04.003 · Cited by 55
Building absorptive capacity through firm openness in the context of a less-open country
Aliasghar, O., Rose, E. L., & Chetty, S. (2018) · Industrial Marketing Management · doi:10.1016/j.indmarman.2018.11.007 · Cited by 46
Bhadani, K., Asbjörnsson, G., Hulthén, E., & Evertsson, M. (2019) · Minerals Engineering · doi:10.1016/j.mineng.2019.106065 · Cited by 48
Sustainability assessment in the food supply chain: study of a certified product in Italy
León‐Bravo, V., Caniato, F. F. A., & Caridi, M. (2020) · Production Planning & Control · doi:10.1080/09537287.2020.1744761 · Cited by 50
Adna, B. E., & Sukoco, B. M. (2020) · Cogent Business & Management · doi:10.1080/23311975.2020.1843310 · Cited by 57
Performance Measurement Systems
Tonchia, S., & Quagini, L. (2010) · Springer eBooks · doi:10.1007/978-3-642-13235-3_4 · Cited by 42
Hansen, E. G., & Spitzeck, H. H. (2011) · Corporate Governance · doi:10.1108/14720701111159253 · Cited by 55
“Companies use performance management systems (PMS) as means to visualize strategy and support its implementation ( Neely et al. , 2005”
Backgroundde Waal, A. A., Kourtit, K., & Nijkamp, P. J. (2009) · International Journal of Operations & Production Management · doi:10.1108/01443570911005983 · Cited by 56
“Neely et al. (1995) provide an extensive overview of the status of SPM systems and list many research questions which need to be addressed, but ignore the issue of completeness of SPM system implementation.”
BackgroundKhan, H. Z., Halabi, A. K., & Sartorius, K. (2011) · Journal of Accounting in Emerging Economies · doi:10.1108/20421161111138512 · Cited by 58
“Although financial performance measures have conventionally subjugated corporate performance measurement systems, there has been an emergent movement to adopt a more holistic approach that embraces future focused non-financial measures ( Neely et al. , 1995”
BackgroundAbolbashari, M. H., Chang, E. J., Hussain, O. K., & Saberi, M. (2017) · Knowledge-Based Systems · doi:10.1016/j.knosys.2017.11.032 · Cited by 48
Manville, G., Karakas, F., Polkinghorne, M., & Petford, N. (2019) · Production Planning & Control · doi:10.1080/09537287.2019.1582093 · Cited by 27
Gupta, S., Kumar, S., Kamboj, S., Bhushan, B., & Luo, Z. (2019) · Journal of Knowledge Management · doi:10.1108/jkm-07-2018-0466 · Cited by 47
Measuring chain performance beyond supplier–buyer relationships in agri-food chains
Kataike, J., Aramyan, L. H., Schmidt, O., Molnár, A., & Gellynck, X. (2019) · Supply Chain Management An International Journal · doi:10.1108/scm-03-2018-0097 · Cited by 51
Supply chain performance measurement: the case of the traditional food sector in the EU
Gellynck, X., Molnár, A., & Aramyan, L. H. (2008) · Journal on Chain and Network Science · doi:10.3920/jcns2008.x088 · Cited by 40
“…of distribution cost, transaction cost, profit and inventory cost can be used to measure the achievement of the supply chain goal “efficiency” (Neely et al., 1995, Beamon, 1998a) (Neely et al., 1995, Beamon, 1998b, Beamon, 1999, Van der Vorst, 2000, Aramyan, 2007). new competitors and…”
BackgroundResultInfluentialPerformance measurement system for business processes
Alfaro-Saíz, J.-J., Ortíz, Á., & Poler, R. (2007) · Production Planning & Control · doi:10.1080/09537280701599772 · Cited by 40
“Numerous authors (Kaydos 1999, Brown 2002) have explored this area in depth, and the literature contains many examples of performance measurement models that have appeared in the past decade (Neely et al. 1995, Kaplan et al. 1996, Ghalayini et al. 1997, Bititci et al. 1998, Ducq et al. 2000, etc.).”
BackgroundWudhikarn, R., Chakpitak, N., & Neubert, G. (2018) · International Journal of Production Research · doi:10.1080/00207543.2018.1431414 · Cited by 59
“A PMS is defined as ‘the set of metrics used to quantify both the efficiency and effectiveness of actions’ (Neely, Gregory, and Platts 1995).”
BackgroundMethodInfluentialWong, D. T. W., & Ngai, E. W. T. (2025) · Annals of Operations Research · doi:10.1007/s10479-023-05241-5 · Cited by 39
“Previous studies typically measure operations management using time, flexibility, quality, and cost (Neely et al., 1995).”
Analysis of new product development research: 1998-2009
Vinayak, K., & Kodali, R. (2014) · Benchmarking An International Journal · doi:10.1108/bij-06-2012-0040 · Cited by 52
Reverse logistics in Czech companies: increasing interest in performance measurement
Škapa, R., & Klapalová, A. (2012) · Management Research Review · doi:10.1108/01409171211247686 · Cited by 39
Understanding environmental performance variation in manufacturing companies
Bocken, N. M. P., Morgan, D. T., & Evans, S. (2013) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-03-2013-0042 · Cited by 46
Ibrahim, M. A., & Shariff, M. N. M. (2017) · International Journal of Business and Society · doi:10.33736/ijbs.537.2016 · Cited by 49
Sanchez-Marquez, R., Guillem, J. M. A., Salort, E. V., & Vivas, J. M. J. (2019) · Computers in Industry · doi:10.1016/j.compind.2019.103183 · Cited by 49
Patrucco, P. P., Frattini, F., & Benedetto, C. A. D. (2021) · Supply Chain Management An International Journal · doi:10.1108/scm-11-2020-0551 · Cited by 54
Performance Measurement Systems for Circular Supply Chain Management: Current State of Development
Vegter, D., van Hillegersberg, J., & Olthaar, M. (2021) · Sustainability · doi:10.3390/su132112082 · Cited by 50
How do measurement objectives influence the R&D performance measurement system design?
Chiesa, V., Frattini, F., Lazzarotti, V., & Manzini, R. (2007) · Management Research News · doi:10.1108/01409170710733269 · Cited by 39
Efficacy of Lean Metrics in Evaluating the Performance of Manufacturing Systems
Khadem, M. M. R. K., Ali, S. A., & Seifoddini, H. (2008) · International journal of industrial engineering · Cited by 51
System dynamics and innovation in food networks
Fritz, M., & Schiefer, G. W. (2009) · British Food Journal · doi:10.1108/bfj.2009.070111haa.001 · Cited by 41
Uses and misuses of the 'overall equipment effectiveness' for production management
da Costa, S. E. G., & de Lima, E. P. (2003) · IEEE International Engineering Management Conference (IEMC) · doi:10.1109/iemc.2002.1038543 · Cited by 39
Chimhamhiwa, D., van der Molen, P., Mutanga, O., & Rugege, D. (2009) · Computers Environment and Urban Systems · doi:10.1016/j.compenvurbsys.2009.04.001 · Cited by 62
“) (Bourne, Mills, Wilcox, Neely, & Platts, 2000; Neely et al., 2005), identify a minimum set of measures, i.”
BackgroundInfluentialLeveraging Logistics Partnerships: Lessons from Humanitarian Organizations
Samii, R. (2010) · RePub (Erasmus University Rotterdam) · Cited by 120
An Extensible Framework for Analysing Resource Behaviour Using Event Logs
Pika, A., Wynn, M. T., Fidge, C., ter Hofstede, A. H. M., Leyer, M., & van der Aalst, W. M. P. (2014) · Lecture notes in computer science · doi:10.1007/978-3-319-07881-6_38 · Cited by 38
Firm credit risk evaluation: a series two-stage DEA modeling framework
Tsolas, I. E. (2014) · Annals of Operations Research · doi:10.1007/s10479-014-1566-x · Cited by 45
“3.1 Definitions and conceptual framework Performance measurement is the process of quantifying the efficiency and effectiveness of firm operation (Neely et al. 1995; Tangen 2004).”
BackgroundInfluentialE-supply chain operational and behavioural perspectives: an empirical study of Malaysian SMEs
Hafeez, K., Keoy, K. H., Zairi, M., Hanneman, R. A., & Koh, S. C. L. (2009) · International Journal of Production Research · doi:10.1080/00207540903175079 · Cited by 48
“( 1995 ) see performance measurement as ‘the process of quantifying the efficiency and effectiveness of action’.”
BackgroundTowards more efficient logistics: increasing load factor in a shipper’s road transport
Santén, V. (2017) · The International Journal of Logistics Management · doi:10.1108/ijlm-04-2015-0071 · Cited by 42
Managing performance through employee attributes: implications for employee engagement
Lappalainen, P. H., Saunila, M., Ukko, J., Rantala, T., & Rantanen, H. (2019) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-10-2018-0356 · Cited by 60
Performance indicators for measuring the effects of Smart Maintenance
Lundgren, C., Bokrantz, J., & Skoogh, A. (2020) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-03-2019-0129 · Cited by 55
Hina, S. M., Hassan, G., Parveen, M., & Arooj, S. (2020) · Performance Improvement Quarterly · doi:10.1002/piq.21343 · Cited by 48
Madjid Tavana, D., Nazari-Shirkouhi, S., & Kholghabad, H. F. (2021) · Health Care Management Science · doi:10.1007/s10729-021-09550-8 · Cited by 42
CATEGORIES OF SUPPLY CHAIN PERFORMANCE INDICATORS: AN OVERVIEW OF APPROACHES
Leończuk, D. (2016) · Business Management and Education · doi:10.3846/bme.2016.317 · Cited by 42
“Effectiveness is understood as the degree of fulfilment of customer expectations, while efficiency is a measure of the extent to which business assets are used to provide a given level of customer satisfaction (Neely et al. 1995).”
BackgroundInvestigating causal linkages in the balanced scorecard: an Indian perspective
Zahoor, A., & Sahaf, M. A. (2017) · International Journal of Bank Marketing · doi:10.1108/ijbm-09-2016-0128 · Cited by 60
Business model metrics: an open repository
Heikkilä, M., Bouwman, H., Heikkilä, J., Solaimani, S., & Janssen, W. (2015) · Information Systems and e-Business Management · doi:10.1007/s10257-015-0286-3 · Cited by 69
“Existing literature reviews on PM (e.g., Choong 2014; Folan and Browne 2005; Marr 2012; Neely 1994, 2005; Neely et al. 1995, 2000, 2002; Tangen 2004) show an abundance of PM frameworks, approaches and indicators, which can be divided into four categories: PM recommendations, frameworks, systems and…”
BackgroundSustainability Assessment in Manufacturing for Effectiveness: Challenges and Opportunities
Kumar, M., & Mani, M. (2022) · Frontiers in Sustainability · doi:10.3389/frsus.2022.837016 · Cited by 41
“In the context of manufacturing industries, efficiency-based performance measures address customer satisfaction by the firm/manufacturer (internally), keeping in mind the firm’s economic viability; In contrast, effectiveness measures focus on fulfilling customer requirements (Neely et al., 1995).”
BackgroundEsposito, V., Nito, E. D., Iacono, M. P., & Silvestri, L. (2013) · Journal of Intellectual Capital · doi:10.1108/jic-03-2013-0035 · Cited by 42
Applying fuzzy balanced scorecard for evaluating the CRM performance
Shafia, M. A., Mazdeh, M. M., Vahedi, M., & Pournader, M. (2011) · Industrial Management & Data Systems · doi:10.1108/02635571111170622 · Cited by 43
“The metrics in a PMS could be used to achieve certain goals, like supporting decision-making and management control, evaluating the results, motivating people, stimulating learning, improving coordination and communication ( Neely et al. , 1995”
MethodPerformance measurement system: case studies from SMEs in India
Sharma, M. K., & Bhagwat, R. (2007) · International Journal of Productivity and Quality Management · doi:10.1504/ijpqm.2007.013338 · Cited by 37
Wudhikarn, R. (2016) · Journal of Quality in Maintenance Engineering · doi:10.1108/jqme-12-2011-0001 · Cited by 37
Panagopoulos, I., Atkin, C., & Sikora, I. (2017) · Transportation research procedia · doi:10.1016/j.trpro.2017.03.005 · Cited by 37
Peris‐Ortiz, M., García-Hurtado, D., & Devece, C. (2019) · Knowledge Management Research & Practice · doi:10.1080/14778238.2019.1569488 · Cited by 53
“Neely et al. (1995) define an SCS as the process of quantifying action, where measurement is the process of quantification and action leads to performance.”
BackgroundBashir, H. A., & Ojiako, U. (2020) · Journal of Engineering Design · doi:10.1080/09544828.2020.1817347 · Cited by 39
Activity‐based cost management in financial services industry
Hussain, M., & Gunasekaran, A. (2001) · Managing Service Quality · doi:10.1108/09604520110391324 · Cited by 56
Pietro, L. D., Pantano, E., & Virgilio, F. D. (2014) · Journal of Retailing and Consumer Services · doi:10.1016/j.jretconser.2014.02.014 · Cited by 49
“…the Balanced Scorecard (Kaplan and Norton, 1993, 1996, 2001), Performance Prism (Neely et al., 2002), the Cambridge Performance Measurement Process (Neely et al., 1995, 1996), the approaches of the TPM Process (Jones and Schilling, 2000), 7-step TPM Process (Leflar, 2001), and Total Measurement…”
BackgroundThe effectiveness of hospitality service operations: measurement and implementation concerns
Gomes, C. F., Yasin, M. M., & Lisboa, J. V. (2007) · International Journal of Contemporary Hospitality Management · doi:10.1108/09596110710818301 · Cited by 37
Benchmarking performance indices: pitfalls and solutions
Maleyeff, J. (2003) · Benchmarking An International Journal · doi:10.1108/14635770310457511 · Cited by 52
“Authors are careful to distinguish performance management from performance measurement which involves the development of metrics that quantify the “efficiency and effectiveness of action” (Neely et al., 1995).”
BackgroundThe use of context-based environmental indicators in corporate reporting
Haffar, M., & Searcy, C. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.04.202 · Cited by 42
Critical observations on the statistical process control implementation in the UK food industry
Lim, S. A. H., Antony, J., He, Z., & Arshed, N. (2017) · International Journal of Quality & Reliability Management · doi:10.1108/ijqrm-03-2015-0035 · Cited by 36
Ferreira, F. A. F., Jalali, M. S., Ferreira, J. J., Stankevičienė, J., & Marques, C. S. (2015) · Service Business · doi:10.1007/s11628-015-0278-x · Cited by 36
Ferreira, F. A. F., Santos, S. P., Rodrigues, P. M. M., & Spahr, R. W. (2014) · Journal of Business Economics and Management · doi:10.3846/16111699.2012.673504 · Cited by 36
“…2011a), integrated systems for performance measurement, with special emphasis on the BSC, are generally criticized for, among other things, over simplicity and not explicitly specifying how compensations among evaluation criteria are made (Brignall 1992; Neely et al. 1995; Davis, Albright 2004).”
BackgroundPerception of virtual team’s performance: A multinational exercise
Ferreira, P. G. S., de Lima, E. P., & da Costa, S. E. G. (2012) · International Journal of Production Economics · doi:10.1016/j.ijpe.2012.06.025 · Cited by 48
Measurement and management of competences by enterprise social networking
Sardi, A., Garengo, P., & Bititci, U. (2019) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-04-2018-0139 · Cited by 35
“…wide number of intangible assets - see for instance organizational climate (Carlucci and Schiuma, 2012), intellectual capital (Elia et al., 2017; Schiuma and Lerro, 2008) and leadership (Kaplan, 2008) - employees’ competences are recognized as one of the main intangible assets (Neely et al., 2005).”
BackgroundGuertler, B., & Spinler, S. (2015) · Omega · doi:10.1016/j.omega.2015.03.005 · Cited by 40
Integrated performance measurement system for firm's human capital building
Rompho, B., & Siengthai, S. (2012) · Journal of Intellectual Capital · doi:10.1108/14691931211276106 · Cited by 51
A framework for performance measurement during production ramp-up of assembly stations
Doltsinis, S. C., Ratchev, S. M., & Lohse, N. (2013) · European Journal of Operational Research · doi:10.1016/j.ejor.2013.02.051 · Cited by 43
“The need of quantifyi ng every aspect of a system, has gained a lot of attention and significant work has been published, on methods for defining and designing the right performance measurements (de Ron, 1995; Hon, 2005; Kaplan and Norton, 1992; Neely et al., 1995 ).”
MethodPerformance measurement action research
Moss, Q. Z., Alho, J., & Alexander, K. (2007) · Journal of Facilities Management · doi:10.1108/14725960710822277 · Cited by 36
Supply chain flexibility: a state-of-the-art survey
More, D., & Babu, A. S. (2008) · International Journal of Services and Operations Management · doi:10.1504/ijsom.2009.021624 · Cited by 37
Evaluating the impact of digital and financial literacy on MSME performance
Kumar, P., Chandra, A., Shivani, S., & Pillai, V. (2024) · Journal of the International Council for Small Business · doi:10.1080/26437015.2024.2405548 · Cited by 35
“The performance process assesses the efficacy and efficiency of the firm, its activities, and its business processes (Neely et al., 1995).”
Benchmarking the service quality of airlines in the United States: an exploratory analysis
Min, H., & Min, H. (2015) · Benchmarking An International Journal · doi:10.1108/bij-03-2013-0029 · Cited by 35
Stukalina, Y. (2010) · Technological and Economic Development of Economy · doi:10.3846/tede.2010.05 · Cited by 40
Measuring the efficiency of Brazilian post office stores using data envelopment analysis
Borenstein, D., Becker, J. L., & do Prado, V. J. (2004) · International Journal of Operations & Production Management · doi:10.1108/01443570410558076 · Cited by 51
“Other relevant factors must be taken into account, resulting in the development of new approaches ( Neely et al ., 1995”
BackgroundDigital Manufacturing in Smart Manufacturing Systems: Contribution, Barriers, and Future Directions
Choi, S., Jun, C., Zhao, W. B., & Noh, S. D. (2015) · IFIP advances in information and communication technology · doi:10.1007/978-3-319-22759-7_3 · Cited by 35
An empirical analysis of the effect of business incubation process on firm performance in Nigeria
Iyortsuun, A. S. (2017) · Journal of Small Business & Entrepreneurship · doi:10.1080/08276331.2017.1376265 · Cited by 43
The relationship regulator: a buyer-supplier collaborative performance measurement system
Maestrini, V., Martinez, V., Neely, A. D., Luzzini, D., Caniato, F. F. A., & Maccarrone, P. (2018) · International Journal of Operations & Production Management · doi:10.1108/ijopm-10-2016-0595 · Cited by 44
Self-citationInterpretive framework for analyzing lean implementation using ISM and IRP modeling
Chaple, A. P., Narkhede, B. E., Akarte, M., & Raut, R. D. (2018) · Benchmarking An International Journal · doi:10.1108/bij-07-2017-0177 · Cited by 38
Performance management practices in humanitarian organisations
Abidi, H., de Leeuw, S., & Dullaert, W. E. H. (2020) · Journal of Humanitarian Logistics and Supply Chain Management · doi:10.1108/jhlscm-05-2019-0036 · Cited by 48
Strategic framework for implementing smart devices in the construction industry
Silverio-Fernández, M. A., Renukappa, S., & Suresh, S. (2021) · Construction Innovation · doi:10.1108/ci-11-2019-0132 · Cited by 40
Aman, S., & Seuring, S. A. (2021) · Technovation · doi:10.1016/j.technovation.2021.102394 · Cited by 39
SUPPLY CHAIN PERFORMANCE EVALUATION MODELS: A LITERATURE REVIEW
Oubrahim, I., Sefiani, N., & Happonen, A. (2022) · Acta Logistica · doi:10.22306/al.v9i2.298 · Cited by 44
Exploring a knowledge map for urban resilience to climate change
Wang, L. (2022) · Cities · doi:10.1016/j.cities.2022.104048 · Cited by 41
Process improvement within a HR division at a UK police force
Greasley, A. (2004) · International Journal of Operations & Production Management · doi:10.1108/01443570410519015 · Cited by 44
Performance Evaluation of Higher Education; A Necessity
Jalaliyoon, N., & Taherdoost, H. (2012) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2012.06.497 · Cited by 35
“It competitive surroundings, many organizations have identified benchmarking as being of strategic important in the drive for better performance and commitment to gain a competitive merit (Gleich, et al, 2008; Neely et al, 1995).”
BackgroundPoveda, C. A., & Lipsett, M. (2014) · International Journal of Sustainable Development & World Ecology · doi:10.1080/13504509.2013.876677 · Cited by 44
Jusoh, R. (2010) · Global Journal of Business Management · doi:10.5897/ajbm.9000602 · Cited by 48
Metadata
- Authors
- Neely, A., Gregory, M., & Platts, K.
- Affiliations
- University of Cambridge (GB)
- ORCID
- Neely, Andy
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 1995-04-01
- Volume
- 15
- Issue
- 4
- Pages
- 80-116
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W1496178956
- Cited by
- 3,259
- References
- 77
- Citations by year
- 2026: 77 · 2025: 78 · 2024: 85 · 2023: 93 · 2022: 110 · 2021: 124 · 2020: 156 · 2019: 151 · 2018: 175 · 2017: 184 · 2016: 184 · 2015: 237 · 2014: 230 · 2013: 219 · 2012: 199
- FWCI
- 15.85
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- International Journal of Operations & Production Management (publishedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Accounting › Accounting and Organizational Management
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
- Keywords
- performance measurement, performance measurement system design, performance indicators, management control systems, research agenda
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.