Establishment of KPIs for facility performance measurement: review of literature
The DOI matches its Crossref record; 32 of the 32 references it cites were found in a registry or an index.
Abstract
Purpose: The purpose of this paper is to identify key performance indicators (KPIs) and categorize them based on specific aspects of facility performance measurement in order to facilitate a holistic performance assessment. Design/methodology/approach: A qualitative approach, based on the literature, is adopted. This approach relies on an extensive literature search of extant research papers, assessment reports, surveys and presentations to identify KPIs. The KPIs are arranged in appropriate categories based on their purpose and content. Findings: The paper identifies indicators for performance measurement and classifies them into four major categories: financial, physical, functional, and survey‐based. Indicators are arranged from general to the most specific indicators. The list presents indicators with their description, units of measurement, and literature sources. Research limitations/implications: Future research could focus on further analysis of the list of KPIs in order to generate a more concise list of easily measurable indicators that exhibit wide applicability and valid categorization. Practical implications: The lack of proper categorization hampers frequent and widespread use of performance metrics by the industry. This study proposes a list of KPIs and presents it in appropriate categories so it can be used more practically by facility management practitioners. Originality/value: The list of KPIs generated covers aspects of facility performance assessment and shows wider applicability; thus, it could be utilized by practitioners for a holistic assessment of a wide range of facilities.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187 · cited 11×
“…emphasis should be not only on generating a list that incorporates all of the CSFs that contribute to the success of an organization, but also on grouping these CSFs using a certain criterion so that project managers can identify and focus on critical aspects of a project (Belassi and Tukel, 1996).”
BackgroundInfluentialMendell, M. J., & Heath, G. A. (2005) · Indoor Air · doi:10.1111/j.1600-0668.2004.00320.x · Cited by 1,034
Fish Oil, Raynaud's Syndrome, and Undiscovered Public Knowledge
Swanson, D. R. (1986) · Perspectives in Biology and Medicine · doi:10.1353/pbm.1986.0087 · Cited by 866 · cited 1×
“The research method adopted is parallel to the concept of discovery through literature proposed by Swanson (1986), which emphasizes the creation of new knowledge by referring to bibliographic information available in the form of peer-reviewed papers, conference proceedings, and other valid forms of…”
MethodPerformance measurement and performance management
Lebas, M. J. (1995) · International Journal of Production Economics · doi:10.1016/0925-5273(95)00081-x · Cited by 815 · cited 3×
“The selection of performance measures also depends upon the type of users, since different users like managers, supervisors and customers, require different measures for different purposes (Lebas, 1995).”
BackgroundInfluentialAn assessment of critical success factors
Zahidy, I. (1984) · Cited by 679
Performance management in construction: a conceptual framework
Kagioglou, M., Cooper, R., & Aouad, G. F. (2001) · Construction Management and Economics · doi:10.1080/01446190010003425 · Cited by 605
Identifying and using critical success factors
Leidecker, J. K., & Bruno, A. V. (1984) · Long Range Planning · doi:10.1016/0024-6301(84)90163-8 · Cited by 597 · cited 2×
“Moreover, these factors reflect areas that need to be taken care of for managerial or organizational success (Boynton and Zmud, 1984; Leidecker and Bruno, 1984).”
BackgroundSpendolini, M. J. (1992) · Cited by 439
Post‐occupancy evaluation: how to make buildings work better
Preiser, W. (1995) · Facilities · doi:10.1108/02632779510097787 · Cited by 368
Assessing Building Performance
(2006) · Routledge eBooks · doi:10.4324/9780080455228 · Cited by 362 · cited 1×
“Moreover, organizational performance is closely related to a facility’s performance (Preiser and Vischer, 2005).”
Background
Cited by
Life cycle recurrent embodied energy calculation of buildings: A review
Dixit, M. K. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.10.230 · Cited by 171
Self-citationFacility management: current trends and future perspectives
Mari, M., & Poggesi, S. (2014) · International Journal of Globalisation and Small Business · doi:10.1504/ijgsb.2014.067506 · Cited by 13
“, 2007) and key performance indicators (KPIs) (Enoma and Allen, 2007; Lavy et al., 2010; Meng and Minogue, 2011).”
Background
Metadata
- Authors
- Lavy, S., Garcia, J. A., & Dixit, M. K.
- Venue
- Facilities
- Publisher
- Emerald
- Published
- 2010-07-06
- Volume
- 28
- Issue
- 9/10
- Pages
- 440-464
- ISSN
- 0263-2772 (ISSN-L)
- OpenAlex
- W2166762600
- Cited by
- 169
- References
- 32
- FWCI
- 5.05
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.