TPM can go beyond maintenance: excerpt from a case implementation
The DOI matches its Crossref record.
Abstract
Purpose - The aim of this paper is to present a generic model on using the total productive maintenance (TPM) concept in conjunction with ecology oriented manufacturing (EOM) and 5S focusing on their joint strengths in attaining organizational goals in furtherance to the equipment maintenance objectives. Design/methodology/approach - A systematic implementation-framework coupled with the standard tools, techniques and practices has been designed. The framework was applied in a large semiconductor manufacturing company. Findings - It is evident that a well drawn TPM implementation plan not only improves equipment efficiency and effectiveness but also brings appreciable improvements in other areas such as reduction of manufacturing cycle time, size of inventory, customer complaints, and creates cohesive small group autonomous teams and increases the skill and confidence of individuals. The resulting system is found to be more productive in terms of both partial and total productivity measures. This is in line with the current need of manufacturing companies to have an integrated manufacturing management system (IMMS) in order to simultaneously increasing efficiency and improving effectiveness. Practical implications - The applied framework can be mimicked by other manufacturing organizations and similar results could be brought about. As the implementation of TMP in conjunction with the EOM and 5S has come out successful, this can be combined with other manufacturing planning and control (MPC) systems (viz. JIT, MRPII/ERP) to develop an IT-based IMMS. Originality/value - The case study presented here shows that the applications of TPM through the fulfillment of its basic requirements can significantly enhance the accomplishment of organizational objectives beyond the equipment maintenance-subsystem goals and add an array of benefits in the value chain across the various functional areas. © Emerald Group Publishing Limited.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Total productive maintenance: literature review and directions
Ahuja, I. P. S., & Khamba, J. S. (2008) · International Journal of Quality & Reliability Management · doi:10.1108/02656710810890890 · Cited by 574
Maintenance management: literature review and directions
Garg, A., & Deshmukh, S. G. (2006) · Journal of Quality in Maintenance Engineering · doi:10.1108/13552510610685075 · Cited by 539
Total productive maintenance (TPM) implementation practice: A literature review and directions
Jain, A., Bhatti, R., & Singh, H. (2014) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-06-2013-0032 · Cited by 148
Lean production practices and bundles: a comparative analysis
Sahoo, S., & Yadav, S. (2018) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-01-2017-0002 · Cited by 55
Metadata
- Authors
- Ahmed, S., Hj. Hassan, M., & Taha, Z.
- Venue
- Journal of Quality in Maintenance Engineering
- Publisher
- Emerald
- Published
- 2005-03
- Volume
- 11
- Issue
- 1
- Pages
- 19-42
- ISSN
- 1355-2511 (ISSN-L)
- OpenAlex
- W2052442591
- Cited by
- 159
- References
- 0
- FWCI
- 21.98
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: TPM can go beyond maintenance: excerpt from a case implementation. https://app.cochat.ai/papers/10.1108/13552510510589352
- The paper
- Ahmed, S., Hj. Hassan, M., & Taha, Z. (2005). TPM can go beyond maintenance: excerpt from a case implementation. Journal of Quality in Maintenance Engineering. https://doi.org/10.1108/13552510510589352
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.