Purpose – The purpose of this paper is to review the literature on total productive maintenance (TPM) implementation practice... TPM implementation improves productivity and working efficiency of employees and also improves equipment effectiveness and a positive inclination toward company is registered... A total of 148 papers related to TPM implementation in large-scale industries and SMEs were collected, analyzed...

Overview

Integrity signals

Registry

Crossref · 10.1108/ijlss-06-2013-0032

Cites

114 of 114 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Verification

Claims the paper makes

This paper’s full text isn’t openly available, so its claims and self-check weren’t run. The registry and citation checks still apply.

Citations

Cites

Show all 114 references

Research works printed but not linked: 36

  1. Almeanazel, O.T.R. (2010), “Total productive maintenance review and overall equipment effectiveness measurement”, Jordan Journal of Mechanical and Industrial Engineering (JJMIE), Vol. 4 No. 4, pp. 517-522.
  2. Arunraj, K. , Maran, M. and Manikandan, G. (2014), “A review of intangible benefits of total productive maintenance implementation”, Proceedings of Second International Conference on Advances in Industrial Engineering Applications (ICAIEA2014), Anna University, Kotturpuram, pp. 127-130.
  3. Badli Shah, M.Y. (2012), “Total productive maintenance: a study of malaysian automotive SMEs”, Proceedings of the World Congress on Engineering, Vol. 3, 4-6 July, London, ISBN: 978-988-19252-2-0 ISSN: 2078-0958 (Print); ISSN: 2078-0966 (Online).
  4. Basu, R. (2001), “Six sigma to fit sigma”, IIE Solutions, Vol. 33 No. 7, pp. 28-33.
  5. Bhadury, B. (2000), “Management of productivity through TPM”, Productivity, Vol. 41 No. 2, pp. 240-251.
  6. Boban, B. and Jenson, J.E. (2013), “Enhancing overall equipment effectiveness for a manufacturing firm through total productive maintenance”, International Journal of Emerging Technology and Advanced Engineering, Vol. 3 No. 8, pp. 425-429.
  7. Brook, R. (1998), “Total predictive maintenance cuts plant costs”, Plant Engineering, Vol. 52 No. 4, pp. 93-95.
  8. Dogra, M. , Sharma, V.S. , Sachdeva, A. and Dureja, J.S. (2011), “TPM – a key strategy for productivity improvement in process industry”, Journal of Engineering Science and Technology, Vol. 6 No. 1, pp. 1-16.
  9. Dwyer, J. (1999), “More than a maintenance technique”, Works Management, Vol. 52 No. 9, pp. 15-16.
  10. George, M. (2002), Lean Six Sigma: Combining Six Sigma Qualities with Lean Speed, McGraw-Hill, New York, NY.
  11. Harsej, F. and Yusof, S.M. (2011), “Continuous improvement through an integrated maintenance model”, Contemporary Engineering Sciences, Vol. 4 No. 8, pp. 353-362.
  12. Jain, A. , Bhatti, R. , Sharma, S.K. and Jain, R.K. (2012a), “Total productive maintenance (TPM) is an effective tool for minimization of downtime of machine, production losses and scrap – in context of Indian industries”, Proceedings of International Conference on Emerging Trends in Engineering and Technology, 6-7 April, Teeranthankar Mahaveer University, Moradabad.
  13. Jain, A. , Bhatti, R. and Singh, H. (2013a), “Implementation of autonomous maintenance for the improvement of OEE of machines in SMEs – in context of Indian enterprises”, Proceedings of International Conference on smart Technologies in Mechanical Engineering (STME-2013), Paper no. 17, 25-26 October, Delhi Technological University, Delhi, ISBN: 978-93-83083-35-0, pp. 537-544.
  14. Jain, A. , Bhatti, R. and Singh, H. (2014a), “Role of total productive maintenance (TPM) implementation in improvement of Indian SMEs – a theoretical study”, Proceedings of International Conference on Mechanical Engineering: Emerging Trends for Sustainability (IC MEETS-2014), Vol. 2, 29-31 January, MANIT, Bhopal, Paper No. PI3001, pp. 605-612.
  15. Jain, A. , Bhatti, R. , Singh, H. and Sharma, S.K. (2012b), “Implementation of TPM for enhancing OEE of small scale industry”, International Journal of IT, Engineering and Applied Sciences Research (IJIEASR), Vol. 1 No. 1, pp. 125-136.
  16. Katkamwar, S.G. , Wadatkar, S.K. and Paropate, R.V. (2013), “Study of total productive maintenance & its implementing approach in spinning industries”, International Journal of Engineering Trends and Technology (IJETT), Vol. 4 No. 5, pp. 1750-1754.
  17. Lazim, H.M. , Ahmad, N. , Hamid, K.B.A. and Ramayah, T. (2009), “Total employee participation in maintenance activity: a case study of autonomous maintenance approach”, Malaysia Labour Review, Vol. 3 No. 2, pp. 47-62.
  18. Liu, X. (2008), “SME development in China: a policy perspective on SME industrial clustering”, in Lim, H. (Ed), SME in Asia and Globalization, ERIA Research Project Report 2007-5, pp. 37-68.
  19. Nakajima, S. (1988), Introduction to Total Productive Maintenance (TPM), Productivity Press, Portland, OR.
  20. Pai, K.G. (1997), “Maintenance management”, Maintenance Journal, pp. 8-12.
  21. Paropate, R.V. , Jachak, S.R. and Hatwalne, P.A. (2011), “Implementing approach of total productive maintenance (TPM) in Indian industries & theoretical aspect: an overview”, International Journal of Advanced Engineering Science and Technologies, Vol. 6 No. 2, pp. 270-276.
  22. Roup, J. (1999), “Moving beyond TPM to total plant reliability: redefining the concept to optimize benefits”, Plant Engineering, Vol. 53 No. 2, pp. 32-35.
  23. Samanta, B. , Sarkar, B. and Mukherjee, S.K. (2001), “Reliability centered maintenance (RCM) strategy for heavy earth moving machinery in coal mine”, Industrial Engineering Journal, Vol. 30 No. 5, pp. 15-20.
  24. Sangameshwran, P. and Jagannathan, R. (2002), “HLL’s manufacturing renaissance”, Indian Management, pp. 30-35.
  25. Shahanaghi, K. and Yazdian, S.A. (2009), “Analyzing the effects of implementation of total productive maintenance (TPM) in the manufacturing companies: a system dynamics approach”, UK World Journal of Modeling and Simulation, Vol. 5 No. 2, pp. 120-129.
  26. Shamsuddin, A. , Hassan, M.H. and Taha, Z. (2005), “TPM can go beyond maintenance: excerpt from a case implementation”, Journal of Quality in Maintenance Engineering, Vol. 11 No. 1, pp. 19-42. · DOI · Paper page
  27. Sharma, K. , Gera, G. , Kumar, R. , Chaudhary, H.K. and Gupta, S.K. (2012a), “An empirical study approach on TPM implementation in manufacturing industry”, International Journal on Emerging Technologies, Vol. 3 No. 1, pp. 18-23.
  28. Sharma, S.K. , Jain, A. and Jain, R. (2012b), “Total productive maintenance of a thermal system (Steam Power Plant)”, International Journal of Engineering and Innovative Technology (IJEIT), Vol. 2 No. 3, pp. 70-79.
  29. Singer, T. (1999), “Are you using all the features of your CMMS? Following this even-step plan can help uncover new benefits”, Plant Engineering, Vol. 53 No. 1, pp. 32-34.
  30. Telang, A.D. (1998), “Preventive maintenance”, in Vijayakumar, and K. Proceedings of the National Conference on Maintenance and Condition Monitoring, 14 February, Government Engineering College, Institution of Engineers, Cochin Local Centre, Thissur, pp. 160-173.
  31. Jadhav, R.M. , Alessandro, M. and Sawant, S.H. (2013), “Total productive maintenance theoretical aspect: a journey towards manufacturing excellence”, Second International Conference on Emerging Trends in Engineering (SICETE), published in IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), ISSN: 2278-1684, pp. 51-59.
  32. Joshi, R.R. and Naik, G.R. (2012), “Application of SMED methodology – a case study in small scale industry”, International Journal of Scientific and Research Publication, Vol. 2 No. 8, pp. 1-4.
  33. Lazim, H.M. , Ramayah, T. and Ahmad, N. (2008), “Maintenance strategy in Malaysian manufacturing companies: a total productive maintenance (TPM) approach”, International Review of Business Research Papers, Vol. 4 No. 4, pp. 237-250.
  34. Richardson, C.A. (2003), Implementing Total Productive Maintenance, IE 780 S – Lean Manufacturing – Spring, Emerald Group Publishing Limited.
  35. Serna, A.M.D. , López, J.F.A. and Cortes, J.A.Z. (2011), “TPM implementation impact on companies’ competitively in the Medellin metropolitan and Antioquia’s eastern region, Colombia”, International Conference Proceeding, No. 172, pp. 164-170.
  36. Thun, J.H. (2004), “Potential of technology-integrated mobile maintenance for total productive maintenance”, Second World Conference Proceeding on POM, 30 April-3 May, pp. 1-20.

Cited by

See all 148

Metadata

Authors
Jain, A., Bhatti, R., & Singh, H.
Venue
International Journal of Lean Six Sigma
Publisher
Emerald
Published
2014-07-29
Volume
5
Issue
3
Pages
293-323
ISSN
2040-4166 (ISSN-L)
OpenAlex
W2171252213
Cited by
148
References
118
Citations by year
2026: 10 · 2025: 18 · 2024: 19 · 2023: 18 · 2022: 16 · 2021: 24 · 2020: 11 · 2019: 9 · 2018: 9 · 2017: 7 · 2016: 4 · 2015: 3
FWCI
11.80
Type
journal article
Language
en
Open access
closed
Licence
www.emerald.com/insight/site-policies (tdm)
Locations
International Journal of Lean Six Sigma (publishedVersion)
Topics
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
  • Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
  • Physical Sciences › Engineering › Safety, Risk, Reliability and Quality › Reliability and Maintenance Optimization
Keywords
total productive maintenance, TPM implementation, small and medium-sized enterprises, production maintenance, equipment effectiveness, competitive advantage, cost reduction, Indian manufacturing, literature classification, maintenance function, productivity improvement, equipment reliability, maintenance cost reduction

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Total productive maintenance (TPM) implementation practice: A literature review and directions. https://app.cochat.ai/papers/10.1108/ijlss-06-2013-0032
The paper
Jain, A., Bhatti, R., & Singh, H. (2014). Total productive maintenance (TPM) implementation practice: A literature review and directions. International Journal of Lean Six Sigma. https://doi.org/10.1108/ijlss-06-2013-0032

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.