Supply chains in the construction industry
The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Abstract
Purpose: The purpose of this paper is to introduce a special issue about the construction industry and the management of its supply chains. It aims to discuss and point to some differences and possible similarities with traditional manufacturing and its supply chains. Design/methodology/approach: The paper is mostly a literature review and contains official statistics. Findings: The market of the construction company is mostly local and highly volatile. The long durability of the construction “product” contributes to the volatility. The product specification process before the customer order arrives shows different degrees of specifications: engineer to order, modify to order, configure to order, select a variant. (The common make‐to‐stock in traditional manufacturing does not exist.) A construction company only executes a small part of the project by its own personnel and capacity. This is a way of risk spreading and risk mitigation and to compensate for an unstable market. If a construction company wants to establish a new concept, from “engineer to order” to e.g. “configure to order”, it must be engaged earlier in the business process and with other than usual customers, which might complicate the process. Research limitations/implications: Experiences from Sweden and Swedish developments are the main source of information. Originality/value: The paper introduces the articles that are a source of scientifically generated knowledge regarding various problems and opportunities associated with supply chain management in the project‐based construction industry.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The construction industry as a loosely coupled system: implications for productivity and innovation
Dubois, A., & Gadde, L.-E. (2002) · Construction Management and Economics · doi:10.1080/01446190210163543 · Cited by 1,041 · cited 1×
“) reports investigated the current practice of loosely coupled supply chain; Dubois and Gadde (2002)”
Background
Cited by
Construction industry productivity and the potential for collaborative practice
Fulford, R., & Standing, C. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.05.007 · Cited by 259
Li, C. Z., Chen, Z., Xue, F., Kong, X. T. R., Xiao, B., Lai, X., & Zhao, Y. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.125391 · Cited by 222
“The concept of SCM was introduced in the construction industry from the manufacturing industry in the 1980s (Segerstedt et al., 2010).”
Metadata
- Authors
- Segerstedt, A., & Olofsson, T.
- Venue
- Supply Chain Management: An International Journal
- Publisher
- Emerald
- Published
- 2010-08-10
- Volume
- 15
- Issue
- 5
- Pages
- 347-353
- ISSN
- 1359-8546 (ISSN-L)
- OpenAlex
- W2087061365
- Cited by
- 223
- References
- 1
- FWCI
- 11.77
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.