Supply chains in the construction industry
The DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.
Abstract
Purpose: The purpose of this paper is to introduce a special issue about the construction industry and the management of its supply chains. It aims to discuss and point to some differences and possible similarities with traditional manufacturing and its supply chains. Design/methodology/approach: The paper is mostly a literature review and contains official statistics. Findings: The market of the construction company is mostly local and highly volatile. The long durability of the construction “product” contributes to the volatility. The product specification process before the customer order arrives shows different degrees of specifications: engineer to order, modify to order, configure to order, select a variant. (The common make‐to‐stock in traditional manufacturing does not exist.) A construction company only executes a small part of the project by its own personnel and capacity. This is a way of risk spreading and risk mitigation and to compensate for an unstable market. If a construction company wants to establish a new concept, from “engineer to order” to e.g. “configure to order”, it must be engaged earlier in the business process and with other than usual customers, which might complicate the process. Research limitations/implications: Experiences from Sweden and Swedish developments are the main source of information. Originality/value: The paper introduces the articles that are a source of scientifically generated knowledge regarding various problems and opportunities associated with supply chain management in the project‐based construction industry.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Supply Chain Management: Implementation Issues and Research Opportunities
Lambert, D. M., Cooper, M. C., & Pagh, J. D. (1998) · The International Journal of Logistics Management · doi:10.1108/09574099810805807 · Cited by 2,435
An integrated model for the design of agile supply chains
Christopher, M., & Towill, D. (2001) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030110394914 · Cited by 1,052
The construction industry as a loosely coupled system: implications for productivity and innovation
Dubois, A., & Gadde, L.-E. (2002) · Construction Management and Economics · doi:10.1080/01446190210163543 · Cited by 1,041 · cited 1×
“) reports investigated the current practice of loosely coupled supply chain; Dubois and Gadde (2002)”
BackgroundThe four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862 · cited 1×
“Other perspectives and explanations of root causes for low productivity development have been proposed by Vrijhoef and Koskela (2000)”
BackgroundShielding Production: Essential Step in Production Control
Ballard, G., & Howell, G. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:1(11 · Cited by 510
Gann, D. M. (1996) · Construction Management and Economics · doi:10.1080/014461996373304 · Cited by 385 · cited 1×
“Factory (prefabrication) processes and lean production concepts have successfully been adopted in Japan ( Gann, 1996”
BackgroundZephyrs of creative destruction: understanding the management of innovation in construction
Winch, G. (1998) · Building Research & Information · doi:10.1080/096132198369751 · Cited by 339 · cited 1×
“The peculiar relation between design and production in the construction industry has also been recognized by Winch (1998)”
BackgroundSupply strategy and network effects — purchasing behaviour in the construction industry
Dubois, A., & Gadde, L.-E. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00016-2 · Cited by 313 · cited 1×
“The great part, approximately 75 percent and more, of the product's value is built with help from suppliers and subcontractors ( Dubois and Gadde, 2000”
BackgroundClient‐led strategies for construction supply chain improvement
Briscoe, G. H., Dainty, A. R. J., Millett, S. J., & Neale, R. H. (2004) · Construction Management and Economics · doi:10.1080/0144619042000201394 · Cited by 192
Institutions in building projects: Implications for flexibility and change
Kadefors, A. (1995) · Scandinavian Journal of Management · doi:10.1016/0956-5221(95)00017-p · Cited by 182 · cited 1×
“As the demand decreased in the 1970s many of these prefabrication facilities were closed and more work were again performed on-site ( Kadefors, 1995”
Background
Cited by
Construction industry productivity and the potential for collaborative practice
Fulford, R., & Standing, C. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.05.007 · Cited by 259
Li, C. Z., Chen, Z., Xue, F., Kong, X. T. R., Xiao, B., Lai, X., & Zhao, Y. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.125391 · Cited by 222
“The concept of SCM was introduced in the construction industry from the manufacturing industry in the 1980s (Segerstedt et al., 2010).”
Keshavarz-Ghorabaee, M., Amiri, M., Hashemi-Tabatabaei, M., Zavadskas, E. K., & Kaklauskas, A. (2020) · Mathematics · doi:10.3390/math8122202 · Cited by 217
Understanding Construction Supply Chain Management
Behera, P., Mohanty, R. P., & Prakash, A. (2015) · Production Planning & Control · doi:10.1080/09537287.2015.1045953 · Cited by 194
Lean thinking in the highways construction sector: motivation, implementation and barriers
Tezel, A., Koskela, L., & Aziz, Z. (2018) · Production Planning & Control · doi:10.1080/09537287.2017.1412522 · Cited by 165
“…(Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010; Behera, Mohanty, and Prakash 2015; Viana, Formoso, and Isatto 2017; Zegarra and Alarcon 2017).”
Background
Metadata
- Authors
- Segerstedt, A., & Olofsson, T.
- Venue
- Supply Chain Management: An International Journal
- Publisher
- Emerald
- Published
- 2010-08-10
- Volume
- 15
- Issue
- 5
- Pages
- 347-353
- ISSN
- 1359-8546 (ISSN-L)
- OpenAlex
- W2087061365
- Cited by
- 223
- References
- 16
- FWCI
- 11.77
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.