Supply chain performance measurement framework for small and medium scale enterprises
The DOI matches its Crossref record; 21 of the 21 references it cites were found in a registry or an index.
Abstract
Purpose: The purpose of this paper is to propose an integrated supply chain performance measurement framework for the case of small and medium scale enterprises (SMEs) using set of qualitative and quantitative insights gained during the case study research. Design/methodology/approach: This paper develops the supply chain performance measurement framework using the facts revealed through case study analysis, secondary data specific to various SME clusters in India and detailed contemporary studies reported on supply chain management in SMEs. It integrates the salient features of balanced scorecard (BSC) and supply chain operation reference (SCOR) model to deliver a comprehensive performance measurement framework for SMEs. Findings: This paper reports set of performance indicators for the supply chain processes like “source,” “make,” and “deliver” in SMEs. It also relates the measures with various supply chain cycles like “procurement,” “manufacturing,” “replenishment,” and “customer order.” As a result, paper delivers an integrated performance measurement framework for supply chain evaluation and planning in SMEs. It also outlines the detailed guideline for the implementation and use of the framework. Practical implications: This paper is expected that the developed framework: will help SME managers to improve the visibility of their supply chain amongst interacting partners; and will help SME firms to explain the basis of their decisions to the other supply chain partners and specifically, origingal equipment manufacturer organizations where less bargaining power exist. Originality/value: This paper integrates the spirit of two well‐known contributions in the field of performance measurement namely BSC and SCOR. The proposed framework is deduced using the findings of real life case study research and hence establishes an adequate platform for its application. It would help the managers or decision makers in SMEs to gain a systematic insight into their supply chain problems and hence undertake the necessary improvements.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1984) · Cited by 81,983
Hartley, J. (2004) · Essential Guide to Qualitative Methods in Organizational Research · doi:10.4135/9781446280119.n26 · Cited by 15,461
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
(1992) · PubMed · Cited by 7,979
Understanding the small business sector
(1995) · Long Range Planning · doi:10.1016/0024-6301(95)90953-2 · Cited by 4,190
Performance measurement system design: A literature review and research agenda
Neely, A., Gregory, M., & Platts, K. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510083622 · Cited by 3,259 · cited 1×
“A lot many efforts are reported in the literature like various supply chain performance measurement matrices/frameworks and mapping or audit/assessment tools to support the large units ( Neely et al. , 1995”
BackgroundMeasuring supply chain performance
Beamon, B. M. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910249714 · Cited by 2,326 · cited 2×
“For example, Chan and Qi (2003) proposed a process-based PMS for mapping and analyzing complex supply chain networks; van Hoek (2001) emphasizes upon the importance of performance measurement from the view point of the third-party logistics alliances in supply chain; Gunasekaran et al.”
BackgroundA framework for supply chain performance measurement
Gunasekaran, A., Patel, C., & McGaughey, R. E. (2004) · International Journal of Production Economics · doi:10.1016/j.ijpe.2003.08.003 · Cited by 2,191 · cited 1×
“the measures and metrics needed to fully integrate their supply chain to maximize effectiveness and efficiency (Gunasekaran et al., 2004).”
BackgroundPerformance measures and metrics in a supply chain environment
Gunasekaran, A., Patel, C., & Tirtiroglu, E. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110358468 · Cited by 2,025 · cited 1×
“emphasizes upon the importance of performance measurement from the view point of the third-party logistics alliances in supply chain; Gunasekaran et al. (2001)”
BackgroundThe Performance Prism: The Scorecard for Measuring and Managing Business Success
Neely, A. D., Adams, C., & Kennerley, M. (2003) · Cited by 1,028
Performance measurement system design: developing and testing a process‐based approach
Neely, A., Mills, J., Platts, K., Richards, H., Gregory, M., Bourne, M., & Kennerley, M. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010343708 · Cited by 922
Advanced Management Accounting
Mason, W. (1983) · Journal of the Operational Research Society · doi:10.1057/jors.1983.41 · Cited by 916
Theory and practice in SME performance measurement systems
Hudson, M., Smart, A., & Bourne, M. (2001) · International Journal of Operations & Production Management · doi:10.1108/eum0000000005587 · Cited by 855 · cited 1×
“The financial dimension of performance is critical for both large and small companies, but given the lack of a monetary safety, net to absorb the impact of short-term fluctuations resulting from change is paramount in SMEs (Hudson et al., 2001).”
BackgroundA systems perspective on supply chain measurements
Holmberg, S. (2000) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030010351246 · Cited by 475
Linking SCOR planning practices to supply chain performance: An exploratory study
Lockamy, A., & McCormack, K. (2004) · International Journal of Operations & Production Management · doi:10.1108/01443570410569010 · Cited by 410 · cited 1×
“For each SCOR decision area various supply chain planning processes ( Lockamy and McCormack, 2004”
MethodThakkar, J., Deshmukh, S. G., Gupta, A. D., & Shankar, R. (2006) · International Journal of Productivity and Performance Management · doi:10.1108/17410400710717073 · Cited by 222 · cited 1×
“offers nine preconditions necessary for effective and dynamic performance measurement within supply chains which include cheap and reliable identification of units in transition, standard protocols, communication systems that are capable of handling the volume of data, hardware and software, multi-layered control syst…”
BackgroundSelf-citationChan, F. T. S., & Qi, H. J. (2003) · Integrated Manufacturing Systems · doi:10.1108/09576060310463145 · Cited by 204
The context of dominance: an industry‐driven framework for exploiting reputation
Shamsie, J. (2003) · Strategic Management Journal · doi:10.1002/smj.291 · Cited by 195 · cited 1×
“The literature suggests that performance is dependent on strategy continuously recognizing the changes in the external environment (Shamsie, 2003).”
BackgroundStructure, speed and salience: performance measurement in the supply chain
Morgan, C. (2004) · Business Process Management Journal · doi:10.1108/14637150410559207 · Cited by 185 · cited 1×
“develops performance measures and metrics in a supply chain environment; Morgan (2004)”
BackgroundCan the SME survive the supply chain challenges?
Vaaland, T. I., & Heide, M. (2007) · Supply Chain Management: An International Journal · doi:10.1108/13598540710724374 · Cited by 178 · cited 1×
“Others found that “strategic” small firms are likely to have significant capability to grow, expand, innovate, and introduce new products to the market place and achieve greater profitability ( Vaaland and Heide, 2007”
BackgroundIntegrated performance measurement systems: an audit and development guide
Bititci, U., Carrie, A. S., & McDevitt, L. (1997) · The TQM Journal · doi:10.1108/09544789710159443 · Cited by 137
Cited by
Supply chain performance measurement systems: A systematic review and research agenda
Maestrini, V., Luzzini, D., Maccarrone, P., & Caniato, F. (2017) · International Journal of Production Economics · doi:10.1016/j.ijpe.2016.11.005 · Cited by 349
A review on supply chain performance measures and metrics: 2000‐2011
Gopal, P. R. C., & Thakkar, J. (2012) · International Journal of Productivity and Performance Management · doi:10.1108/17410401211232957 · Cited by 168
“, 2001; Shepherd and Gunter, 2006); over time attention moved to other areas namely, application of measures (Lin and Li, 2010), identification of KPIs (Gunasekaran and Kobu (2007), Small and Medium scale Enterprises (Thakkar et al., 2009) and measures for green supply chains (Hervani et al.”
BackgroundSelf-citationMeasuring servitization progress and outcome: the case of ‘advanced services’
Ziaee Bigdeli, A., Baines, T., Schroeder, A., Brown, S., Musson, E., Guang Shi, V., & Calabrese, A. (2018) · Production Planning & Control · doi:10.1080/09537287.2018.1429029 · Cited by 79
“…the importance of performance measures being consistent with organisational goals (Beamon, 1999), specific to the function of interest (Artz et al., 2012), and suitable as early warning signals that draw attention to problems before severely damaging consequences occur (Thakkar et al., 2009).”
Metadata
- Authors
- Thakkar, J., Kanda, A., & Deshmukh, S. G.
- Venue
- Benchmarking: An International Journal
- Publisher
- Emerald
- Published
- 2009-08-28
- Volume
- 16
- Issue
- 5
- Pages
- 702-723
- ISSN
- 1463-5771 (ISSN-L)
- OpenAlex
- W2015363748
- Cited by
- 185
- References
- 21
- FWCI
- 13.80
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.