Assessing readiness for business process reengineering
The DOI matches its Crossref record; 26 of the 26 references it cites were found in a registry or an index.
Abstract
Purpose: The purpose of this paper is to propose how to minimize the risks of implementing business process reengineering (BPR) by measuring readiness. For this purpose, the paper proposes an assessment approach for readiness in BPR efforts based on the critical success and failure factors. Design/methodology/approach: A relevant literature review, which investigates success and failure indicators in BPR efforts is carried out and a new categorized list of indicators are proposed. This is a base for conducting a survey to measure the BPR readiness, which has been run in two companies and compared based on a diamond model. Findings: In this research, readiness indicators are determined based on critical success and failure factors. The readiness indicators include six categories. The first five categories, egalitarian leadership, collaborative working environment, top management commitment, supportive management, and use of information technology are positive indicators. The sixth category, resistance to change has a negative role. This paper reports survey results indicating BPR readiness in two Iranian companies. After comparing the position of the two cases, the paper offers several guidelines for amplifying the success points and decreasing failure points and hence, increasing the rate of success. Originality/value: High‐failure rate of BPR has been introduced as a main barrier in reengineering processes. In addition, it makes a fear, which in turn can be a failure factor. This paper tries to fill the gap in the literature on decreasing risk in BPR projects by introducing a BPR readiness assessment approach. In addition, the proposed questionnaire is generic and can be utilized in a facilitated manner.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
REIJERS, H., & LIMANMANSAR, S. (2005) · Omega · doi:10.1016/j.omega.2004.04.012 · Cited by 540
Business processes—attempts to find a definition
Lindsay, A., Downs, D., & Lunn, K. (2003) · Information and Software Technology · doi:10.1016/s0950-5849(03)00129-0 · Cited by 444 · cited 1×
“Business process reengineering (BPR) is a management tool, in which business processes are examined and redesigned to improve cost efficiency and service effectiveness (Lindsay et al., 2003; Vidovic and Vuhic, 2003).”
BackgroundCritical factors for successful ERP implementation: Exploratory findings from four case studies
Motwani, J., Subramanian, R., & Gopalakrishna, P. (2005) · Computers in Industry · doi:10.1016/j.compind.2005.02.005 · Cited by 354 · cited 6×
“…U U U U U U Dennis et al. (2003) U U U U U U U Grant (2002) U U U U U U U U Guimaraes (1999) U U U U U U U U U U Maull et al. (2003) U U U U U U U U Motwani et al. (2005) U U U U U U U U U U U Ranganathan and Dhaliwal (2001) U U U U U U U U U Reijers and Mansar (2005) U U U U U U U Terziovski et…”
BackgroundInfluentialDeveloping and evaluating a methodology for business process improvement
Adesola, S., & Baines, T. S. (2005) · Business Process Management Journal · doi:10.1108/14637150510578719 · Cited by 303 · cited 1×
“They have tried to be competitive in the global market by changing the way of thinking about " business processes " (Adesola and Baines, 2005; Aversano et al., 2002).”
BackgroundIntegrated process modeling: An ontological evaluation
Green, P., & Rosemann, M. (2000) · Information Systems · doi:10.1016/s0306-4379(00)00010-7 · Cited by 287 · cited 1×
“A cooperative environment with a friendly interaction, in which employees work in teams, has a chance of improving performance (Green and Roseman, 2000; Marir and Mansar, 2004).”
BackgroundInformation technology and business‐process redesign
Attaran, M. (2003) · Business Process Management Journal · doi:10.1108/14637150310484508 · Cited by 243 · cited 4×
“For example, " communication technology " is to make open communication, share information, and create collaborative team working (Attaran, 2003; Tatsiopoulos and Panayiotou, 2000 ).”
BackgroundInfluentialA generic structure for business process modeling
Lin, F., Yang, M., & Pai, Y. (2002) · Business Process Management Journal · doi:10.1108/14637150210418610 · Cited by 228 · cited 1×
“In addition, as per latest concept of management, reengineering is necessary, firstly for facilitating processes across the boundaries of the two organizations and secondly for integrating back-and front-office processes (Fadel and Tanniru, 2005; Lin et al., 2002).”
BackgroundSuccessful predictors of business process reengineering (BPR) in financial services
Terziovski, M., Fitzpatrick, P., & O’Neill, P. (2003) · International Journal of Production Economics · doi:10.1016/s0925-5273(02)00378-x · Cited by 173 · cited 7×
“…U U U U U U U Motwani et al. (2005) U U U U U U U U U U U Ranganathan and Dhaliwal (2001) U U U U U U U U U Reijers and Mansar (2005) U U U U U U U Terziovski et al. (2003) U U U U U U U U U U U Table I. BPR critical success factors in literature review BPMJ 14,4 (under the factor) refers to a…”
BackgroundInfluentialRevisiting BPR: a holistic review of practice and development
Al‐Mashari, M., & Zairi, M. (2000) · Business Process Management Journal · doi:10.1108/14637150010283045 · Cited by 166 · cited 2×
“IT covers the areas of hardware, information system, and communication technology, which provide individuals with the required information (Al-Mashari and Zairi, 2000; Attaran, 2003).”
BackgroundBreaking the rules: success and failure in groupware-supported business process reengineering
Dennis, A. R., Carte, T. A., & Kelly, G. G. (2003) · Decision Support Systems · doi:10.1016/s0167-9236(02)00132-x · Cited by 133 · cited 3×
“Various surveys and assessments reported as many as 60-80 per cent of BPR initiatives having been unsuccessful (Chiplunkar et al., 2003; Dennis et al., 2003).”
BackgroundBPR: alive and well in the public sector
MacIntosh, R. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310462794 · Cited by 132 · cited 1×
“In the last decade, various techniques and tools have been exploited to speed up and enhance the process (Chan and Spedding, 2003; MacIntosh, 2003).”
MethodA survey of business process reengineering practices in Singapore
Ranganathan, C., & Dhaliwal, J. (2001) · Information & Management · doi:10.1016/s0378-7206(01)00087-8 · Cited by 131 · cited 2×
“…U Grant (2002) U U U U U U U U Guimaraes (1999) U U U U U U U U U U Maull et al. (2003) U U U U U U U U Motwani et al. (2005) U U U U U U U U U U U Ranganathan and Dhaliwal (2001) U U U U U U U U U Reijers and Mansar (2005) U U U U U U U Terziovski et al. (2003) U U U U U U U U U U U Table I. BPR…”
BackgroundBusiness process reengineering and performance improvement
Shin, N., & Jemella, D. F. (2002) · Business Process Management Journal · doi:10.1108/14637150210435008 · Cited by 128 · cited 1×
“Contrarily, overlooking the role of IT can result in failure (Motwani et al., 2005; Shin and Jemella, 2002).”
BackgroundQuantitative risk level estimation of business process reengineering efforts
Crowe, T. J., Fong, P. M., Bauman, T. A., & Zayas‐Castro, J. L. (2002) · Business Process Management Journal · doi:10.1108/14637150210449148 · Cited by 104 · cited 13×
“Employees resist changes because of uncertain future initiated by BPR changes including job loss, authority loss, and getting anxious (Crowe et al., 2002; Palmer, 2004).”
BackgroundMethodInfluentialWu, I. (2003) · Information & Management · doi:10.1016/s0378-7206(02)00115-5 · Cited by 95 · cited 1×
“A collection of activities, which gets a set of input and raises a set of outputs, is referred to as a " process " (Temponi, 2006; Wu, 2003).”
BackgroundFactors characterising the maturity of BPR programmes
Maull, R., Tranfield, D., & Maull, W. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310476645 · Cited by 95 · cited 4×
“A clearly defined strategic mission is necessary for reengineering (Maull et al., 2003).”
BackgroundInfluentialA model for implementing BPR based on strategic perspectives: an empirical study
Wu, I. (2002) · Information & Management · doi:10.1016/s0378-7206(01)00099-4 · Cited by 95 · cited 1×
“A reliability of 0.70 or higher is acceptable (Terziovski et al., 2003; Wu, 2002).”
BackgroundInfluentialArchitectures, methods and tools for enterprise engineering
Mertins, K., & Jochem, R. (2005) · International Journal of Production Economics · doi:10.1016/j.ijpe.2004.05.024 · Cited by 87 · cited 1×
“Moreover, it is necessary to investigate the underlying corporate culture that holds the beliefs and values influencing everyone's behavior and expectations (Albano et al., 2001; Guimaraes, 1999; Mertins and Jochem, 2005 ).”
BackgroundA wider view of business process reengineering
Grant, D. A. (2002) · Communications of the ACM · doi:10.1145/503124.503128 · Cited by 83 · cited 5×
“Effective communication is vital to organizational decision making (Grant, 2002; Tatsiopoulos and Panayiotou, 2000).”
BackgroundInfluentialAn integrated multidimensional process improvement methodology for manufacturing systems
Chan, K. K., & Spedding, T. A. (2003) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(03)00002-0 · Cited by 80
Business analysis metrics for business process redesign
Valiris, G., & Glykas, M. (2004) · Business Process Management Journal · doi:10.1108/14637150410548100 · Cited by 70 · cited 1×
“Owing to this fact, most of the organizations have paid special attention to " processes " in recent years (Valiris and Glykas, 2004).”
BackgroundThe integration of activity based costing and enterprise modeling for reengineering purposes
Tatsiópoulos, I. P., & Panayiotou, N. A. (2000) · International Journal of Production Economics · doi:10.1016/s0925-5273(99)00080-8 · Cited by 70 · cited 3×
“Effective communication is vital to organizational decision making (Grant, 2002; Tatsiopoulos and Panayiotou, 2000).”
BackgroundBusiness process reengineering and workflow automation: a technology transfer experience
Aversano, L., Canfora, G., Lucia, A. D., & Gallucci, P. (2002) · Journal of Systems and Software · doi:10.1016/s0164-1212(01)00128-5 · Cited by 50 · cited 1×
“They have tried to be competitive in the global market by changing the way of thinking about " business processes " (Adesola and Baines, 2005; Aversano et al., 2002).”
BackgroundApplication of principles of event related open systems to business process reengineering
Chiplunkar, C., Deshmukh, S. G., & Chattopadhyay, R. (2003) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(03)00029-9 · Cited by 43 · cited 1×
“Various surveys and assessments reported as many as 60-80 per cent of BPR initiatives having been unsuccessful (Chiplunkar et al., 2003; Dennis et al., 2003).”
BackgroundField testing of the proposed predictors of BPR success in manufacturing firms
Guimãrães, T. (1999) · Journal of Manufacturing Systems · doi:10.1016/s0278-6125(99)80012-0 · Cited by 40 · cited 5×
“Moreover, it is necessary to investigate the underlying corporate culture that holds the beliefs and values influencing everyone's behavior and expectations (Albano et al., 2001; Guimaraes, 1999; Mertins and Jochem, 2005 ).”
BackgroundInfluentialA knowledge-centric framework for process redesign
Fadel, K. J., & Tanniru, M. R. (2005) · ACM SIGCPR Conference on Computer Personnel Research (SIGCPR) · doi:10.1145/1055973.1055984 · Cited by 14 · cited 2×
“In addition, as per latest concept of management, reengineering is necessary, firstly for facilitating processes across the boundaries of the two organizations and secondly for integrating back- and front-office processes (Fadel and Tanniru, 2005; Lin et al., 2002).”
Background
Cited by
The critical success factors of business process management
Trkman, P. (2010) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2009.07.003 · Cited by 1,016
A grey-based DEMATEL model for evaluating business process management critical success factors
Bai, C., & Sarkis, J. (2013) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.07.011 · Cited by 464
Empirical research in business process management – analysis of an emerging field of research
Houy, C., Fettke, P., & Loos, P. (2010) · Business Process Management Journal · doi:10.1108/14637151011065946 · Cited by 244
How do collaboration and investments in knowledge management affect process innovation in services?
Ashok, M., Narula, R., & Martinez-Noya, A. (2016) · Journal of Knowledge Management · doi:10.1108/jkm-11-2015-0429 · Cited by 142
Metadata
- Authors
- Abdolvand, N., Albadvi, A., & Ferdowsi, Z.
- Venue
- Business Process Management Journal
- Publisher
- Emerald
- Published
- 2008-07-25
- Volume
- 14
- Issue
- 4
- Pages
- 497-511
- ISSN
- 1463-7154 (ISSN-L)
- OpenAlex
- W2088519873
- Cited by
- 189
- References
- 26
- FWCI
- 16.10
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.