Cited by 41Quality and Supply ManagementManagement and Optimization TechniquesManagement Systems and Quality Improvement

The DOI matches its Crossref record; the references it cites are not checked yet.

The present status of quality and manufacturing management techniques and philosophies within the Libyan iron and steel industry

Abdullah Hokoma, Rajab, Khurshid Khan, Mohammed, Hussain, Khalid·2010·The TQM Journal

Abstract

Purpose: This paper aims to investigate the present status of the implementation levels of total quality management (TQM), just‐in‐time (JIT) and manufacturing resource planning (MRPII) within the iron and steel industry in Libya and the management implications for this industry. Design/methodology/approach: A survey methodology was applied in this investigation using an extensive questionnaire and one‐to‐one interviews within the correspondent Libyan iron and steel industry. Findings: Based on the analysis of the questionnaire survey and the one‐to‐one interview responses, the results show that the strategies applied by the executive management body towards most of the areas that are considered as being crucial in any successful implementation of the investigated quality and manufacturing management techniques and philosophies are not well planned. The actual implementation levels of the TQM, JIT and MRPII practices were found to be in the modest levels within the surveyed industry. The paper has identified limitations within the iron and steel industry in terms of the investigated quality and manufacturing techniques and philosophies, and has pointed to areas where the senior managers need to take action in order to achieve an effective and successful implementation of these techniques and philosophies within their business areas. This is an important finding for the future success of the surveyed industry within Libya. Research limitations/implications: Future research could be applied to cover other industries within Libya in order to investigate how widely these quality and manufacturing management techniques and philosophies from this research are reflected in other Libyan industries. Originality/value: This paper investigates the present implementation status of TQM, JIT, and MRPII within the Libyan iron and steel industry, not covered in previous research. It makes a contribution by providing an insight into what extent the TQM, JIT and MRPII are understood and implemented within the Libyan iron and steel industry.

Overview

Integrity signals

Registry

Crossref · 10.1108/17542731011024309

Cites

Statistics

Recomputing p-values needs the paper’s full text.

Verification

Claims the paper makes

We couldn’t retrieve this paper’s full text, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Citations

The citation lists haven’t been fetched yet

References 12 · Cited by 41

Research works printed but not linked: 21

  1. Aghazadeh, S.M. (2003), “MRP contributes to a company's profitability”, Assembly Automation, Vol. 3 No. 3, pp. 257‐65. · DOI
  2. Azmi, A., Satish, M. and Pletcher, M. (2004), “The perceived impact of JIT implementation on firms' financial/growth performance”, Journal of Manufacturing Technology Management, Vol. 15 No. 2, pp. 118‐30. · DOI
  3. Bedia, A. and Martinez, F. (2002), “Modular simulation tool for modelling JIT manufacturing”, International Journal for Production Research, Vol. 40 No. 7, pp. 1529‐47. · DOI
  4. Bindra, S. and Hokoma, R. (2004), “Challenges and opportunities of automobile pollution control in developing countries”, Proceedings of the International Conference on World Renewable Energy Congress VIII (WREC VIII), Denver, Colorado, USA.
  5. Harnesk, R. and Abrahamsson, L. (2007), “TQM: an act of balance between contradictions”, The TQM Magazine, Vol. 17 No. 6, pp. 531‐40. · DOI
  6. Harrison, D.K. and Petty, D.J. (2002), Systems for Planning and Control in Manufacturing, Butterworth‐Heinemann, Oxford.
  7. Henry, A. (2004), “Analysis of parts requirements variance for a JIT supply chain”, International Journal of Production Research, Vol. 42 No. 2, pp. 417‐30. · DOI
  8. Hokoma, R., Khan, K. and Hussain, K. (2006), “The current status of MRPII implementation in some key manufacturing industries within Libya: a survey investigation”, in Narayanan, S., Gokul Kumar, K., Janardhan Reddy, K. and Kuppan, P. (Eds), CAD/CAM Robotics and Factories of the Future (CARs & FOF – 2006): Proceedings of the 22nd International Conference, Narosa Publishing House, New Delhi.
  9. Hokoma, R., Khan, K. and Hussain, K. (2007), “Investigation of the senior management strategy towards implementing manufacturing, planning and control techniques/philosophies within the Libya cement industry: a case study”, Proceedings of the 23rd ISPE International Conference on CAD/CAM, Robotics and Factories of the Future, Bogota, Colombia.
  10. Hokoma, R., Khan, K. and Hussain, K. (2008a), “An investigation of total quality management implementation status for the oil and gas industry within Libya”, Proceedings of MEQA, 2nd Annual Congress, Dubai, UAE.
  11. Hokoma, R., Khan, K. and Hussain, K. (2008b), “Investigation into the various implementation stages of manufacturing and quality techniques/philosophies within the Libyan cement industry”, Journal of Manufacturing Technology Management, Vol. 19 No. 7, pp. 893‐907. · DOI
  12. Hokoma, R., Tughar, M., Rifai, A., Edaayf, R. and Bindra, S. (2007), “Strategic impact of JIT technique for construction industry”, Proceedings of the 2nd International Engineering Conference on Construction and Development, Gaza, Palestine.
  13. Hokoma, R., Khan, K., Hussain, K., Bindra, S.P., Elhadi, A.R. and Sufia, E.A.R. (2006), “Just in time (JIT) technique for education and training and its possible application in Libya”, Proceedings of the Quality Conference 2006, Tripoli, Libya.
  14. Li, Y. and Man, K.F. (2000), “Genetic algorithm to production planning and scheduling problems for manufacturing systems”, Production Planning and Control, Vol. 11 No. 5, pp. 443‐58. · DOI
  15. McBurney, P. and Simon, G. (2002), “Forecasting market demands for new telecommunications services: an introduction”, Telematics and Informatics, Vol. 19 No. 3, pp. 225‐49. · DOI
  16. McHardy, P. and Allan, T. (2000), “Closing the gap between what industry needs and what HE provides”, Education + Training, Vol. 42 No. 9, pp. pp‐496‐508. · DOI
  17. McMullen, P.R. (2001), “An ant colony optimisation approach to addressing a JIT sequencing problem with multiple objectives”, Journal of Artificial Intelligence in Engineering, Vol. 15, pp. 309‐17. · DOI
  18. Oakland, J.S.M. (2000), Total Quality Management, Butterworth‐Heinemann, Oxford.
  19. Pallant, J. (2005), SPSS Survival Manual, 2nd ed., Open University Press, Buckingham.
  20. Rifai, A.M., Hokoma, R.A., Esbiga, M. and Hala, M.O. (2006), “The strategy applied towards implementing JIT and MRPII planning and control techniques within Libyan construction and cement industries”, Proceedings of the International Conference on Technology Management (ICTM), Kuala Lumpur, Malaysia.
  21. Tughar, M., Rifai, A., Bindra, S., Edaayf, R. and Hokoma, R. (2007), “Management of energy and water saving for concrete structures in coastal states”, Proceedings of 1st International Conference and Exhibition on Environmental Impact of Energy and Water Saving in Tourism Industry, International Energy Foundation, Tripoli, Libya.

Metadata

Authors
Abdullah Hokoma, R., Khurshid Khan, M., & Hussain, K.
Affiliations
University of Bradford (GB)
Venue
The TQM Journal
Publisher
Emerald
Published
2010-03-02
Volume
22
Issue
2
Pages
209-221
ISSN
  • 0954-478X (ISSN-L)
  • 1754-2731
OpenAlex
W1963598202
Cited by
41
References
12
Citations by year
2026: 1 · 2025: 1 · 2024: 1 · 2023: 1 · 2022: 1 · 2021: 5 · 2020: 1 · 2017: 3 · 2016: 4 · 2015: 4 · 2014: 8 · 2013: 6 · 2012: 1
FWCI
6.97
Type
journal article
Language
en
Open access
closed
Locations
The TQM Journal (publishedVersion)
Topics
  • Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Management Systems and Quality Improvement
Keywords
total quality management, just-in-time, MRP II, iron and steel industry, management implementation

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: The present status of quality and manufacturing management techniques and philosophies within the Libyan iron and steel industry. https://app.cochat.ai/papers/10.1108/17542731011024309
The paper
Abdullah Hokoma, R., Khurshid Khan, M., & Hussain, K. (2010). The present status of quality and manufacturing management techniques and philosophies within the Libyan iron and steel industry. The TQM Journal. https://doi.org/10.1108/17542731011024309