A survey of current status of and perceived changes required for BIM adoption in the UK
The DOI matches its Crossref record.
Abstract
Purpose: – Construction organisations are mandated to use Building Information Modelling (BIM) for Government projects from 2016. The purpose of this paper is to investigate the current status of the management aspects of BIM. Design/methodology/approach: – Following a telephone sift, a web-based questionnaire was conducted with UK construction BIM experts with 92 responses. Findings: – This research demonstrates a paradigm shift in construction as operations were deemed more important than the technical aspects of BIM Adoption. Respondents agree with enforced Level 2 BIM, demonstrating client demand is a significant driver on uptake. BIM use will substantially increase in the next five years. Ranking of the importance of current BIM standards indicated BS1192 was most used but almost a third adopted individual standards producing fragmentation. BIM’s effect on consultant fees indicated the need for structural change. Practical implications: – Front end design via BIM models and clash detection outweighed the use for facilities management indicating industry were meeting the target but not exploiting BIM to its full potential. Design and build and framework arrangements were the most common BIM procurement routes. Fragmentation of standards use creates a future interoperability problem between BIM systems. Social implications: – Design team structure changes are supported with the adoption of a separate BIM manager being popular. Analysis of industry-wide model hosting characteristics indicated individual disciplines managed their own models meaning without an additional target for Level 3 BIM the single model environment is unlikely to be widely adopted. Originality/value: – BIM fee structure and procurement are investigated for the first time
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Abioye, S. O., Oyedele, L. O., Akanbi, L., Ajayi, A., Davila Delgado, J. M., Bilal, M., Akinade, O. O., & Ahmed, A. (2021) · Journal of Building Engineering · doi:10.1016/j.jobe.2021.103299 · Cited by 1,015
“BIM is the current state-of-art in the architecture, engineering and construction (AEC) industry being adopted worldwide [111].”
BackgroundDavila Delgado, J. M., Oyedele, L., Ajayi, A., Akanbi, L., Akinade, O., Bilal, M., & Owolabi, H. (2019) · Journal of Building Engineering · doi:10.1016/j.jobe.2019.100868 · Cited by 607
“The UK mandate for the use of BIM Level 2 for all public construction projects in 2016 caused great disruption and stress, but it demonstrated that client requirement is a significant driver for uptake [32].”
Augmented and Virtual Reality in Construction: Drivers and Limitations for Industry Adoption
Davila Delgado, J. M., Oyedele, L., Beach, T., & Demian, P. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001844 · Cited by 205
BIM and the small construction firm: a critical perspective
Dainty, A., Leiringer, R., Fernie, S., & Harty, C. (2017) · Building Research & Information · doi:10.1080/09613218.2017.1293940 · Cited by 202
Qin, X., Shi, Y., Lyu, K., & Mo, Y. (2020) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/jcem.2020.12176 · Cited by 154
Metadata
- Authors
- Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S.
- Venue
- Built Environment Project and Asset Management
- Publisher
- Emerald
- Published
- 2015-02-02
- Volume
- 5
- Issue
- 1
- Pages
- 4-21
- ISSN
- 2044-124X (ISSN-L)
- 2044-1258
- OpenAlex
- W2027537043
- Cited by
- 88
- References
- 0
- FWCI
- 6.76
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: A survey of current status of and perceived changes required for BIM adoption in the UK. https://app.cochat.ai/papers/10.1108/bepam-07-2013-0023
- The paper
- Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2015). A survey of current status of and perceived changes required for BIM adoption in the UK. Built Environment Project and Asset Management. https://doi.org/10.1108/bepam-07-2013-0023
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.