Asking questions, analysing answers: relative importance revisited
The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Abstract
Purpose: – Construction management research (CMR) surveys frequently use questionnaires that employ “Likert-type” items, Likert-items, and Likert scales to capture respondents ' self-reported attitudes. This Editorial builds substantially on earlier observations by Holt regarding the significance of appropriate questionnaire response scale design and, use of the relative importance index (RII) method to analyse those data such scales yield. The paper aims to discuss these issues. Design/methodology/approach: – Several RII models are examined by their application to a data set. Objectives include to contrast their practicality in use, compare outputs, highlight limitations of some models and discuss methods of RII data analysis, interrogation and interpretation. Findings: – Principal messages are: all components of response scales should be carefully designed; alternative RII models can produce similar results of analysis; “simple percentage” RII models may not yield “real” percentages; the minimum rating scale integer should accurately reflect its descriptor; only rating scales offering a “0” response, or an “adjusted percentage” RII model can achieve unity; and RII outputs should be interpreted cautiously. Research limitations/implications: – Uncertain application of the RII has been observed within CMR literature, so implications of the Editorial will be of direct relevance to this research community (and beyond). Originality/value: – Aside from that cited above, no additional literature has been identified that specifically links RII usage to CMR.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Likert scales, levels of measurement, and the “laws” of statistics
Norman, G. (2010) · Advances in Health Sciences Education · doi:10.1007/s10459-010-9222-y · Cited by 4,850
Cited by
Hosseini, M. R., Banihashemi, S., Chileshe, N., Namzadi, M. O., Udaeja, C., Rameezdeen, R., & McCuen, T. (2016) · Construction Economics and Building · doi:10.5130/ajceb.v16i3.5159 · Cited by 195
“In line with the recommendation by Holt (2014) for identifying the relative importance of a set of variables, respondents were asked to rate their level of agreement with regard to the influence of each of described barriers in form of a five-point Likert-scale (1 = strongly disagree, 2 = disagree,…”
BackgroundBarriers to implementing reverse logistics in South Australian construction organisations
Chileshe, N., Rameezdeen, R., Hosseini, M. R., & Lehmann, S. (2015) · Supply Chain Management: An International Journal · doi:10.1108/scm-10-2014-0325 · Cited by 121
Metadata
- Authors
- Holt, G. D.
- Venue
- Construction Innovation
- Publisher
- Emerald
- Published
- 2014-01-06
- Volume
- 14
- Issue
- 1
- Pages
- 2-16
- ISSN
- 1471-4175 (ISSN-L)
- OpenAlex
- W2031018564
- Cited by
- 230
- References
- 1
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Asking questions, analysing answers: relative importance revisited. https://app.cochat.ai/papers/10.1108/ci-06-2012-0035
- The paper
- Holt, G. D. (2014). Asking questions, analysing answers: relative importance revisited. Construction Innovation. https://doi.org/10.1108/ci-06-2012-0035
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.