Just‐In‐Time Production System: Some Requirements for Implementation
The DOI matches its Crossref record.
Abstract
Many consider that Japanese manufacturing management techniques are among several factors which have contributed to Japan's superior quality and high growth rate of productivity. Just‐In‐Time (JIT) is one of the best known Japanese production management systems amongst management in the Western industrialised nations. In this paper the JIT manufacturing system and its key features are discussed. The important prerequisites and factors that are required for implementation of JIT in Western industrialised nations are then elaborated on. It is concluded that proper implementation of the JIT production system requires many changes in the organisation; yet successful implementation results in improved productivity and higher quality.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Lean manufacturing: context, practice bundles, and performance
Shah, R., & Ward, P. T. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00108-0 · Cited by 2,897
“(1) Sugimori et al. (1977); Monden (1981); Pegels (1984); (2) Wantuck (1983); (3) Lee and Ebrahimpour (1984) ; (4) Suzaki (1985); (5) Finch and Cox (1986); (6) Voss and Robinson (1987); (7) Hay (1988); (8) Bicheno (1989); (9) Chan et al. (1990); (10) Piper and McLachlin (1990); (11) White (1993); (12) Shingo Prize Gui…”
KANNAN, V (2005) · Omega · doi:10.1016/j.omega.2004.03.012 · Cited by 720
“These include the relationship of JIT to other manufacturing practices [12,13], vendor and customer relations [14–17], and JIT implementation [18–23].”
BackgroundPilkington, A., & Meredith, J. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2008.08.001 · Cited by 537
The Impact of Just-in-Time Manufacturing and Its Infrastructure on Manufacturing Performance
Sakakibara, S., Flynn, B. B., Schroeder, R. G., & Morris, W. T. (1997) · Management Science · doi:10.1287/mnsc.43.9.1246 · Cited by 462
JIT Manufacturing: A Survey of Implementations in Small and Large U.S. Manufacturers
White, R. E., Pearson, J. N., & Wilson, J. R. (1999) · Management Science · doi:10.1287/mnsc.45.1.1 · Cited by 416
Metadata
- Authors
- Lee, S. M., & Ebrahimpour, M.
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 1984-04-01
- Volume
- 4
- Issue
- 4
- Pages
- 3-15
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W2004143502
- Cited by
- 101
- References
- 0
- FWCI
- 0.00
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Just‐In‐Time Production System: Some Requirements for Implementation. https://app.cochat.ai/papers/10.1108/eb054721
- The paper
- Lee, S. M., & Ebrahimpour, M. (1984). Just‐In‐Time Production System: Some Requirements for Implementation. International Journal of Operations & Production Management. https://doi.org/10.1108/eb054721
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.