THE HIDDEN COST OF TRANSPORTATION OF CONSTRUCTION MATERIALS: AN OVERVIEW
The DOI matches its Crossref record.
Abstract
Abstract Construction is possibly one of the most cost orientated industries in any economy. The primary mode of supplier selection has always tended to be on the basis of lowest material or service cost at point of consumption. Indeed, this remains the case even in the post‐Latham (1994) and Egan (1998) world in which we live. In general, construction cost estimates are based on a straight 'take off' of the quantities required. All further 'other' costs in the form of overhead, profit, labour and wastage are consolidated into the cost of the materials. Construction is unique within the various industries making up a modern economy in that the bulk of the materials and components that it uses are of relatively low value while being of high volume. Consequently, a significant proportion of the 'other' costs associated with materials purchases must be in the form of transportation from the point of extraction and / or production to the point of consumption. This paper provides an overview of the hidden costs associated with the transportation of construction materials within the industry and proposes improved methods of managing the logistics of the construction process e.g. reverse logistics, in order to reduce costs and increase the basic sustainability of the construction process.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
Irizarry, J., Karan, E. P., & Jalaei, F. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.005 · Cited by 481
Chileshe, N., Rameezdeen, R., Hosseini, M. R., Martek, I., Li, H. X., & Panjehbashi-Aghdam, P. (2018) · Waste Management · doi:10.1016/j.wasman.2018.07.013 · Cited by 144
Flexible and transportable robotic timber construction platform – TIM
Wagner, H. J., Alvarez, M., Kyjanek, O., Bhiri, Z., Buck, M., & Menges, A. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103400 · Cited by 127
Dobrzanski, E., Schnell, J., Zhang, W., Ferreira, E. S., Keränen, J., Agrawal, P., Yuan, Y., Chen, R., Tiwary, P., & Cranston, E. D. (2025) · Advanced Sustainable Systems · doi:10.1002/adsu.202400986 · Cited by 1
Metadata
- Authors
- Shakantu, W., Tookey, J. E., & Bowen, P. A.
- Venue
- Journal of Engineering, Design and Technology
- Publisher
- Emerald
- Published
- 2003-01
- Volume
- 1
- Issue
- 1
- Pages
- 103-118
- ISSN
- 1726-0531 (ISSN-L)
- OpenAlex
- W2048491848
- Cited by
- 54
- References
- 0
- FWCI
- 0.00
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: THE HIDDEN COST OF TRANSPORTATION OF CONSTRUCTION MATERIALS: AN OVERVIEW. https://app.cochat.ai/papers/10.1108/eb060892
- The paper
- Shakantu, W., Tookey, J. E., & Bowen, P. A. (2003). THE HIDDEN COST OF TRANSPORTATION OF CONSTRUCTION MATERIALS: AN OVERVIEW. Journal of Engineering, Design and Technology. https://doi.org/10.1108/eb060892
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.