CoChat

Key factors for the BIM adoption by architects: a China study

Ding, Zhikun, Zuo, Jian, Wu, Jinchuang, Wang, JY · 2015 · Engineering, Construction and Architectural Management
Cited by 196

The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.

Abstract

Purpose: – There has been a growing attention to building information modeling (BIM) globally due to its benefits to various stages of a building’s life cycle. To facilitate the implementation of BIM in the construction industry effectively, the purpose of this paper is to gain a better understanding of the mechanism for BIM adoption by practitioners such as architects. Design/methodology/approach: – A questionnaire survey of architects is conducted in Shenzhen, China. A structural equation model is built with survey data to identify the key factors affecting architects’ BIM adoption in the design firms. Findings: – It is found that motivation, technical defects of BIM and BIM capability are the statistically significant factors affecting architects’ BIM adoption whereas management support and knowledge structure are not. Research limitations/implications: – Only one architectural, engineering and construction (AEC) profession, i.e. architects were selected as research participants. In future, other professions such as construction engineers, project managers, etc. should be investigated with respect to their BIM adoption issues. Practical implications: – BIM technology developers should improve the technology along the objectives of economic benefits, effectiveness and efficiency of BIM adoption. The compatibility and integration between BIM and other widely available software in the industry should also be improved. Moreover, AEC company and project managers should provide architects with opportunities of BIM training so that architects are more likely to apply BIM in future projects. Originality/value: – A quantitative theoretical model, i.e. structural equation model is built to identify key factors affecting architects’ BIM adoption, which takes one step further to reveal the BIM adoption mechanism in contrast to previous descriptive-oriented studies.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1108/ecam-04-2015-0053

Cites

2 of 2 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 196

Metadata

Authors
Ding, Z., Zuo, J., Wu, J., & Wang, J.
Venue
Engineering, Construction and Architectural Management
Publisher
Emerald
Published
2015-11-16
Volume
22
Issue
6
Pages
732-748
ISSN
0969-9988 (ISSN-L)
OpenAlex
W2176249530
Cited by
196
References
2
FWCI
17.13
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Key factors for the BIM adoption by architects: a China study. https://app.cochat.ai/papers/10.1108/ecam-04-2015-0053
The paper
Ding, Z., Zuo, J., Wu, J., & Wang, J. (2015). Key factors for the BIM adoption by architects: a China study. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ecam-04-2015-0053

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.