Key factors for the BIM adoption by architects: a China study
The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Abstract
Purpose: – There has been a growing attention to building information modeling (BIM) globally due to its benefits to various stages of a building’s life cycle. To facilitate the implementation of BIM in the construction industry effectively, the purpose of this paper is to gain a better understanding of the mechanism for BIM adoption by practitioners such as architects. Design/methodology/approach: – A questionnaire survey of architects is conducted in Shenzhen, China. A structural equation model is built with survey data to identify the key factors affecting architects’ BIM adoption in the design firms. Findings: – It is found that motivation, technical defects of BIM and BIM capability are the statistically significant factors affecting architects’ BIM adoption whereas management support and knowledge structure are not. Research limitations/implications: – Only one architectural, engineering and construction (AEC) profession, i.e. architects were selected as research participants. In future, other professions such as construction engineers, project managers, etc. should be investigated with respect to their BIM adoption issues. Practical implications: – BIM technology developers should improve the technology along the objectives of economic benefits, effectiveness and efficiency of BIM adoption. The compatibility and integration between BIM and other widely available software in the industry should also be improved. Moreover, AEC company and project managers should provide architects with opportunities of BIM training so that architects are more likely to apply BIM in future projects. Originality/value: – A quantitative theoretical model, i.e. structural equation model is built to identify key factors affecting architects’ BIM adoption, which takes one step further to reveal the BIM adoption mechanism in contrast to previous descriptive-oriented studies.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Byrne, B. M. (2013) · doi:10.4324/9780203805534 · Cited by 4,016
Users-orientated evaluation of building information model in the Chinese construction industry
Xu, H., Feng, J., & Li, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.12.004 · Cited by 165
Cited by
BIM compatibility and its differentiation with interoperability challenges as an innovation factor
Shirowzhan, S., Sepasgozar, S. M. E., Edwards, D. J., Li, H., & Wang, C. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103086 · Cited by 164
Qin, X., Shi, Y., Lyu, K., & Mo, Y. (2020) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/jcem.2020.12176 · Cited by 154
Metadata
- Authors
- Ding, Z., Zuo, J., Wu, J., & Wang, J.
- Venue
- Engineering, Construction and Architectural Management
- Publisher
- Emerald
- Published
- 2015-11-16
- Volume
- 22
- Issue
- 6
- Pages
- 732-748
- ISSN
- 0969-9988 (ISSN-L)
- OpenAlex
- W2176249530
- Cited by
- 196
- References
- 2
- FWCI
- 17.13
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Key factors for the BIM adoption by architects: a China study. https://app.cochat.ai/papers/10.1108/ecam-04-2015-0053
- The paper
- Ding, Z., Zuo, J., Wu, J., & Wang, J. (2015). Key factors for the BIM adoption by architects: a China study. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ecam-04-2015-0053
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.