Key factors for the BIM adoption by architects: a China study
The DOI matches its Crossref record; 51 of the 51 references it cites were found in a registry or an index.
Abstract
Purpose: – There has been a growing attention to building information modeling (BIM) globally due to its benefits to various stages of a building’s life cycle. To facilitate the implementation of BIM in the construction industry effectively, the purpose of this paper is to gain a better understanding of the mechanism for BIM adoption by practitioners such as architects. Design/methodology/approach: – A questionnaire survey of architects is conducted in Shenzhen, China. A structural equation model is built with survey data to identify the key factors affecting architects’ BIM adoption in the design firms. Findings: – It is found that motivation, technical defects of BIM and BIM capability are the statistically significant factors affecting architects’ BIM adoption whereas management support and knowledge structure are not. Research limitations/implications: – Only one architectural, engineering and construction (AEC) profession, i.e. architects were selected as research participants. In future, other professions such as construction engineers, project managers, etc. should be investigated with respect to their BIM adoption issues. Practical implications: – BIM technology developers should improve the technology along the objectives of economic benefits, effectiveness and efficiency of BIM adoption. The compatibility and integration between BIM and other widely available software in the industry should also be improved. Moreover, AEC company and project managers should provide architects with opportunities of BIM training so that architects are more likely to apply BIM in future projects. Originality/value: – A quantitative theoretical model, i.e. structural equation model is built to identify key factors affecting architects’ BIM adoption, which takes one step further to reveal the BIM adoption mechanism in contrast to previous descriptive-oriented studies.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Herne, H., Cooley, W. W., & Lohnes, P. R. (1973) · Journal of the Royal Statistical Society. Series A (General) · doi:10.2307/2344428 · Cited by 35,697
(1980) · Medical Entomology and Zoology · Cited by 25,810
Byrne, B. M. (2013) · doi:10.4324/9780203805534 · Cited by 4,016
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry
Azhar, S. (2011) · Leadership and Management in Engineering · doi:10.1061/(asce)lm.1943-5630.0000127 · Cited by 2,192
Netemeyer, R., Bearden, W., & Sharma, S. (2003) · Sage eBooks · doi:10.4135/9781412985772 · Cited by 2,118
Succar, B. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.10.003 · Cited by 1,741
Tang, P., Huber, D., Akinci, B., Lipman, R., & Lytle, A. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.06.007 · Cited by 1,139
Understanding and facilitating BIM adoption in the AEC industry
Gu, N., & London, K. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.09.002 · Cited by 912
How to measure the benefits of BIM — A case study approach
Barlish, K., & Sullivan, K. T. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.02.008 · Cited by 894
Zhang, S., Teizer, J., Lee, J.-K., Eastman, C. M., & Venugopal, M. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.05.006 · Cited by 835
Analysing factors affecting delays in Indian construction projects
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.10.004 · Cited by 745
Technology adoption in the BIM implementation for lean architectural practice
Arayıcı, Y., Coates, P., Koskela, L., Kagioglou, M., Usher, C., & O'Reilly, K. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.09.016 · Cited by 726
Interaction of Lean and Building Information Modeling in Construction
Sacks, R., Koskela, L., Dave, B. A., & Owen, R. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000203 · Cited by 689
Cost escalation and schedule delays in road construction projects in Zambia
Kaliba, C., Muya, M., & Mumba, K. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.07.003 · Cited by 596
Building Information Modeling (BIM) partnering framework for public construction projects
Porwal, A., & Hewage, K. N. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.004 · Cited by 482
Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
Irizarry, J., Karan, E. P., & Jalaei, F. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.005 · Cited by 481
Value proposition on interoperability of BIM and collaborative working environments
Grilo, A., & Jardim-Goncalves, R. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.11.003 · Cited by 450
Specifying parametric building object behavior (BOB) for a building information modeling system
Lee, G., Sacks, R., & Eastman, C. M. (2005) · Automation in Construction · doi:10.1016/j.autcon.2005.09.009 · Cited by 396
Cheng, T., & Teizer, J. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.10.017 · Cited by 394
A knowledge-based BIM system for building maintenance
Motawa, I., & Almarshad, A. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.09.008 · Cited by 379
Building information modelling (BIM) for sustainable building design
Wong, K., & Fan, Q. (2013) · Facilities · doi:10.1108/02632771311299412 · Cited by 349
Sacks, R., Radosavljevic, M., & Barak, R. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.02.010 · Cited by 345
BIM and ontology-based approach for building cost estimation
Lee, S., Kim, K.-R., & Yu, J.-H. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.10.020 · Cited by 340
Identifying and assessing critical risk factors for BIM projects: Empirical study
Chien, K.-F., Wu, Z.-H., & Huang, S.-C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.012 · Cited by 317
Exchange Model and Exchange Object Concepts for Implementation of National BIM Standards
Eastman, C. M., Jeong, Y.-S., Sacks, R., & Kaner, I. (2009) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2010)24:1(25 · Cited by 315
Where to Focus for Successful Adoption of Building Information Modeling within Organization
Won, J., Lee, G., Dossick, C., & Messner, J. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000731 · Cited by 267
THE PERCEIVED VALUE OF BUILDING INFORMATION MODELING IN THE U.S. BUILDING INDUSTRY
Becerik-Gerber, B., & Rice, S. (2010) · Cited by 261
Identifying the critical factors affecting schedule performance of public housing projects
Hwang, B., Zhao, X., & Ng, S. Y. (2012) · Habitat International · doi:10.1016/j.habitatint.2012.06.008 · Cited by 197
Design error reduction: toward the effective utilization of building information modeling
Love, P. E. D., Edwards, D. J., Han, S. W., & Goh, Y. M. (2011) · Research in Engineering Design · doi:10.1007/s00163-011-0105-x · Cited by 195
Pikas, E., Sacks, R., & Hazzan, O. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000765 · Cited by 184
Teaching construction project management with BIM support: Experience and lessons learned
Peterson, F., Hartmann, T., Fruchter, R., & Fischer, M. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.09.009 · Cited by 178
Li, H., Chen, Z., Liang, Y. Q., & Kong, S. C. W. (2004) · Automation in Construction · doi:10.1016/j.autcon.2004.08.007 · Cited by 178
Users-orientated evaluation of building information model in the Chinese construction industry
Xu, H., Feng, J., & Li, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.12.004 · Cited by 165
From justification to evaluation: Building information modeling for asset owners
Love, P. E. D., Simpson, I., Hill, A., & Standing, C. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.05.008 · Cited by 154
BIMQL – An open query language for building information models
Mazairac, W., & Beetz, J. (2013) · Advanced Engineering Informatics · doi:10.1016/j.aei.2013.06.001 · Cited by 147
Nikas, A., Poulymenakou, A., & Kriaris, P. (2006) · Automation in Construction · doi:10.1016/j.autcon.2006.10.003 · Cited by 137
Chung, B. Y., Skibniewski, M. J., Lucas, H. C., & Kwak, Y. H. (2008) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2008)22:6(373 · Cited by 126
Selection of an ERP system for a construction firm in Taiwan: A case study
Yang, J.-B., Wu, C.-T., & Tsai, C.-H. (2007) · Automation in Construction · doi:10.1016/j.autcon.2007.02.001 · Cited by 124
Developing ERP Systems Success Model for the Construction Industry
Chung, B., Skibniewski, M. J., & Kwak, Y. H. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:3(207 · Cited by 121
Skibniewski, M. J., & Ghosh, S. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:10(965 · Cited by 113
Ontology-Based Partial Building Information Model Extraction
Zhang, L., & Issa, R. R. A. (2012) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000277 · Cited by 106
Modelling the costs of corporate implementation of building information modelling
Olatunji, O. A. (2011) · Journal of Financial Management of Property and Construction · doi:10.1108/13664381111179206 · Cited by 98
The use of interorganisational ICT in United States construction projects
Adriaanse, A., Voordijk, H., & Dewulf, G. P. M. R. (2009) · Automation in Construction · doi:10.1016/j.autcon.2009.09.004 · Cited by 97
Ding, L., Zhou, Y., Luo, H., & Wu, X. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.05.013 · Cited by 93
CONSTRUCTION 3D BIM-BASED KNOWLEDGE MANAGEMENT SYSTEM: A CASE STUDY
Lin, Y. (2014) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2013.801887 · Cited by 83
TECHNOLOGY DEVELOPMENT IN CONSTRUCTION: A CONTINUUM FROM DISTANT PAST INTO THE FUTURE
Skibniewski, M. J., & Zavadskas, E. K. (2013) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2012.756060 · Cited by 69
Building Information Modeling: Systematic Course Development for Undergraduate Construction Students
Ahn, Y., Cho, C.-S., & Lee, N. (2013) · Journal of Professional Issues in Engineering Education and Practice · doi:10.1061/(asce)ei.1943-5541.0000164 · Cited by 64
Ren, Y., Skibniewski, M. J., & Jiang, S. (2012) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2012.719835 · Cited by 50
Using the MD CAD model to develop the time–cost integrated schedule for construction projects
Feng, C.-W., Chen, Y.-J., & Huang, J.-R. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.12.009 · Cited by 50
Wong, A. K. D., & Zhang, R. (2013) · Construction Innovation · doi:10.1108/14714171311296048 · Cited by 39
Cited by
BIM compatibility and its differentiation with interoperability challenges as an innovation factor
Shirowzhan, S., Sepasgozar, S. M. E., Edwards, D. J., Li, H., & Wang, C. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103086 · Cited by 164
Qin, X., Shi, Y., Lyu, K., & Mo, Y. (2020) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/jcem.2020.12176 · Cited by 154
Metadata
- Authors
- Ding, Z., Zuo, J., Wu, J., & Wang, J.
- Venue
- Engineering, Construction and Architectural Management
- Publisher
- Emerald
- Published
- 2015-11-16
- Volume
- 22
- Issue
- 6
- Pages
- 732-748
- ISSN
- 0969-9988 (ISSN-L)
- OpenAlex
- W2176249530
- Cited by
- 196
- References
- 51
- FWCI
- 17.13
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.