Project risk assessment using the analytic hierarchy process
Abstract
Construction projects often fail to achieve their time, budget, and quality goals. This is frequently due to the failure of the contractor to analyze and assess all risk factors. The analytic hierarchy process (AHP) is an approach that can be used to analyze and assess project risks during the bidding stage of a construction project and to overcome the limitations of the approaches currently used by contractors. The AHP provides a flexible, easily understood way to assist the decision-maker in formulating a problem in a logical and rational manner. A review of the AHP and a description of its application in the assessment of the riskiness of constructing the Jamuna multipurpose bridge in Bangladesh are included.>
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The magical number seven, plus or minus two: Some limits on our capacity for processing information.
Miller, G. A. (1956) · Psychological Review · doi:10.1037/h0043158 · Cited by 17,812
The magical number seven, plus or minus two: Some limits on our capacity for processing information.
Miller, G. A. (1994) · Psychological Review · doi:10.1037/0033-295x.101.2.343 · Cited by 17,161
The Analytic Hierarchy Process
SAATY, T. L., & KEARNS, K. P. (1985) · Analytical Planning · doi:10.1016/b978-0-08-032599-6.50008-8 · Cited by 15,357
The Analytic Hierarchy Process—A Survey of the Method and its Applications
Zahedi, F. (1986) · Interfaces · doi:10.1287/inte.16.4.96 · Cited by 1,329
The Analytic Hierarchy Process: Structuring, Measurement, and Synthesis
Wang, J., Chakraborty, C., & Ouyang, H. (2011) · Encyclopedia of Decision Making and Decision Support Technologies · doi:10.4018/9781599048437.ch003 · Cited by 1,328
Priority setting in complex problems
Saaty, T. L. (1983) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1983.6448606 · Cited by 274
Priority Setting in Complex Problems
Saaty, T. L. (1983) · Lecture notes in economics and mathematical systems · doi:10.1007/978-3-642-46473-7_32 · Cited by 248
Construction risk assessment by linguistics
Kangari, R., & Riggs, L. S. (1989) · IEEE Transactions on Engineering Management · doi:10.1109/17.18829 · Cited by 246
Liberatore, M. J. (1987) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1987.6498854 · Cited by 242
Cited by
Risk analysis and management in construction
Akintoye, A. S., & MacLeod, M. J. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00035-x · Cited by 755
A review of applications of Analytic Hierarchy Process in operations management
Subramanian, N., & Ramanathan, R. (2012) · International Journal of Production Economics · doi:10.1016/j.ijpe.2012.03.036 · Cited by 648
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Zheng, G., Zhu, N., Tian, Z., Chen, Y., & Sun, B. (2012) · Safety Science · doi:10.1016/j.ssci.2011.08.042 · Cited by 381
Identifying and assessing critical risk factors for BIM projects: Empirical study
Chien, K.-F., Wu, Z.-H., & Huang, S.-C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.012 · Cited by 317
Metadata
- Authors
- Mustafa, M. A., & Al-Bahar, J. F.
- Venue
- IEEE Transactions on Engineering Management
- Published
- 1991
- Volume
- 38
- Issue
- 1
- Pages
- 46-52
- ISSN
- 0018-9391 (ISSN-L)
- OpenAlex
- W2142518420
- Cited by
- 331
- References
- 9
- FWCI
- 1.31
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Project risk assessment using the analytic hierarchy process. https://app.cochat.ai/papers/10.1109/17.65759
- The paper
- Mustafa, M. A., & Al-Bahar, J. F. (1991). Project risk assessment using the analytic hierarchy process. IEEE Transactions on Engineering Management. https://doi.org/10.1109/17.65759
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.