The DOI matches its Crossref record; 7 of the 7 references it cites were found in a registry or an index.
Experiences with mixed integer linear programming based approaches on short-term hydro scheduling
Abstract
This paper describes experiences with mixed integer linear programming (MILP) based approaches on the short-term hydro scheduling (STHS) function. The STHS is used to determine the optimal or near-optimal schedules for the dispatchable hydro units in a hydro-dominant system for a user-definable study period at each time step while respecting all system and hydraulic constraints. The problem can be modeled in detail for a hydro system that contains both conventional and pumped-storage units. Discrete and dynamic constraints such as unit startup/shutdown and minimum-up/minimum-down time limits are also included in the model for hydro unit commitment (HUC). The STHS problem is solved with a state-of-the-art package which includes an algebraic modeling language and a MILP solver. The usefulness of the proposed solution algorithm is illustrated by testing the problem with actual hydraulic system data. Numerical experiences show that the solution technique is computationally efficient, simple, and suitable for decision support of short-term hydro operations planning. In addition, the proposed approaches can be easily extended for scheduling applications in a deregulated environment.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Power Generation, Operation, and Control
Wood, A. J., & Wollenberg, B. F. (1984) · Cited by 8,303
AMPL : a modeling language for mathematical programming
Fourer, R., & Kernighan, B. W. (1993) · Cited by 1,860
A Modeling Language for Mathematical Programming
Fourer, R., Gay, D. M., & Kernighan, B. W. (1990) · Management Science · doi:10.1287/mnsc.36.5.519 · Cited by 660
Generation scheduling in a deregulated system. The Norwegian case
Fosso, O. B., Gjelsvik, A., Haugstad, A., Mo, B., & Wangensteen, I. (1999) · IEEE Transactions on Power Systems · doi:10.1109/59.744487 · Cited by 300
Nilsson, O., & Sjelvgren, D. (1997) · IEEE Transactions on Power Systems · doi:10.1109/59.574921 · Cited by 188
Habibollahzadeh, H., & Bubenko, J. A. (1986) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.1986.4334842 · Cited by 177
Optimal Operations Planning in a Large Hydro-Thermal Power System
Sjelvgren, D., Andersson, S., Andersson, T., Nyberg, U., & Dillon, T. S. (1983) · IEEE Transactions on Power Apparatus and Systems · doi:10.1109/tpas.1983.317727 · Cited by 59
Cited by
Particle Swarm Optimization: Basic Concepts, Variants and Applications in Power Systems
del Valle, Y., Venayagamoorthy, G. K., Mohagheghi, S., Hernandez, J.-C., & Harley, R. G. (2008) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2007.896686 · Cited by 2,277
Trends and challenges in the operation of pumped-storage hydropower plants
Pérez-Díaz, J. I., Chazarra, M., García-González, J., Cavazzini, G., & Stoppato, A. (2015) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2015.01.029 · Cited by 328
Self-scheduling of a hydro producer in a pool-based electricity market
Conejo, A. J., Arroyo, J. M., Contreras, J., & Villamor, F. A. (2002) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2002.804951 · Cited by 326
Metadata
- Authors
- Chang, G. W., Aganagic, M., Waight, J. G., Medina, J., Burton, T., Reeves, S., & Christoforidis, M.
- Venue
- IEEE Transactions on Power Systems
- Published
- 2001
- Volume
- 16
- Issue
- 4
- Pages
- 743-749
- ISSN
- 0885-8950 (ISSN-L)
- OpenAlex
- W4244258451
- Cited by
- 255
- References
- 7
- FWCI
- 2.93
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Experiences with mixed integer linear programming based approaches on short-term hydro scheduling. https://app.cochat.ai/papers/10.1109/59.962421
- The paper
- Chang, G. W., Aganagic, M., Waight, J. G., Medina, J., Burton, T., Reeves, S., & Christoforidis, M. (2001). Experiences with mixed integer linear programming based approaches on short-term hydro scheduling. IEEE Transactions on Power Systems. https://doi.org/10.1109/59.962421
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.