Risk assessment of power systems SCADA

Hamoud, G., Chen, R.-L., Bradley, I.·2004·2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)

Abstract

SCADA systems are widely used in power systems for monitoring, operation and control purposes. Failure of the SCADA system can result in severe consequences such as customer load losses and equipment damages, etc. Evaluating these consequences at planning stage can help select the appropriate level of reliability of the SCADA systems. This paper presents a practical method for quantifying the risk associated with the failure of the SCADA systems utilized in power systems. The method first identifies the various components of risk and then evaluates each by considering overlap of the two events, failure of control by SCADA and failure of automatic operation of the power system network. The SCADA risk is calculated and expressed in terms of dollars on a station by station basis. The calculated risk can be used to rank a group of stations, to identify the importance of stations and to establish the reliability requirements for the SCADA system that has the lowest capital cost. The proposed method is applied to the Hydro One Transmission Networks System with its historical operating performance data.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1109/pes.2003.1270402

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

No references could be resolved yet.

Research works printed but not linked: 6

  1. 1999, Transmission Control Room and SCADA Standard, Hydro One Internal Report
  2. 0, Recommended Practice for Network Communication in Electric Power Substations, IEEE Project P1615
  3. 2002, The Automation of New and Existing Substations: Why and How, Report No Draft Final Report
  4. 10.1109/59.387913 · DOI
  5. 2001, Risk Assessment Associated With Failure of SCADA System, Hydro One Internal Report
  6. 10.1007/978-1-4615-7728-7 · DOI

Cited by

Sorted by citations

Metadata

Authors
Hamoud, G., Chen, R.-L., & Bradley, I.
Affiliations
Hydro One (Canada) (CA)
Venue
2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)
Publisher
IEEE
Published
2004-04-23
Pages
758-764
ISSN
1932-5517 (ISSN-L)
OpenAlex
W1537246775
Cited by
20
References
0
Citations by year
2023: 1 · 2021: 1 · 2019: 1 · 2016: 1 · 2015: 1 · 2014: 1 · 2013: 3 · 2012: 1
FWCI
2.70
Type
conference paper
Language
en
Open access
closed
Locations
IEEE Power Engineering Society General Meeting (publishedVersion)
Topics
  • Physical Sciences › Engineering › Safety, Risk, Reliability and Quality › Power System Reliability and Maintenance
  • Physical Sciences › Engineering › Control and Systems Engineering › Smart Grid Security and Resilience
  • Physical Sciences › Engineering › Electrical and Electronic Engineering › Power System Optimization and Stability
Keywords
SCADA systems, risk assessment, power system reliability, automatic generation control, load loss, reliability requirements

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review