Heuristic Scheduling of Batch Production Processes Based on Petri Nets and Iterated Greedy Algorithms
The DOI matches its Crossref record; 24 of the 24 references it cites were found in a registry or an index.
Abstract
Wire rod and bar rolling is an important batch production process in steel production systems. A scheduling problem originated from this process is studied in this work by considering the constraints on sequence-dependent family setup time and release time. For each serial batch to be scheduled, it contains several jobs and the number of late jobs within it varies with its start time. First, we model a rolling process using a Petri net (PN), where a so-called rolling transition describes a rolling operation of a batch. The objective of the concerned problem is to determine a firing sequence of all rolling transitions such that the total number of late jobs is minimal. Next, a mixed-integer linear program is formulated based on the PN model. Due to the NP-hardness of the concerned problem, iterated greedy algorithm (IGA)-based methods by using different neighborhood structures and integrating a variable neighborhood descent method are developed to obtain its near-optimal solutions. To test the accuracy, speed, and stability of the proposed algorithms, we compare their solutions of different-size instances with those of CPLEX (a commercial software) and four heuristic peers. The results indicate that the proposed algorithms outperform their peers and have great potential to be applied to industrial production process scheduling.Note to Practitioners—This work deals with a scheduling problem of a batch production process, i.e., wire rod and bar rolling, which is modeled by a Petri net (PN). Due to the NP-hardness of the concerned problem, four iterated greedy algorithm-based methods are developed to solve it. The proposed methods are validated and tested by comparing their solutions with those of four heuristic peers and the exact ones (when available via CPLEX). Extensive experimental results show that they can fast solve one-week-scale instances with better performance than their peers’, thereby proving the readiness to put them in industrial use. When solving a one-month-scale instance, the proposed methods show much better performance than others.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Optimization by Simulated Annealing
Kirkpatrick, S., Gelatt, C. D., & Vecchi, M. P. (1983) · Science · doi:10.1126/science.220.4598.671 · Cited by 45,134
Reducibility among Combinatorial Problems
Karp, R. M. (1972) · Complexity of Computer Computations · doi:10.1007/978-1-4684-2001-2_9 · Cited by 11,511
Mladenović, N., & Hansen, P. (1997) · Computers & Operations Research · doi:10.1016/s0305-0548(97)00031-2 · Cited by 4,254
Simulated annealing for permutation flow-shop scheduling
Osman, I., & Potts, C. (1989) · Omega · doi:10.1016/0305-0483(89)90059-5 · Cited by 614
Flexible Job-Shop Rescheduling for New Job Insertion by Using Discrete Jaya Algorithm
Gao, K., Yang, F., Zhou, M., Pan, Q., & Suganthan, P. N. (2019) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2018.2817240 · Cited by 302
Self-citationPareto-Optimization for Scheduling of Crude Oil Operations in Refinery via Genetic Algorithm
Hou, Y., Wu, N., Zhou, M., & Li, Z. (2017) · IEEE Transactions on Systems, Man, and Cybernetics: Systems · doi:10.1109/tsmc.2015.2507161 · Cited by 246
Self-citationTTSA: An Effective Scheduling Approach for Delay Bounded Tasks in Hybrid Clouds
Yuan, H., Bi, J., Tan, W., Zhou, M., Li, B. H., & Li, J. (2017) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2016.2574766 · Cited by 207
Self-citationLuo, X., Zhou, M., Li, S., & Shang, M. (2018) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2017.2766528 · Cited by 200
Self-citationFu, Y., Zhou, M., Guo, X., & Qi, L. (2020) · IEEE Transactions on Systems, Man, and Cybernetics: Systems · doi:10.1109/tsmc.2019.2907575 · Cited by 183
Self-citationDecomposition Method for New Single-Machine Scheduling Problems From Steel Production Systems
Zhao, Z., Liu, S., Zhou, M., Guo, X., & Qi, L. (2019) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2019.2953669 · Cited by 154
Self-citation
Cited by
Iterated Greedy Algorithms for Flow-Shop Scheduling Problems: A Tutorial
Zhao, Z., Zhou, M., & Liu, S. (2022) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2021.3062994 · Cited by 230
Self-citationZhao, Z., Liu, S., Zhou, M., & Abusorrah, A. (2021) · IEEE/CAA Journal of Automatica Sinica · doi:10.1109/jas.2020.1003539 · Cited by 203
“However, by using the first stage of a two-stage decomposition method proposed in [3], the number of late jobs within a batch (denoted by ) can be derived from its start time (denoted by ), which only depends on a batch sequence.”
BackgroundMethodInfluentialSelf-citation
Metadata
- Authors
- Zhao, Z., Liu, S., Zhou, M., You, D., & Guo, X.
- Venue
- IEEE Transactions on Automation Science and Engineering
- Published
- 2022-01
- Volume
- 19
- Issue
- 1
- Pages
- 251-261
- ISSN
- 1545-5955 (ISSN-L)
- 1558-3783
- OpenAlex
- W3094288436
- Cited by
- 190
- References
- 24
- FWCI
- 16.14
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.