Overview of IEC 61850 and Benefits
The DOI matches its Crossref record.
Abstract
Legacy substation automation protocols and architectures typically provided basic functionality for power system automation and were designed to accommodate the technical limitations of the networking technology available for implementation. There has recently been a vast improvement in networking technology that has changed dramatically what is now feasible for power system automation in the substation. Technologies such as switched Ethernet, TCP/IP, high-speed wide area networks, and high-performance low-cost computers are providing capabilities that could barely be imagined when most legacy substation automation protocols were designed. In order to take advantage of modern technology to deliver additional new benefits to users of substation automation, the International Electrotechnical Commission (IEC) has developed and released a new global standard for substation automation: IEC 61850. The paper provides a basic technical overview of IEC 61850 and discusses the benefits of each major aspect of the standard. The concept of a virtual model comprising both physical and logical device models that includes a set of standardized communications services are described along with explanations of how these standardized models, object naming conventions, and communication services bring significant benefits to the substation automation user. New services to support self-describing devices and object-orient peer-to-peer data exchange are explained with an emphasis on how these services can be applied to reduce costs for substation automation. The substation configuration language (SCL) of IEC 61850 is presented with information on how the standardization of substation configuration will impact the future of substation automation. The paper concludes with a brief introduction to the UCA International Users Group as a forum where users and suppliers cooperate in improving substation automation with testing, education, and demonstrations of IEC 61850 and other IEC standards technology
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Power system reliability evaluation with SCADA cybersecurity considerations
Zhang, Y., Wang, L., Xiang, Y., & Ten, C.-W. (2015) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2015.2396994 · Cited by 239
“0 and International Electrotechnical Commission (IEC) 61850 [4].”
BackgroundExploiting the GOOSE protocol: A practical attack on cyber-infrastructure
Hoyos, J., Dehus, M., & Brown, T. X. (2012) · 2012 IEEE Globecom Workshops · doi:10.1109/glocomw.2012.6477809 · Cited by 137
IEC 61850: Technology standards and cyber-threats
Youssef, T. A., El Hariri, M., Bugay, N., & Mohammed, O. A. (2016) · 2016 IEEE 16th International Conference on Environment and Electrical Engineering (EEEIC) · doi:10.1109/eeeic.2016.7555647 · Cited by 40
Simulation of power system substation communications architecture based on IEC 61850 standard
Golshani, M., Taylor, G. A., & Pisica, I. (2014) · 2014 49th International Universities Power Engineering Conference (UPEC) · doi:10.1109/upec.2014.6934745 · Cited by 21
“any middle layers and increase the performance [16].”
Background
Metadata
- Authors
- Mackiewicz, R. E.
- Venue
- 2005/2006 PES TD
- Publisher
- IEEE
- Published
- 2006-09-08
- Pages
- 376-383
- OpenAlex
- W1968263736
- Cited by
- 235
- References
- 0
- FWCI
- 8.49
- Type
- conference paper
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.