Assessing and Moving on From the Dominant Project Management Discourse in the Light of Project Overruns
Abstract
There has been much prescriptive work in project management, exemplified in various "Bodies of Knowledge". However, experience shows some projects overspending considerably. Recently, systemic modeling research into the behavior of large projects explains project oversponds by "systemic" effects and the (sometimes counterintuitive) effect of management actions. However, while this work is becoming more widely known, embedding the lessons in project-management practice is not straightforward. The current prescriptive dominant discourse of project management contains implicit underlying assumptions with which the systemic modeling work clashes, indeed showing how conventional methods can exacerbate rather than alleviate project problems. Exploration of this modeling suggests that for projects that are complex, uncertain, and time-limited, conventional methods might be inappropriate, and aspects of newer methodologies in which the project "emerges" rather than being fully preplanned might be more appropriate. Some of the current literature on project-classification schemes also suggests similar parameters, without the rationale that the systemic modeling provides, thus providing useful backup to this analysis. The eventual aim of this line of work is to enable project managers to choose effective ways to manage projects based on understanding and model-based theory.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Culture's Consequences: Comparing Values, Behaviors, Institutions, and Organizations across Nations
Bhagat, R. S., & Hofstede, G. (2002) · The Academy of Management Review · doi:10.2307/4134391 · Cited by 21,664
Gender and leadership style: A meta-analysis.
Eagly, A. H., & Johnson, B. T. (1990) · Psychological Bulletin · doi:10.1037//0033-2909.108.2.233 · Cited by 2,749
Agile Software Development with SCRUM
Schwaber, K., & Beedle, M. (2001) · Cited by 2,656
Modeling Managerial Behavior: Misperceptions of Feedback in a Dynamic Decision Making Experiment
Sterman, J. D. (1989) · Management Science · doi:10.1287/mnsc.35.3.321 · Cited by 2,500
Megaprojects and Risk: An Anatomy of Ambition
Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003) · Cambridge University Press eBooks · doi:10.1017/cbo9781107050891 · Cited by 2,415
General and Industrial Management
Carter, N. M., & Fayol, H. (1986) · The Academy of Management Review · doi:10.2307/258475 · Cited by 2,241
The Case for Qualitative Research
Morgan, G., & Smircich, L. (1980) · The Academy of Management Review · doi:10.2307/257453 · Cited by 1,850
Organizational Culture and Marketing: Defining the Research Agenda
Deshpande, R., & Webster, F. E. (1989) · Journal of Marketing · doi:10.1177/002224298905300102 · Cited by 1,803
Measuring and Assessing Organizations.
Price, J. L., de Ven, A. H. V., & Ferry, D. L. (1981) · Administrative Science Quarterly · doi:10.2307/2392488 · Cited by 1,648
(1998) · Springer eBooks · doi:10.1007/978-1-4615-5529-2 · Cited by 1,235
THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL
Ballard, H. G. (2000) · University of Birmingham Institutional Research Archive (University of Birmingham) · Cited by 1,229
The concept of project complexity—a review
Baccarini, D. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00093-3 · Cited by 1,192
Underestimating Costs in Public Works Projects:Error or Lie?
Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002) · Journal of the American Planning Association · doi:10.1080/01944360208976273 · Cited by 1,046
The Sciences of the Artificial
Simon, H. A. (2019) · The MIT Press eBooks · doi:10.7551/mitpress/12107.001.0001 · Cited by 982
On Uncertainty, Ambiguity, and Complexity in Project Management
Pich, M. T., Loch, C. H., & Meyer, A. D. (2002) · Management Science · doi:10.1287/mnsc.48.8.1008.163 · Cited by 942
Agile Software Development Ecosystems
Highsmith, J. (2002) · International Linear Collider · Cited by 874
A comparative study of causes of time overruns in Hong Kong construction projects
Chan, D. W., & Kumaraswamy, M. M. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00039-7 · Cited by 831
One Size Does Not Fit All Projects: Exploring Classical Contingency Domains
Shenhar, A. J. (2001) · Management Science · doi:10.1287/mnsc.47.3.394.9772 · Cited by 821
Inquiring into the temporary organization: New directions for project management research
Packendorff, J. (1995) · Scandinavian Journal of Management · doi:10.1016/0956-5221(95)00018-q · Cited by 753
The Anatomy of Major Projects: A Study of the Reality of Project Management
Morris, P. W. G., & Hough, G. H. (1988) · Medical Entomology and Zoology · Cited by 696
The need for new paradigms for complex projects
Williams, T. M. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00047-7 · Cited by 674
Self-citationMorris, P. W. G. (1994) · doi:10.1680/mop.16934 · Cited by 645
Tatikonda, M. V., & Rosenthal, S. R. (2000) · IEEE Transactions on Engineering Management · doi:10.1109/17.820727 · Cited by 634
Toward a typological theory of project management
Shenhar, A. J., & Dvir, D. (1996) · Research Policy · doi:10.1016/0048-7333(95)00877-2 · Cited by 614
Turner, J. R., & Cochrane, R. A. (1993) · International Journal of Project Management · doi:10.1016/0263-7863(93)90017-h · Cited by 529
Hamilton-Jessop, W. (2021) · Sage eBooks · doi:10.4135/9781071861073 · Cited by 526
Understanding Management Research
Johnson, P., & Duberley, J. (2000) · SAGE Publications Ltd eBooks · doi:10.4135/9780857020185 · Cited by 513
Managing project uncertainty: from variation to chaos
De Meyer, A., Loch, C. H., & Pich, M. T. (2002) · IEEE Engineering Management Review · doi:10.1109/emr.2002.1032403 · Cited by 464
Managing Successful Projects with PRINCE2
Axelos (2017) · CERN Document Server (European Organization for Nuclear Research) · Cited by 451
Earned value in project management
(2003) · Work Study · doi:10.1108/ws.2003.07952gaf.006 · Cited by 418
Systems Analysis and Project Management.
Schmidt, R. N., Cleland, D. I., & King, W. R. (1969) · Administrative Science Quarterly · doi:10.2307/2391604 · Cited by 411
PRODUCT DEVELOPMENT TENSIONS: EXPLORING CONTRASTING STYLES OF PROJECT MANAGEMENT.
Lewis, M. W., Welsh, M. A., Dehler, G. E., & Green, S. G. (2002) · Academy of Management Journal · doi:10.2307/3069380 · Cited by 409
Project Work: The Legacy of Bureaucratic Control in the Post-Bureaucratic Organization
Hodgson, D. E. (2004) · Organization · doi:10.1177/1350508404039659 · Cited by 355
DISCIPLINING THE PROFESSIONAL: THE CASE OF PROJECT MANAGEMENT*
HODGSON, D. (2002) · Journal of Management Studies · doi:10.1111/1467-6486.00312 · Cited by 335
Managing Product Development Projects: On the Significance of Fountains and Deadlines
Lindkvist, L., Soderlund, J., & Tell, F. (1998) · Organization Studies · doi:10.1177/017084069801900602 · Cited by 311
Partridge, B. E. (1974) · Journal of the Operational Research Society · doi:10.1057/jors.1974.92 · Cited by 291
In search of relevance: Project management in drifting environments
Kreiner, K. (1995) · Scandinavian Journal of Management · doi:10.1016/0956-5221(95)00029-u · Cited by 266
CRITICAL SUCCESS FACTORS ACROSS THE PROJECT LIFE CYCLE
Al-Fahdawi, M. S., Rawi, O. S. A., & Hassan, A. S. (2025) · Journal of Al-Azhar University Engineering Sector · doi:10.21608/auej.2025.336575.1735 · Cited by 259
Naval Ship Production: A Claim Settled and a Framework Built
Cooper, K. G. (1980) · INFORMS Journal on Applied Analytics · doi:10.1287/inte.10.6.20 · Cited by 256
Beyond Project Management: New Perspectives on the temporary – permanent dilemma
Sahlin‐Andersson, K., & Söderholm, A. (2002) · Cited by 253
The Current State of Project Management Research: Trends, Interpretations, and Predictions
Kloppenborg, T. J., & Opfer, W. A. (2002) · Project Management Journal · doi:10.1177/875697280203300203 · Cited by 248
Approaches to project management in Africa: implications for international development projects
Muriithi, N., & Crawford, L. H. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00048-0 · Cited by 237
The expertise of the change agent: Public performance and backstage activity
Buchanan, D., & Boddy, D. (1992) · Medical Entomology and Zoology · Cited by 216
Projects as Arenas for Renewal and Learning Processes
Lundin, R. A., & Midler, C. (1998) · Springer eBooks · doi:10.1007/978-1-4615-5691-6 · Cited by 215
A classified bibliography of recent research relating to project risk management
Williams, T. (1995) · European Journal of Operational Research · doi:10.1016/0377-2217(93)e0363-3 · Cited by 200
Self-citationAdvanced Project Management: A Structured Approach
Harrison, F., & Lock, D. (2017) · Routledge eBooks · doi:10.4324/9781315263328 · Cited by 179
Modeling for Litigation: Mixing Qualitative and Quantitative Approaches
Ackermann, F., Eden, C., & Williams, T. (1997) · INFORMS Journal on Applied Analytics · doi:10.1287/inte.27.2.48 · Cited by 165
Self-citationLearning to learn, from past to future
Cooper, K. G., Lyneis, J. M., & Bryant, B. J. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00071-0 · Cited by 134
Science, objective knowledge and the theory of project management
Morris, P. W. G. (2002) · Proceedings of the Institution of Civil Engineers - Civil Engineering · doi:10.1680/cien.150.2.82.38547 · Cited by 133
Planning or organizing: The implications of theories of activity for management of operations
Johnston, R. B., & Brennan, M. (1996) · Omega · doi:10.1016/0305-0483(96)00016-3 · Cited by 98
How Projects Differ, And What to Do About It
Shenhar, A. J., & Dvir, D. (2004) · doi:10.1002/9780470172391.ch50 · Cited by 95
From project ontologies to communities of virtue
Linehan, C., & Kavanagh, D. (2006) · doi:10.1007/978-0-230-20929-9_3 · Cited by 88
On the development of project management research: schools of thought and critique
Söderlund, J. (2002) · Cited by 78
Vicious circles of parallelism
Williams, T., Eden, C., Ackermann, F., & Tait, A. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00034-n · Cited by 69
Self-citationCulture and Organization: The Case of Transmanche‐Link
Winch, G., Millar, C., & Clifton, N. (1997) · British Journal of Management · doi:10.1111/1467-8551.00063 · Cited by 40
Dubinskas, F. A. (1994) · Journal of Management Inquiry · doi:10.1177/105649269434009 · Cited by 36
Understanding Your Project Organization's Character
Andersen, E. S. (2003) · Project Management Journal · doi:10.1177/875697280303400402 · Cited by 35
Research works printed but not linked: 64
- 2000, Project Management Inst.
- Turner, 1993, McGraw-Hill
- Dixon, 2000, Assoc. Project Management
- Stevens, 2002, Project Management Pathways
- Johnson, 2002, The Pathways Concepts and BOK, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
- Holton, 2002, Project Management, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
- Cleland, 1983, Van Nostrand
- Lundin, 2000, Kluwer
- Lundin, 1998, Kluwer
- Sahlin-Andersson, 2002, Copenhagen Bus. School Press
- 10.1111/1467-6486.00198 · doi:10.1111/1467-6486.00198
- Harrison, 1972, How to describe your organization, Harv. Bus. Rev., 5, 119
- 10.1111/j.1467-8551.1991.tb00021.x · doi:10.1111/j.1467-8551.1991.tb00021.x
- 1986, National Audit Office, HMSO, London, U.K.
- 10.1002/1520-6750(198806)35:3<367::AID-NAV3220350306>3.0.CO;2-D · doi:10.1002/1520-6750(198806)35:3<367::aid-nav3220350306>3.0.co;2-d
- Koskela, The underlying theory of project management is obsolete, 293
- 10.1177/875697280003100403 · doi:10.1177/875697280003100403
- Williams, 2003, Structuring a disruption and delay claim, Eur. J. Opl. Res., 148, 192, 10.1016/S0377-2217(02)00372-7 · doi:10.1016/s0377-2217(02)00372-7
- 10.1002/(SICI)1099-1727(199622)12:2<121::AID-SDR99>3.0.CO;2-X · doi:10.1002/(sici)1099-1727(199622)12:2<121::aid-sdr99>3.0.co;2-x
- 10.1061/(ASCE)0733-9364(1987)113:3(488) · doi:10.1061/(asce)0733-9364(1987)113:3(488
- Cooper, 1993, The rework cycle: Benchmarks for the project manager, Proj. Manage. J., 20, 17
- 10.1002/sdr.213 · doi:10.1002/sdr.213
- Eden, 2004, The amoebic growth of project costs, Proj. Manage. J.
- Eden, 2000, On the nature of disruption and delay (D&D) in major projects, J. Opl. Res. Soc., 51, 291, 10.1057/palgrave.jors.2600919 · doi:10.1057/palgrave.jors.2600919
- Stevens, 2002, Project Context, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
- Turner, 1999, Editorial. project management: A profession based on knowledge or faith?, Int. J. Proj. Mgmt., 17, 329
- 1999, Project Manage. Inst.
- 10.1016/0956-5221(95)00033-R · doi:10.1016/0956-5221(95)00033-r
- Bredillet, Beyond the positivist mirror: Toward a project management ‘gnosis’, 70
- 10.1016/S0925-5273(97)00091-1 · doi:10.1016/s0925-5273(97)00091-1
- Koskela, The theory of project management: Explanation to novel methods
- Remington, Illusions of control: Philosophical foundations for project management, 563
- Hampden-Turner, 1993, The Seven Cultures of Capitalism
- Stefanou, Research program overview
- Fleming, 2000, Earned Value Project Management
- Pritchard, 2001, Risk Management: Concepts and Guidance
- 10.1680/cien.2002.150.2.82 · doi:10.1680/cien.2002.150.2.82
- 10.1016/S0263-7863(01)00050-3 · doi:10.1016/s0263-7863(01)00050-3
- Malgrati, Rethinking the new project management framework: New epistemology, new insights, 371
- Thomas, Living in the white spaces between the lines: Exploring the use of gendered logic systems in project managers’ discourse, 620
- 10.1037/0033-2909.108.2.233 · doi:10.1037/0033-2909.108.2.233 · Paper page
- Bredillet, Understanding the very nature of project management: A praxiological approach
- Obeng, 1996, Financial Times Manage.
- Milosevic, 2003, Project Management Toolbox: Tools and Techniques for the Practicing Project Manager
- Archer, Project management in network organizations
- Crawford, Project categorization systems and their use in organizations: An empirical study
- Davey, 2002, Risk Management, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
- Williams, 1997, Project risk: Systemicity, cause mapping and a scenario approach, 343
- Thompson, 1967, Organizations in Action
- Ulri, 2000, Le management de projets et ses evolution en Amerique du Nord, Revue Francaise de Gestion, 129, 21
- Lock, 2002, Change Control, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
- Engwall, 2002, The futile dream of the perfect goal, 261
- 10.1016/0024-6301(79)90070-0 · doi:10.1016/0024-6301(79)90070-0
- Ashton, 1990, Shop floor control in a system job shop: Definitely not MRP, Prod. Inv. Manage. J., 31, 27
- Brown, A cure that harms? The enactment of project management on IS projects
- Molin, Divided loyalties in project management
- Udo, Will agile development change the way we manage software projects? AGILE from a PMBOK guide perspective
- Charette, 2003, Challenging the fundamental notions of software development, 4
- 10.1016/S0263-7863(98)00005-2 · doi:10.1016/s0263-7863(98)00005-2
- Andersen, 1995, Goal Directed Project Management
- Thomas, On learning and control—Competing paradigms or co-existing requirements for managing projects in ambiguous situations?
- Besner, An empirical investigation of project management practice: In reality, which tools do practitioners use?
- Pinto, 1998, The elements of project success, 13
- Shenhar, Improving PM: Linking success criteria to project type
Cited by
Rethinking Project Management: Researching the actuality of projects
Cicmil, S., Williams, T., Thomas, J., & Hodgson, D. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.08.006 · Cited by 678
Self-citationNow, let's make it really complex (complicated): A systematic review of the complexities of projects
Geraldi, J., Maylor, H., & Williams, T. (2011) · International Journal of Operations & Production Management · doi:10.1108/01443571111165848 · Cited by 559
Self-citationBosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.07.008 · Cited by 471
Preparing project managers to deal with complexity – Advanced project management education
Thomas, J., & Mengel, T. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.01.001 · Cited by 471
Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation
Söderlund, J. (2011) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2010.00290.x · Cited by 352
Metadata
- Authors
- Williams, T.
- Venue
- IEEE Transactions on Engineering Management
- Published
- 2005-11
- Volume
- 52
- Issue
- 4
- Pages
- 497-508
- ISSN
- 0018-9391 (ISSN-L)
- OpenAlex
- W2167113207
- Cited by
- 456
- References
- 57
- FWCI
- 20.40
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.