Knowledge-Based Reinforcement Learning and Estimation of Distribution Algorithm for Flexible Job Shop Scheduling Problem
The DOI matches its Crossref record; 42 of the 42 references it cites were found in a registry or an index.
Abstract
Inthis study, a flexible job shop scheduling problem with time-of-use electricity price constraint is considered. The problem includes machine processing speed, setup time, idle time, and the transportation time between machines. Both maximum completion time and total electricity price are optimized simultaneously. A hybrid multi-objective optimization algorithm of estimation of distribution algorithm and deep Q-network is proposed to solve this. The processing sequence, machine assignment, and processing speed assignment are all described using a three-dimensional solution representation. Two knowledge-based initialization strategies are designed for better performance. In the estimation of distribution algorithm component, three probability matrices corresponding to solution representation are provided. In the deep Q-network component, 34 state features are selected to describe the scheduling situation, while nine knowledge-based actions are defined to refine the scheduling solution, and the reward based on the two objectives is designed. As the knowledge for initialization and optimization strategies, five properties of the considered problem are proposed. The proposed mixed integer linear programming model of the problem is validated by exact solver CPLEX. The results of the numerical testing on wide-range scale instances show that the proposed hybrid algorithm is efficient and effective at solving the integrated flexible job shop scheduling problem.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A fast and elitist multiobjective genetic algorithm: NSGA-II
Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. (2002) · IEEE Transactions on Evolutionary Computation · doi:10.1109/4235.996017 · Cited by 50,053 · cited 1×
“Comparison of solutions is realized by non-dominated sorting and crowding distance sorting in [54].”
MethodHuman-level control through deep reinforcement learning
Mnih, V., Kavukcuoglu, K., Silver, D., Rusu, A. A., Veness, J., Bellemare, M. G., Graves, A., Riedmiller, M., Fidjeland, A. K., Ostrovski, G., et al. (2015) · Nature · doi:10.1038/nature14236 · Cited by 30,357
Dynamic scheduling for flexible job shop with new job insertions by deep reinforcement learning
Luo, S. (2020) · Applied Soft Computing · doi:10.1016/j.asoc.2020.106208 · Cited by 579 · cited 5×
“Similar to Ref [42], the training parameters are depicted in Table II.”
MethodInfluentialChen, R., Yang, B., Li, S., & Wang, S. (2020) · Computers & Industrial Engineering · doi:10.1016/j.cie.2020.106778 · Cited by 548 · cited 1×
“proposed a self-learning GA based on RL for FJSP, in which RL is used to adjust key parameters [39].”
MethodDeep Reinforcement Learning for Multiobjective Optimization
Li, K., Zhang, T., & Wang, R. (2021) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2020.2977661 · Cited by 424
Evolutionary Large-Scale Multi-Objective Optimization: A Survey
Tian, Y., Si, L., Zhang, X., Cheng, R., He, C., Tan, K. C., & Jin, Y. (2022) · ACM Computing Surveys · doi:10.1145/3470971 · Cited by 401 · cited 1×
“The above literature solved the FJSP with various constraints, but the performance of these EA approaches may deteriorate drastically for large-scale problems [22]–[27].”
BackgroundGong, M., Cai, Q., Chen, X., & Ma, L. (2014) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2013.2260862 · Cited by 394
Self-citationHybrid flow shop scheduling considering machine electricity consumption cost
Luo, H., Du, B., Huang, G. Q., Chen, H., & Li, X. (2013) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.01.028 · Cited by 381 · cited 4×
“Same as Ref [53], TOUEP is formulated as (4), where n is a positive integer and the unit of time t is the hour.”
BackgroundInfluentialDai, M., Tang, D., Giret, A., & Salido, M. Á. (2019) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2019.04.006 · Cited by 360 · cited 1×
“developed an enhanced genetic algorithm (GA) for solving an FJSP with transportation and machine idle constraints [8].”
Smart Manufacturing Scheduling With Edge Computing Using Multiclass Deep Q Network
Lin, C.-C., Deng, D.-J., Chih, Y.-L., & Chiu, H.-T. (2019) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2019.2908210 · Cited by 342 · cited 1×
“Lin et al. utilized a multi-class DQN to solve job shop scheduling problem, where the makespan was optimized [40].”
BackgroundOnline Vehicle Routing With Neural Combinatorial Optimization and Deep Reinforcement Learning
Yu, J. J. Q., Yu, W., & Gu, J. (2019) · IEEE Transactions on Intelligent Transportation Systems · doi:10.1109/tits.2019.2909109 · Cited by 338 · cited 1×
“Recently, deep reinforcement learning (DRL) techniques that combine RL with deep learning (DL) have been applied in solving combinatorial optimization problems (COPs) [29]–[34], demonstrating the strong learning abilities of DRL for COPs.”
BackgroundPark, J., Chun, J., Kim, S. H., Kim, Y., & Park, J. (2021) · International Journal of Production Research · doi:10.1080/00207543.2020.1870013 · Cited by 329 · cited 1×
“Park etal. combinedgraphneural network and RL to solve job shop scheduling problem, where proximal policy optimization based RL strategy were utilized to train the model [45].”
MethodA reinforcement learning approach to parameter estimation in dynamic job shop scheduling
Shahrabi, J., Adibi, M. A., & Mahootchi, M. (2017) · Computers & Industrial Engineering · doi:10.1016/j.cie.2017.05.026 · Cited by 313
Flexible Job-Shop Rescheduling for New Job Insertion by Using Discrete Jaya Algorithm
Gao, K., Yang, F., Zhou, M., Pan, Q., & Suganthan, P. N. (2019) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2018.2817240 · Cited by 302 · cited 1×
“discussed a flexible job shop rescheduling problem for new job insertion by using discrete Jaya algorithm [19].”
MethodSelf-citationA Knowledge-Based Cooperative Algorithm for Energy-Efficient Scheduling of Distributed Flow-Shop
Wang, J.-J., & Wang, L. (2020) · IEEE Transactions on Systems, Man, and Cybernetics: Systems · doi:10.1109/tsmc.2017.2788879 · Cited by 279 · cited 2×
“( The electricity cost of machine processing can be calculated as (2): Similar to Refs [51] and [52], a higher processing speed can shorten the processing time but requires more electricity consumption, which can be expressed in (3).”
Zhang, F., Mei, Y., Nguyen, S., & Zhang, M. (2021) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2020.3024849 · Cited by 264
A Review of Evolutionary Multimodal Multiobjective Optimization
Tanabe, R., & Ishibuchi, H. (2020) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2019.2909744 · Cited by 245
Hu, H., Jia, X., He, Q., Fu, S., & Liu, K. (2020) · Computers & Industrial Engineering · doi:10.1016/j.cie.2020.106749 · Cited by 241 · cited 1×
“proposed an adaptive DQN based automated guided vehicles real-time scheduling approach with mixed rules for flexible job floor to minimize the makespan and delay ratio [43].”
MethodExperienced Gray Wolf Optimization Through Reinforcement Learning and Neural Networks
Emary, E., Zawbaa, H. M., & Grosan, C. (2018) · IEEE Transactions on Neural Networks and Learning Systems · doi:10.1109/tnnls.2016.2634548 · Cited by 222 · cited 1×
“Emary etal. utilizedRLandneuralnetworktooptimizetheparameterof GWO [36].”
Pan, Z., Lei, D., & Wang, L. (2022) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2020.3026571 · Cited by 196 · cited 1×
“Similar to Refs [51] and [52], a higher processing speed can shorten the processing time but requires more electricity consumption, which can be expressed in (3).”
Lei, D., Li, M., & Wang, L. (2019) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2018.2796119 · Cited by 196 · cited 1×
“[55], and BEG-NSGA-II proposed by Deng et al.”
BackgroundA Reinforcement Learning Approach to Robust Scheduling of Semiconductor Manufacturing Facilities
Park, I.-B., Huh, J., Kim, J., & Park, J. (2020) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2019.2956762 · Cited by 188 · cited 1×
“Park et al. proposed a setup change scheduling method with RL to minimize the makespan for a producing multichip products scheduling problem [41].”
MethodKhooban, M. H., & Gheisarnejad, M. (2021) · IEEE Transactions on Emerging Topics in Computational Intelligence · doi:10.1109/tetci.2020.2964886 · Cited by 185 · cited 1×
“To address these issues, reinforcement learning (RL) is being considered to improve the optimization effectiveness for FJSP, which has become a powerful tool in intelligent system design [28].”
BackgroundZhao, F., Zhang, L., Cao, J., & Tang, J. (2021) · Computers & Industrial Engineering · doi:10.1016/j.cie.2020.107082 · Cited by 183 · cited 1×
“assembly no-idle flow shop scheduling problem [46].”
Jamrus, T., Chien, C., Gen, M., & Sethanan, K. (2017) · IEEE Transactions on Semiconductor Manufacturing · doi:10.1109/tsm.2017.2758380 · Cited by 176 · cited 1×
“3145706 including semi-conductor manufacturing [1], chemical engineering [2], and mobile assembling [3].”
BackgroundHe, Y., Xing, L., Chen, Y., Pedrycz, W., Wang, L., & Wu, G. (2022) · IEEE Transactions on Systems, Man, and Cybernetics: Systems · doi:10.1109/tsmc.2020.3020732 · Cited by 159 · cited 1×
“He et al. solved agile satellite scheduling problembyaDQNmodel[44].”
BackgroundLi, Y., Huang, W., Wu, R., & Guo, K. (2020) · Applied Soft Computing · doi:10.1016/j.asoc.2020.106544 · Cited by 157 · cited 1×
“investigated an FJSP with variable processing speed constraint by an improved artifical bee colony (ABC) algorithm to minimize the makespan, total carbon emission, and machine loading simultaneously [9].”
MethodCao, Z., Lin, C., & Zhou, M. (2019) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2019.2945717 · Cited by 142 · cited 1×
“significantly improved the effectiveness of a parameter control scheme based on RL and the ability to escape local optima [38].”
BackgroundDeep Reinforcement Learning for Combinatorial Optimization: Covering Salesman Problems
Li, K., Zhang, T., Wang, R., Wang, Y., Han, Y., & Wang, L. (2021) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2021.3103811 · Cited by 133
Xu, Z., Han, G., Liu, L., Martínez-García, M., & Wang, Z. (2021) · IEEE Transactions on Green Communications and Networking · doi:10.1109/tgcn.2021.3061789 · Cited by 119 · cited 1×
“designed an RL-based differential evolution algorithm to solve the multi-energy scheduling of an industrial integrated energy system [49].”
MethodZhang, F., Mei, Y., Nguyen, S., & Zhang, M. (2021) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2021.3050141 · Cited by 119
A Deep Reinforcement Learning Based Solution for Flexible Job Shop Scheduling Problem
Han, B. A., & Yang, J. (2021) · International Journal of Simulation Modelling · doi:10.2507/ijsimm20-2-co7 · Cited by 110 · cited 1×
“a recurrent neural network to model the decoder network [47].”
BackgroundJiang, E., & Wang, L. (2020) · Knowledge-Based Systems · doi:10.1016/j.knosys.2020.106177 · Cited by 108 · cited 8×
“Similar to Ref [42], the training parameters are depicted in Table II.”
BackgroundMethodResultInfluentialLi, J.-Q., Chen, X., Duan, P., & Mou, J. (2021) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2021.3128405 · Cited by 107 · cited 1×
“As the intelligence factor of the model, knowledge-based strategies and heuristics can significantly improve the optimization performance [50].”
MethodSelf-citationZhang, F., Mei, Y., Nguyen, S., & Zhang, M. (2021) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2021.3056143 · Cited by 98
A Pareto based discrete Jaya algorithm for multi-objective flexible job shop scheduling problem
Caldeira, R. H., & Gnanavelbabu, A. (2021) · Expert Systems with Applications · doi:10.1016/j.eswa.2021.114567 · Cited by 95 · cited 1×
“employed an improved backtracking search algorithm (BSA) to solve an FJSP with new job arrivals, whose objectives are makespan, energy consumption, and instability [10], and then, a discrete Jaya algorithm was utilized to optimize the makespan, total workload of machines and workload of critical machine [11].”
MethodTransfer-robot task scheduling in flexible job shop
Ham, A. (2020) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-020-01537-6 · Cited by 91 · cited 1×
“3145706 including semi-conductor manufacturing [1], chemical engineering [2], and mobile assembling [3].”
BackgroundDeng, Q., Gong, G., Gong, X., Zhang, L., Liu, W., & Ren, Q. (2017) · Computational Intelligence and Neuroscience · doi:10.1155/2017/5232518 · Cited by 79
An, Y., Chen, X., Li, Y., Han, Y., Zhang, J., & Shi, H. (2020) · Applied Soft Computing · doi:10.1016/j.asoc.2020.106869 · Cited by 73 · cited 1×
“non-dominated sorting biogeography-based optimization algorithm to optimize makespan, critical machine workload, and total workload for FJSP [14].”
MethodSelf-citationMulti-clustering via evolutionary multi-objective optimization
Wang, R., Lai, S., Wu, G., Xing, L., Wang, L., & Ishibuchi, H. (2018) · Information Sciences · doi:10.1016/j.ins.2018.03.047 · Cited by 68
Intelligent Scheduling with Reinforcement Learning
Cunha, B., Madureira, A. M., Fonseca, B., & Matos, J. E. (2021) · Applied Sciences · doi:10.3390/app11083710 · Cited by 37 · cited 1×
“Recently, deep reinforcement learning (DRL) techniques that combine RL with deep learning (DL) have been applied in solving combinatorial optimization problems (COPs) [29]–[34], demonstrating the strong learning abilities of DRL for COPs.”
BackgroundWang, Y., Wang, L., Peng, Z., Chen, G., Cai, Z., & Xing, L. (2019) · Swarm and Evolutionary Computation · doi:10.1016/j.swevo.2019.100563 · Cited by 36
Cited by
Song, Y., Ou, J., Pedrycz, W., Suganthan, P. N., Wang, X., Xing, L., & Zhang, Y. (2024) · IEEE Transactions on Systems, Man, and Cybernetics: Systems · doi:10.1109/tsmc.2023.3345928 · Cited by 63
Metadata
- Authors
- Du, Y., Li, J.-Q., Chen, X.-L., Duan, P.-Y., & Pan, Q.-K.
- Venue
- IEEE Transactions on Emerging Topics in Computational Intelligence
- Published
- 2023-08
- Volume
- 7
- Issue
- 4
- Pages
- 1036-1050
- ISSN
- 2471-285X (ISSN-L)
- OpenAlex
- W4210876519
- Cited by
- 202
- References
- 42
- FWCI
- 19.41
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.