Optimal Scheduling of Integrated Demand Response-Enabled Community-Integrated Energy Systems in Uncertain Environments
Open accessThe DOI matches its Crossref record; 23 of the 23 references it cites were found in a registry or an index.
Abstract
The community-integrated energy system (CIES) is an essential energy internet carrier that has recently been the focus of much attention. A scheduling model based on chance-constrained programming is proposed for integrated demand response (IDR) enabled CIES in uncertain environments to minimize the system operating costs, where an IDR program is used to explore the potential interaction ability of electricity–gas–heat flexible loads and electric vehicles. Moreover, power to gas (P2G) and microgas turbine (MT), as the links of multienergy carriers, are adopted to strengthen the coupling of different energy subsystems. Sequence operation theory and linearization methods are employed to transform the original model into a solvable mixed-integer linear programming model. The simulation results on a practical CIES in North China demonstrate an improvement in the CIES operational economy via the coordination of IDR and renewable uncertainties, with P2G and MT enhancing the system operational flexibility and user comprehensive satisfaction. The CIES operation is able to achieve a tradeoff between the economy and system reliability by setting a suitable confidence level for the spinning reserve constraints. Besides, the proposed solution method outperforms the hybrid intelligent algorithm in terms of both optimization results and calculation efficiency.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Modeling of Load Demand Due to EV Battery Charging in Distribution Systems
Qian, K., Zhou, C., Allan, M., & Yuan, Y. (2011) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2010.2057456 · Cited by 1,268 · cited 1×
“The PDFs of the final return time and daily mileage can be described as (3) and (4), respectively [25], [26]:”
BackgroundLi, Y., Han, M., Yang, Z., & Li, G. (2021) · IEEE Transactions on Sustainable Energy · doi:10.1109/tste.2021.3090463 · Cited by 604 · cited 1×
“Note that this work ignores battery degradation, EVs interaction, and load uncertainty, while a more realistic scheduling scenario should consider these factors [34], [35].”
BackgroundSelf-citationClegg, S., & Mancarella, P. (2015) · IEEE Transactions on Sustainable Energy · doi:10.1109/tste.2015.2424885 · Cited by 586 · cited 2×
“Table IV provides the main parameters of the system [23], [28-33].”
BackgroundChen, X., Kang, C., O'Malley, M., Xia, Q., Bai, J., Liu, C., Sun, R., Wang, W., & Li, H. (2015) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2014.2356723 · Cited by 568
Review and prospect of integrated demand response in the multi-energy system
Wang, J., Zhong, H., Ma, Z., Xia, Q., & Kang, C. (2017) · Applied Energy · doi:10.1016/j.apenergy.2017.05.150 · Cited by 521 · cited 1×
“Demand response in IESs has been considered a key measure to stimulate the interaction between demand-side resources and renewable energy [8].”
BackgroundFrom Demand Response in Smart Grid Toward Integrated Demand Response in Smart Energy Hub
Bahrami, S., & Sheikhi, A. (2015) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2015.2464374 · Cited by 472 · cited 1×
“[11], whereby the electricity is switched to natural gas during peak hours.”
BackgroundLi, Y., Yang, Z., Li, G., Zhao, D., & Tian, W. (2019) · IEEE Transactions on Industrial Electronics · doi:10.1109/tie.2018.2840498 · Cited by 414 · cited 3×
“extreme situations where RGs outputs may be zero, the spinning reserve constraint is modeled in a chance constraint form [22]:”
BackgroundMethodInfluentialSelf-citationOptimal residential community demand response scheduling in smart grid
Nan, S., Zhou, M., & Li, G. (2018) · Applied Energy · doi:10.1016/j.apenergy.2017.06.066 · Cited by 319
Self-citationLi, Y., Wang, C., Li, G., Wang, J., Zhao, D., & Chen, C. (2020) · Energy Conversion and Management · doi:10.1016/j.enconman.2020.112526 · Cited by 318 · cited 4×
“Table IV provides the main parameters of the system [23], [28-33].”
BackgroundMethodInfluentialSelf-citationA robust optimization approach for optimal load dispatch of community energy hub
Lu, X., Liu, Z., Ma, L., Wang, L., Zhou, K., & Feng, N. (2020) · Applied Energy · doi:10.1016/j.apenergy.2019.114195 · Cited by 280 · cited 3×
“Numerous approaches have been proposed to deal with the uncertainties associated with IES scheduling [12], including robust optimization [13-15], scenario-based method [16], [17] and chance-constrained programming (CCP) [18], [19].”
BackgroundChen, Q., Wang, F., Hodge, B.-M., Zhang, J., Li, Z., Shafie-Khah, M., & Catalao, J. P. S. (2017) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2017.2693121 · Cited by 271 · cited 1×
“Note that this work ignores battery degradation, EVs interaction, and load uncertainty, while a more realistic scheduling scenario should consider these factors [34], [35].”
BackgroundHe, L., Lu, Z., Zhang, J., Geng, L., Zhao, H., & Li, X. (2018) · Applied Energy · doi:10.1016/j.apenergy.2018.04.119 · Cited by 258 · cited 1×
“[7] proposes a low-carbon scheduling model, in which the P2G device was employed to reduce CO2 emission.”
MethodExploring the trade-offs between electric heating policy and carbon mitigation in China
Wang, J., Zhong, H., Yang, Z., Wang, M., Kammen, D. M., Liu, Z., Ma, Z., Xia, Q., & Kang, C. (2020) · Nature Communications · doi:10.1038/s41467-020-19854-y · Cited by 227 · cited 1×
“The vigorous development of renewable generation (RG) and improvements in energy efficiency are commonly applied by the international community in an attempt to overcome such problems [1], [2].”
BackgroundSelf-citationDistributionally Robust Chance-Constrained Energy Management for Islanded Microgrids
Shi, Z., Liang, H., Huang, S., & Dinavahi, V. (2018) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2018.2792322 · Cited by 209
Optimal Scheduling of the Regional Integrated Energy System Considering Economy and Environment
Wang, Y., Wang, Y., Huang, Y., Yu, H., Du, R., Zhang, F., Zhang, F., & Zhu, J. (2019) · IEEE Transactions on Sustainable Energy · doi:10.1109/tste.2018.2876498 · Cited by 184
A hierarchical energy management strategy for interconnected microgrids considering uncertainty
Bazmohammadi, N., Tahsiri, A., Anvari‐Moghaddam, A., & Guerrero, J. M. (2019) · International Journal of Electrical Power & Energy Systems · doi:10.1016/j.ijepes.2019.02.033 · Cited by 172 · cited 11×
“A solvable mixed-integer linear programming (MILP) model is then determined via the linearization methods, proving to be efficient in solving the CCP model.”
BackgroundInfluentialYang, X., Chen, Z., Huang, X., Li, R., Xu, S., & Yang, C. (2021) · Energy · doi:10.1016/j.energy.2020.119727 · Cited by 170 · cited 3×
“Numerous approaches have been proposed to deal with the uncertainties associated with IES scheduling [12], including robust optimization [13-15], scenario-based method [16], [17] and chance-constrained programming (CCP) [18], [19].”
BackgroundMajidi, M., & Zare, K. (2018) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2018.2867648 · Cited by 148 · cited 3×
“Numerous approaches have been proposed to deal with the uncertainties associated with IES scheduling [12], including robust optimization [13-15], scenario-based method [16], [17] and chance-constrained programming (CCP) [18], [19].”
BackgroundMethodVelarde, P., Valverde, L., Maestre, J. M., Ocampo‐Martínez, C., & Bordons, C. (2017) · Journal of Power Sources · doi:10.1016/j.jpowsour.2017.01.015 · Cited by 119 · cited 2×
“Table IV provides the main parameters of the system [23], [28-33].”
BackgroundLiu, J., Chen, H., Zhang, W., Yurkovich, B. J., & Rizzoni, G. (2016) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2016.2531004 · Cited by 105 · cited 2×
“Table IV provides the main parameters of the system [23], [28-33].”
BackgroundYuan, W., Wang, X., Su, C., Cheng, C., Liu, Z., & Wu, Z. (2021) · Energy · doi:10.1016/j.energy.2021.119996 · Cited by 93 · cited 3×
“Numerous approaches have been proposed to deal with the uncertainties associated with IES scheduling [12], including robust optimization [13-15], scenario-based method [16], [17] and chance-constrained programming (CCP) [18], [19].”
BackgroundMethodLiu, N., Zhou, L., Wang, C., Yu, X., & Ma, X. (2019) · IEEE Transactions on Sustainable Energy · doi:10.1109/tste.2019.2945557 · Cited by 66 · cited 1×
“Since the load shift and interruption inevitably affect user experience, a certain subsidy will generally be provided to users [27].”
BackgroundMao, N., Hao, J., He, T., Song, M., Xu, Y., & Deng, S. (2019) · Renewable Energy · doi:10.1016/j.renene.2019.04.099 · Cited by 54 · cited 2×
“Table IV provides the main parameters of the system [23], [28-33].”
Background
Cited by
Li, Y., Wang, R., Li, Y., Zhang, M., & Long, C. (2023) · Applied Energy · doi:10.1016/j.apenergy.2022.120291 · Cited by 259
Self-citation
Metadata
- Authors
- Li, Y., Wang, B., Yang, Z., Li, J., & Li, G.
- Venue
- IEEE Transactions on Industry Applications
- Published
- 2022-03
- Volume
- 58
- Issue
- 2
- Pages
- 2640-2651
- ISSN
- 0093-9994 (ISSN-L)
- 1939-9367
- OpenAlex
- W3194595441
- Cited by
- 203
- References
- 23
- FWCI
- 9.65
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.