Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 299

The DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.

Robust Load Frequency Control for Power System Considering Transmission Delay and Sampling Period

Shangguan, Xing-Chen, Zhang, Chuan-Ke, He, Yong, Jin, Li, Jiang, Lin, Spencer, Joseph W., Wu, Min·2021·IEEE Transactions on Industrial Informatics

Abstract

Uncertain transmission delays, sampling periods, parameters uncertainties regarding the power system, load fluctuations, and the intermittent generation of renewable energy sources (RESs) will significantly influence a power system's frequency. This article designs a robust delay-dependent PI-based load frequency control (LFC) scheme for a power system based on sampled-data control. First, a sampled-data-based delay-dependent LFC model of power system is constructed. Then, by applying the Lyapunov theory, and the linear matrix inequality technique, a novel stability criterion is developed for the LFC of the power system by considering the sampling period, and transmission delay of the communication network, which ensures that the proposed scheme operates in large sampling periods, and under transmission delays. Next, an exponential decay rate (EDR) is introduced to guide the design of a robust PI-based LFC scheme. The LFC scheme with robustness is designed by setting a small EDR. The values of EDR are adjusted by the given robust performance evaluation conditions of parameter uncertainties, and$H_\infty$performance. Finally, case studies are carried out based on a one-area power system, and a three-area power system with RESs. Simulation results show that the proposed LFC scheme performs strong robustness against parameter uncertainties regarding the power system, and communication network, load fluctuations, and the intermittent generation of RESs.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1109/tii.2020.3026336

Cites

25 of 25 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 25 references

Metadata

Authors
Shangguan, X.-C., Zhang, C.-K., He, Y., Jin, L., Jiang, L., Spencer, J. W., & Wu, M.
Venue
IEEE Transactions on Industrial Informatics
Published
2021-08
Volume
17
Issue
8
Pages
5292-5303
ISSN
  • 1551-3203 (ISSN-L)
  • 1941-0050
OpenAlex
W3088000450
Cited by
299
References
25
FWCI
11.73
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Robust Load Frequency Control for Power System Considering Transmission Delay and Sampling Period. https://app.cochat.ai/papers/10.1109/tii.2020.3026336
The paper
Shangguan, X.-C., Zhang, C.-K., He, Y., Jin, L., Jiang, L., Spencer, J. W., & Wu, M. (2021). Robust Load Frequency Control for Power System Considering Transmission Delay and Sampling Period. IEEE Transactions on Industrial Informatics. https://doi.org/10.1109/tii.2020.3026336

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.