Price-Based Unit Commitment: A Case of Lagrangian Relaxation Versus Mixed Integer Programming
Abstract
This paper formulates the price-based unit commitment (PBUC) problem based on the mixed integer programming (MIP) method. The proposed PBUC solution is for a generating company (GENCO) with thermal, combined-cycle, cascaded-hydro, and pumped-storage units. The PBUC solution by utilizing MIP is compared with that of Lagrangian relaxation (LR) method. Test results on the modified IEEE 118-bus system show the efficiency of our MIP formulation and advantages of the MIP method for solving PBUC. It is also shown that MIP could be applied to solve hydro-subproblems including cascaded-hydro and pumped-storage units in the LR-based framework of hydro-thermal coordination. Numerical experiments on large systems show that the MIP-based computation time and memory requirement would represent the major obstacles for applying MIP to large UC problems. It is noted that the solution of large UC problems could be accomplished by improving the MIP formulation, the utilization of specific structure of UC problems, and the use of parallel processing.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Power Generation, Operation, and Control
Wood, A. J., & Wollenberg, B. F. (1984) · Cited by 8,303
Integer and Combinatorial Optimization
Williams, H. P., Nemhauser, G. L., & Wolsey, L. A. (1990) · Journal of the Operational Research Society · doi:10.2307/2583737 · Cited by 5,485
Partitioning procedures for solving mixed-variables programming problems
Benders, J. F. (1962) · Numerische Mathematik · doi:10.1007/bf01386316 · Cited by 3,855
Market Operations in Electric Power Systems: Forecasting, Scheduling, and Risk Management
Shahidehpour, M., Yamin, H., & Li, Z. (2002) · Wiley eBooks · doi:10.1002/047122412x · Cited by 1,616
Self-citationHill, P. G. (1977) · Cited by 1,394
Model Building in Mathematical Programming
Maher, M. J., & Williams, H. P. (1979) · Journal of the Operational Research Society · doi:10.2307/3009304 · Cited by 1,245
Stoft, S. (2002) · Institute of Electrical and Electronics Engineers eBooks · doi:10.1109/9780470545584 · Cited by 1,160
Integer and combinatorial optimization
(1999) · Computers & Mathematics with Applications · doi:10.1016/s0898-1221(99)91259-2 · Cited by 1,117
Partitioning procedures for solving mixed-variables programming problems
Benders, J. F. (2005) · Computational Management Science · doi:10.1007/s10287-004-0020-y · Cited by 837
Optimal response of a thermal unit to an electricity spot market
Arroyo, J. M., & Conejo, A. J. (2000) · IEEE Transactions on Power Systems · doi:10.1109/59.871739 · Cited by 536 · cited 4×
“A different formulation of minimum on/off time constraints was given in [30].”
BackgroundMethodInfluentialLinear complementarity models of Nash-Cournot competition in bilateral and POOLCO power markets
Hobbs, B. E. (2001) · IEEE Transactions on Power Systems · doi:10.1109/59.918286 · Cited by 522
Linear Complementarity Models of Nash-Cournot Competition in Bilateral and POOLCO Power Markets
Hobbs, B. F. (2001) · IEEE Power Engineering Review · doi:10.1109/mper.2001.4311384 · Cited by 461
Effects of ramp-rate limits on unit commitment and economic dispatch
Wang, C., & Shahidehpour, M. (1993) · IEEE Transactions on Power Systems · doi:10.1109/59.260859 · Cited by 387
Self-citationDillon, T. S., Edwin, K. W., Kochs, H.-D., & Taud, R. J. (1978) · IEEE Transactions on Power Apparatus and Systems · doi:10.1109/tpas.1978.354719 · Cited by 362
Self-scheduling of a hydro producer in a pool-based electricity market
Conejo, A. J., Arroyo, J. M., Contreras, J., & Villamor, F. A. (2002) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2002.804951 · Cited by 326
Short-Term Scheduling of Battery in a Grid-Connected PV/Battery System
Lu, B., & Shahidehpour, M. (2005) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2005.846060 · Cited by 269
Self-citationTakriti, S., Krasenbrink, B., & Wu, L. S.-Y. (2000) · Operations Research · doi:10.1287/opre.48.2.268.12379 · Cited by 217
Optimization-based methods for operations scheduling
Cohen, A. I., & Sherkat, V. R. (1987) · Proceedings of the IEEE · doi:10.1109/proc.1987.13928 · Cited by 191
Price maker self-scheduling in a pool-based electricity market: a mixed-integer LP approach
de la Torre, S., Arroyo, J. M., Conejo, A. J., & Contreras, J. (2002) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2002.804945 · Cited by 188
An Oligopolistic Power Market Model With Tradable NO $_rm x$ Permits
Chen, Y., & Hobbs, B. F. (2005) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2004.840440 · Cited by 131
Optimal generation scheduling with ramping costs
Wang, C., & Shahidehpour, M. (1995) · IEEE Transactions on Power Systems · doi:10.1109/59.373928 · Cited by 103
Self-citationOptimal response of a power generator to energy, AGC, and reserve pool-based markets
Arroyo, J. M., & Conejo, A. J. (2002) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2002.1007910 · Cited by 100
Cited by
Tight and compact MILP formulation for the thermal unit commitment problem
Morales-Espana, Latorre, J. M., & Ramos, A. (2013) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2013.2251373 · Cited by 419
“The work in [21] reduced the number of binary variables, claiming that this speeded up the search process compared with the three-binary models [2], [6].”
BackgroundResultCo-Optimization of Generation Unit Commitment and Transmission Switching With N-1 Reliability
Hedman, K. W., Ferris, M. C., O'Neill, R. P., Fisher, E. B., & Oren, S. S. (2010) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2009.2037232 · Cited by 410
Hourly Coordination of Electric Vehicle Operation and Volatile Wind Power Generation in SCUC
Khodayar, M. E., Wu, L., & Shahidehpour, M. (2012) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2012.2186642 · Cited by 392
Self-citationTrends and challenges in the operation of pumped-storage hydropower plants
Pérez-Díaz, J. I., Chazarra, M., García-González, J., Cavazzini, G., & Stoppato, A. (2015) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2015.01.029 · Cited by 328
Hamian, M., Darvishan, A., Hosseinzadeh, M., Lariche, M. J., Ghadimi, N., & Nouri, A. (2018) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2018.03.022 · Cited by 304
Metadata
- Authors
- Li, T., & Shahidehpour, M.
- Venue
- IEEE Transactions on Power Systems
- Published
- 2005-11
- Volume
- 20
- Issue
- 4
- Pages
- 2015-2025
- ISSN
- 0885-8950 (ISSN-L)
- OpenAlex
- W2111536838
- Cited by
- 427
- References
- 22
- FWCI
- 9.53
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.