The short-term unit commitment (UC) problem in hydrothermal power generation is a large-scale, mixed-integer nonlinear program, which is difficult to solve efficiently, especially for large-scale instances. It is possible to approximate the nonlinear objective function of the problem by means of piecewise-linear functions, so that UC can be approximated by an mixed-integer linear program (MILP); applying the available efficient general-purpose MILP solvers to the resulting formulations, good quality solutions can be obtained in a relatively short amount of time. We build on this approach, presenting a novel way to approximating the nonlinear objective function based on a recently developed class of valid inequalities for the problem, called ldquoperspective cuts.rdquo At least for many realistic instances of a general basic formulation of UC, an MILP-based heuristic obtains comparable or slightly better solutions in less time when employing the new approach rather than the standard piecewise linearizations, while being not more difficult to implement and use. Furthermore, ldquodynamicrdquo formulations, whereby the approximation is iteratively improved, provide even better results if the approximation is appropriately controlled.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A Computationally Efficient Mixed-Integer Linear Formulation for the Thermal Unit Commitment Problem
Carrion, M., & Arroyo, J. M. (2006) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2006.876672 · Cited by 1,731 · cited 7×
“While the resulting formulations are thus reminiscent of the previously-mentioned ones [7]–[10], they differ in some relevant details, as discussed later on.”
BackgroundMethodInfluentialOptimal response of a thermal unit to an electricity spot market
Arroyo, J. M., & Conejo, A. J. (2000) · IEEE Transactions on Power Systems · doi:10.1109/59.871739 · Cited by 536 · cited 2×
“, taking into account market constraints [3], [12].”
BackgroundThe Next Generation of Electric Power Unit Commitment Models
(2001) · International Series in Operations Research & Management Science · doi:10.1007/b108628 · Cited by 261
Experiences with mixed integer linear programming based approaches on short-term hydro scheduling
Chang, G. W., Aganagic, M., Waight, J. G., Medina, J., Burton, T., Reeves, S., & Christoforidis, M. (2001) · IEEE Transactions on Power Systems · doi:10.1109/59.962421 · Cited by 255
Nowak, M. P., & Römisch, W. (2000) · Annals of Operations Research · doi:10.1023/a:1019248506301 · Cited by 253
Price maker self-scheduling in a pool-based electricity market: a mixed-integer LP approach
de la Torre, S., Arroyo, J. M., Conejo, A. J., & Contreras, J. (2002) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2002.804945 · Cited by 188 · cited 2×
“In Section II, we present the mixed-integer nonlinear program formulation of the specific form of UC problem we consider; while we focus, for our results, on a quite “classical” formulation, the idea could easily be applied to a number of other UC problems, e.g., taking into account market constraints [3], [ 12 ].”
MethodModeling of Start-Up and Shut-Down Power Trajectories of Thermal Units
Arroyo, J. M., & Conejo, A. J. (2004) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2004.831654 · Cited by 181 · cited 1×
“the constants and in (3) and (4), respectively), while more sophisticated models of the so-called start-up and shut-down power trajectories have been proposed [3], [14].”
BackgroundLagrangian heuristics based on disaggregated bundle methods for hydrothermal unit commitment
Borghetti, A., Frangioni, A., Lacalandra, F., & Nucci, C. A. (2003) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2002.807114 · Cited by 143 · cited 1×
“, [15]) or in the more sophisticated one recently proposed in [7], could be easily included in the formulation, but they have not been used in the instances used in Section IV since they are not likely to have any significant impact on the relative efficiency of the different approximate formulations tested in this pa…”
MethodSelf-citationLagrangian relaxation and Tabu Search approaches for the unit commitment problem
Borghetti, A., Frangioni, A., Lacalandra, F., Lodi, A., Martello, S., Nucci, C. A., & Trebbi, A. (2002) · doi:10.1109/ptc.2001.964914 · Cited by 53 · cited 1×
“cedure described in [16], which produces a generating set with “small,” “medium,” and “large” thermal units in realistic proportions; the characteristics of each unit are then randomly generated within a set of realistic parameters, depending on the”
BackgroundSelf-citationUsing of a cost-based unit commitment algorithm to assist bidding strategy decisions
Borghetti, A., Rangioni, A., Lacalandra, F., Nucci, C. A., & Pelacchl, P. (2004) · doi:10.1109/ptc.2003.1304673 · Cited by 21 · cited 2×
“timize their production schedule once that their own load profile has been established by the market procedures, and within approaches for computing optimal bidding strategies [2]–[4], [12].”
BackgroundSelf-citation
Cited by
Tight Mixed Integer Linear Programming Formulations for the Unit Commitment Problem
Ostrowski, J., Anjos, M. F., & Vannelli, A. (2012) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2011.2162008 · Cited by 424
Tight and compact MILP formulation for the thermal unit commitment problem
Morales-Espana, Latorre, J. M., & Ramos, A. (2013) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2013.2251373 · Cited by 419
“In [22], a strong formulation of the minimum up/down time constraints is proposed; in [23], a tighter linear approximation for quadratic generation costs is described; the work in [19] presents a new class of inequalities giving a tighter description of the feasible operating schedules for generators; and the work in…”
BackgroundCo-Optimization of Generation Unit Commitment and Transmission Switching With N-1 Reliability
Hedman, K. W., Ferris, M. C., O'Neill, R. P., Fisher, E. B., & Oren, S. S. (2010) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2009.2037232 · Cited by 410
Robust Energy and Reserve Dispatch Under Variable Renewable Generation
Wei, W., Liu, F., Mei, S., & Hou, Y. (2015) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2014.2317744 · Cited by 219
“The quadratic term can be linearized by using the piecewise linear approximation technique given in [25] if a nonlinear solver is not preferred.”
Method
Metadata
- Authors
- Frangioni, A., Gentile, C., & Lacalandra, F.
- Venue
- IEEE Transactions on Power Systems
- Published
- 2009-02
- Volume
- 24
- Issue
- 1
- Pages
- 105-113
- ISSN
- 0885-8950 (ISSN-L)
- 1558-0679
- OpenAlex
- W331770001
- Cited by
- 248
- References
- 10
- FWCI
- 5.68
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.