Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 229

The DOI matches its Crossref record.

Operating Strategies for a GB Integrated Gas and Electricity Network Considering the Uncertainty in Wind Power Forecasts

Open access
Qadrdan, Meysam, Wu, Jianzhong, Jenkins, Nick, Ekanayake, Janaka·2014·IEEE Transactions on Sustainable Energy

Abstract

In many power systems, in particular in Great Britain (GB), significant wind generation is anticipated and gas-fired generation will continue to play an important role. Gas-fired generating units act as a link between the gas and electricity networks. The variability of wind power is, therefore, transferred to the gas network by influencing the gas demand for electricity generation. Operation of a GB integrated gas and electricity network considering the uncertainty in wind power forecast was investigated using three operational planning methods: deterministic, two-stage stochastic programming, and multistage stochastic programming. These methods were benchmarked against a perfect foresight model which has no uncertainty associated with the wind power forecast. In all the methods, thermal generators were controlled through an integrated unit commitment and economic dispatch algorithm that used mixed integer programming. The nonlinear characteristics of the gas network, including the gas flow along pipes and the operation of compressors, were taken into account and the resultant nonlinear problem was solved using successive linear programming. The operational strategies determined by the stochastic programming methods showed reductions of the operational costs compared to the solution of the deterministic method by almost 1%. Also, using the stochastic programming methods to schedule the thermal units was shown to make a better use of pumped storage plants to mitigate the variability and uncertainty of the net demand.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1109/tste.2013.2274818

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 229

Metadata

Authors
Qadrdan, M., Wu, J., Jenkins, N., & Ekanayake, J.
Venue
IEEE Transactions on Sustainable Energy
Published
2014-01
Volume
5
Issue
1
Pages
128-138
ISSN
  • 1949-3029 (ISSN-L)
  • 1949-3037
OpenAlex
W1991393594
Cited by
229
References
0
FWCI
4.79
Type
journal article
Language
en
Open access
hybrid

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Operating Strategies for a GB Integrated Gas and Electricity Network Considering the Uncertainty in Wind Power Forecasts. https://app.cochat.ai/papers/10.1109/tste.2013.2274818
The paper
Qadrdan, M., Wu, J., Jenkins, N., & Ekanayake, J. (2014). Operating Strategies for a GB Integrated Gas and Electricity Network Considering the Uncertainty in Wind Power Forecasts. IEEE Transactions on Sustainable Energy. https://doi.org/10.1109/tste.2013.2274818

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.