The DOI matches its Crossref record.
PLANNING AND TACTICAL FACTORS IN THE PROJECT IMPLEMENTATION PROCESS
Abstract
It has been a well‐recognized axiom in project management research that the project implementation process can be greatly facilitated by addressing a variety of project critical success factors. It is argued here that critical factors often fall into two distinct sub‐groups: those related to initial project planning and those concerned with subsequent tactical operationalization. A field study was conducted to explore changes in the perceived importance of project planning and tactical factors across four stages in the project life cycle. The sample consisted of 408 managers currently involved in projects. It was found that the relative importance of planning and tactical factors varies across the project life cycle. Further, the perceived importance of these factors is contingent upon the type of success measure employed. When an efficiency success measure is used, planning factors are initially perceived to be of high importance but are overtaken by tactical issues as the project progresses through its life cycle. When ‘external’ success measures (perceived value of the project and client satisfaction) are employed, project planning factors dominate tactics throughout the project's life cycle. Finally, implications for managers are developed and directions for future research are discussed.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187
No project is an island: linking projects to history and context
Engwall, M. (2003) · Research Policy · doi:10.1016/s0048-7333(02)00088-4 · Cited by 1,142
The relationship between corporate entrepreneurship and strategic management
Barringer, B. R., & Bluedorn, A. C. (1999) · Strategic Management Journal · doi:10.1002/(sici)1097-0266(199905)20:5<421::aid-smj30>3.0.co;2-o · Cited by 1,058
A Retrospective look at our Evolving Understanding of Project Success
Jugdev, K., & Müller, R. (2005) · Project Management Journal · doi:10.1177/875697280503600403 · Cited by 907
Inquiring into the temporary organization: New directions for project management research
Packendorff, J. (1995) · Scandinavian Journal of Management · doi:10.1016/0956-5221(95)00018-q · Cited by 753
Metadata
- Authors
- Pinto, J. K., & Prescott, J. E.
- Venue
- Journal of Management Studies
- Publisher
- Wiley
- Published
- 1990-05
- Volume
- 27
- Issue
- 3
- Pages
- 305-327
- ISSN
- 0022-2380 (ISSN-L)
- 1467-6486
- OpenAlex
- W2029818164
- Cited by
- 234
- References
- 0
- FWCI
- 0.56
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: PLANNING AND TACTICAL FACTORS IN THE PROJECT IMPLEMENTATION PROCESS. https://app.cochat.ai/papers/10.1111/j.1467-6486.1990.tb00249.x
- The paper
- Pinto, J. K., & Prescott, J. E. (1990). PLANNING AND TACTICAL FACTORS IN THE PROJECT IMPLEMENTATION PROCESS. Journal of Management Studies. https://doi.org/10.1111/j.1467-6486.1990.tb00249.x
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.