Causes of Disaster: Sloppy Management
The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Abstract
SUMMARY: The loss of control associated with accidents and disasters can have severe negative consequences for the organizations involved. Some disasters are caused by inadequacies of management, or by unprofessional behaviour but others arise when disaster preconditions are generated as a result of the normal functioning of larger managerial and technical systems. During the incubation period preceding a major incident, therefore, two levels of correction need to be considered to avoid disasters. ‘Sloppy management’ of various kinds can be tackled by establishing, strengthening and asserting appropriate forms of management control. The system properties which constitute disaster preconditions are less immediately accessible to management control. At both levels managers in pursuit of high reliability should expect to have to make a range of trade‐offs.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Reason, J. (1990) · doi:10.1017/cbo9781139062367 · Cited by 5,108
Normal Accidents: Living with High-Risk Technologies
Cummings, L. L., & Perrow, C. (1984) · Administrative Science Quarterly · doi:10.2307/2392945 · Cited by 2,861
Cited by
Mindfulness and the Quality of Organizational Attention
Weick, K. E., & Sutcliffe, K. M. (2006) · Organization Science · doi:10.1287/orsc.1060.0196 · Cited by 925
“The concept of normalization was drafted to explain Vaughan's (1996) finding in the Chal lenger shuttle disaster that reified launch routines in NASA were preserved when anomalous events pro duced by inadequate solid rocket booster seals, events that should have been singled out and given a distinc tive label, were no…”
BackgroundSafety culture: Key theoretical issues
Pidgeon, N. (1998) · Work & Stress · doi:10.1080/02678379808256862 · Cited by 309
Small business research: Time for a crisis-based view
Herbane, B. (2010) · International Small Business Journal: Researching Entrepreneurship · doi:10.1177/0266242609350804 · Cited by 283
`Surviving the Rigs': Safety and Surveillance on North Sea Oil Installations
Collinson, D. L. (1999) · Organization Studies · doi:10.1177/0170840699204003 · Cited by 237
The evolution of business continuity management: A historical review of practices and drivers
Herbane, B. (2010) · Business History · doi:10.1080/00076791.2010.511185 · Cited by 237
“Examination of the pre-, trans- and post-crisis phases of the crisis chronology (Fink, 1986 ; Seymour & Moore, 2000 ; Smith, 1990 ; Turner, 1976 , 1994 );”
Background
Metadata
- Authors
- Turner, B. A.
- Venue
- British Journal of Management
- Publisher
- Wiley
- Published
- 1994-09
- Volume
- 5
- Issue
- 3
- Pages
- 215-219
- ISSN
- 1045-3172 (ISSN-L)
- 1467-8551
- OpenAlex
- W2085654644
- Cited by
- 143
- References
- 2
- FWCI
- 2.72
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Causes of Disaster: Sloppy Management. https://app.cochat.ai/papers/10.1111/j.1467-8551.1994.tb00172.x
- The paper
- Turner, B. A. (1994). Causes of Disaster: Sloppy Management. British Journal of Management. https://doi.org/10.1111/j.1467-8551.1994.tb00172.x
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.