Neuro‐Fuzzy Cost Estimation Model Enhanced by Fast Messy Genetic Algorithms for Semiconductor Hookup Construction

Open access
Hsiao, Fan‐Yi, Wang, Shih‐Hsu, Wang, Wei‐Chih, Wen, Chao‐Pao, Yu, Wen‐Der · 2012 · Computer-Aided Civil and Infrastructure Engineering
Cited by 62

The DOI matches its Crossref record.

Abstract

Semiconductor hookup construction (i.e., constructing process tool piping systems) is critical to semiconductor fabrication plant completion. During the conceptual project phase, it is difficult to conduct an accurate cost estimate due to the great amount of uncertain cost items. This study proposes a new model for estimating semiconductor hookup construction project costs. The developed model, called FALCON‐COST, integrates the component ratios method, fuzzy adaptive learning control network (FALCON), fast messy genetic algorithm (fmGA), and three‐point cost estimation method to systematically deal with a cost‐estimating environment involving limited and uncertain data. In addition, the proposed model improves the current FALCON by devising a new algorithm to conduct building block selection and random gene deletion so that fmGA operations can be implemented in FALCON. The results of 54 case studies demonstrate that the proposed model has estimation accuracy of 83.82%, meaning it is approximately 22.74%, 23.08%, and 21.95% more accurate than the conventional average cost method, component ratios method, and modified FALCON‐COST method, respectively. Providing project managers with reliable cost estimates is essential for effectively controlling project costs.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1111/j.1467-8667.2012.00786.x

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

Metadata

Authors
Hsiao, F., Wang, S., Wang, W., Wen, C., & Yu, W.
Venue
Computer-Aided Civil and Infrastructure Engineering
Publisher
Elsevier BV
Published
2012-09-17
Volume
27
Issue
10
Pages
764-781
ISSN
  • 1093-9687 (ISSN-L)
  • 1467-8667
OpenAlex
W1505686907
Cited by
62
References
0
FWCI
15.52
Type
journal article
Language
en
Open access
hybrid

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.