Managing Supply Risk with Early Supplier Involvement: A Case Study and Research Propositions
The DOI matches its Crossref record; 40 of the 40 references it cites were found in a registry or an index.
Abstract
Summary: While there have been numerous reports of benefits associated with adoption of early supplier involvement (ESI) in product design, particularly in reducing the duration of the design process and improving design outcomes, this study extends a recent stream of research indicating that ESI may be a useful tool for managing supply risk. Utilizing a case‐study approach, the current research explores the extent to which ESI reduces the likelihood of supply disruptions and other negative supply events for an aerospace supplier. Although initial adoption of ESI was intended to reduce supply costs, results indicated that ESI serves to reduce perceptions of supply risk at this firm. Factors associated with risk reductions are discussed in the context of agency theoretic variables, and a series of research propositions are presented to build theory in supply risk management.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Case Study Research: Design and Methods
Chaiklin, H. (1991) · The Journal of Nervous and Mental Disease · doi:10.1097/00005053-199102000-00025 · Cited by 39,535
Building Theories from Case Study Research
Eisenhardt, K. M. (1989) · The Academy of Management Review · doi:10.2307/258557 · Cited by 17,455
Agency Theory: An Assessment and Review
Eisenhardt, K. M. (1989) · The Academy of Management Review · doi:10.5465/amr.1989.4279003 · Cited by 13,338
Information Distortion in a Supply Chain: The Bullwhip Effect
Lee, H. L., Padmanabhan, V., & Whang, S. (1997) · Management Science · doi:10.1287/mnsc.43.4.546 · Cited by 4,698
Qualitative data analysis: A sourcebook of new methods
Dijkstra, L. (1985) · European Journal of Operational Research · doi:10.1016/0377-2217(85)90239-5 · Cited by 2,880
Improving Pregnancy Outcome during Imprisonment: A Model Residential Care Program
Siefert, K., & Pimlott, S. (2001) · Social Work · doi:10.1093/sw/46.2.125 · Cited by 1,647
Clockspeed: winning industry control in the age of temporary advantage
(1999) · Choice Reviews Online · doi:10.5860/choice.36-4573 · Cited by 1,447
Effective case research in operations management: a process perspective
Stuart, I., McCutcheon, D., Handfield, R., McLachlin, R., & Samson, D. (2002) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00022-0 · Cited by 1,050
THE USE OF THE CASE STUDY METHOD IN LOGISTICS RESEARCH
Ellram, L. M. (1996) · Journal of Business Logistics · Cited by 949
Success Factors for Integrating Suppliers into New Product Development
Ragatz, G. L., Handfield, R. B., & Scannell, T. V. (1997) · Journal of Product Innovation Management · doi:10.1111/1540-5885.1430190 · Cited by 877
Cited by
Supply chain risk management: a literature review
Ho, W., Zheng, T., Yildiz, H., & Talluri, S. (2015) · International Journal of Production Research · doi:10.1080/00207543.2015.1030467 · Cited by 1,363
Supply chain resilience in the global financial crisis: an empirical study
Jüttner, U., & Maklan, S. (2011) · Supply Chain Management: An International Journal · doi:10.1108/13598541111139062 · Cited by 1,213
Supply chain risks: a review and typology
Rao, S., & Goldsby, T. J. (2009) · The International Journal of Logistics Management · doi:10.1108/09574090910954864 · Cited by 797
Measuring supply chain resilience using a deterministic modeling approach
Soni, U., Jain, V., & Kumar, S. (2014) · Computers & Industrial Engineering · doi:10.1016/j.cie.2014.04.019 · Cited by 474
Supplier selection in resilient supply chains: a grey relational analysis approach
Rajesh, R., & Ravi, V. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.08.054 · Cited by 443
Sustainability to support end-to-end value chains: the role of supply chain management
Closs, D. J., Speier, C., & Meacham, N. (2011) · Journal of the Academy of Marketing Science · doi:10.1007/s11747-010-0207-4 · Cited by 400
Buyer perceptions of supply disruption risk: A behavioral view and empirical assessment
Ellis, S. C., Henry, R. M., & Shockley, J. (2010) · Journal of Operations Management · doi:10.1016/j.jom.2009.07.002 · Cited by 380
Perspectives on risk management in supply chains
Narasimhan, R., & Talluri, S. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2009.02.001 · Cited by 348
Zhao, L., Huo, B., Sun, L., & Zhao, X. (2013) · Supply Chain Management: An International Journal · doi:10.1108/13598541311318773 · Cited by 343
A multi-agent based framework for supply chain risk management
Giannakis, M., & Louis, M. (2011) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2010.05.001 · Cited by 338
Supply chain risk identification with value‐focused process engineering
Neiger, D., Rotaru, K., & Churilov, L. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2007.11.003 · Cited by 287
Joint supply chain risk management: An agency and collaboration perspective
Li, G., Fan, H., Lee, P. K. C., & Cheng, T. C. E. (2015) · International Journal of Production Economics · doi:10.1016/j.ijpe.2015.02.021 · Cited by 272
Supply chain resilience: a dynamic and multidimensional approach
Adobor, H., & McMullen, R. S. (2018) · The International Journal of Logistics Management · doi:10.1108/ijlm-04-2017-0093 · Cited by 266
Minimizing supply chain disruption risk through enhanced flexibility
Skipper, J. B., & Hanna, J. B. (2009) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030910973742 · Cited by 247
Agency theory and supply chain management: a structured literature review
Fayezi, S., O'Loughlin, A., & Zutshi, A. (2012) · Supply Chain Management: An International Journal · doi:10.1108/13598541211258618 · Cited by 245
“For example, Zsidisin and Smith (2005) show how in the aerospace industry, compliance strategies (such as early supplier involvement) have not only been used as a means of gathering information about behaviours of suppliers in order to mitigate risks and strengthen the principal and agent…”
BackgroundWu, K.-J., Liao, C.-J., Tseng, M.-L., Lim, M. K., Hu, J., & Tan, K. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.04.040 · Cited by 243
Rajesh, R., & Ravi, V. (2015) · Computers & Industrial Engineering · doi:10.1016/j.cie.2015.04.028 · Cited by 243
Early supplier integration: the dual role of purchasing in new product development
Schiele, H. (2010) · R&D Management · doi:10.1111/j.1467-9310.2010.00602.x · Cited by 240
Research opportunities in supply chain management
Stock, J. R., Boyer, S. L., & Harmon, T. (2010) · Journal of the Academy of Marketing Science · doi:10.1007/s11747-009-0136-2 · Cited by 235
“Scholars will need to examine the antecedents and consequences of these disruptions and uncertainties (Blackhurst et al. 2008; Chopra and Sodhi 2004; Manuj and Mentzer 2008; Paulraj and Chen 2007; Rigby and Bilodeau 2007; Roth et al. 2008; Stokes 2008; Wagner and Bode 2008; Zsidisin and Smith 2005).”
BackgroundAn inventory of theory in logistics and SCM research
Clifford Defee, C., Williams, B., Randall, W. S., & Thomas, R. (2010) · The International Journal of Logistics Management · doi:10.1108/09574091011089817 · Cited by 231
Bode, C., & Macdonald, J. R. (2017) · Decision Sciences · doi:10.1111/deci.12245 · Cited by 208
“…each firm, and is referred to in the literature in the context of risk plans (Mitroff & Alpaslan, 2003), training and rehearsing for crises (Sniezek, Wilkins, Wadlington, & Baumann, 2002), choosing strategies for mitigation (Tang, 2006), and implementation of those plans (Zsidisin & Smith, 2005).”
BackgroundAchieving Sustainable Development by Collaborating in Green Product Innovation
Melander, L. (2017) · Business Strategy and the Environment · doi:10.1002/bse.1970 · Cited by 204
An agency theory perspective on supply chain quality management
Zu, X., & Kaynak, H. (2012) · International Journal of Operations & Production Management · doi:10.1108/01443571211223086 · Cited by 204
“Length of relationship The duration of buyer-supplier relationships (Eisenhardt, 1989; Heide and Stump, 1995; Zsidisin and Smith, 2005) Number of years doing business with suppliers (Buvik and Halskau, 2001; Buvik and Haugland, 2005; Kotabe et al.”
BackgroundMAKING SENSE OF SUPPLY DISRUPTION RISK RESEARCH: A CONCEPTUAL FRAMEWORK GROUNDED IN ENACTMENT THEORY
ELLIS, S. C., SHOCKLEY, J., & HENRY, R. M. (2011) · Journal of Supply Chain Management · doi:10.1111/j.1745-493x.2011.03217.x · Cited by 194
“Several mitigation tactics, such as early supplier involvement (Zsidisin and Smith 2005), information sharing (Li, Lin, Wang and Yan 2006), buyer–supplier relationship management (Sinha, Whitman and Malzahn 2004), contingency planning (Tomlin and Wang 2005; Tomlin 2006), sourcing policy and…”
BackgroundInfluentialUrciuoli, L., Mohanty, S., Hintsa, J., & Gerine Boekesteijn, E. (2014) · Supply Chain Management: An International Journal · doi:10.1108/scm-09-2012-0307 · Cited by 189
“This process cannot happen in isolation; instead it implies vertical co-operation and early involvement of suppliers in product concept development and design (Khan et al., 2012; Zsidisin and Smith, 2005).”
BackgroundArshinder, K., Kanda, A., & Deshmukh, S. G. (2011) · Supply Chain Coordination under Uncertainty · doi:10.1007/978-3-642-19257-9_3 · Cited by 184
“Early supply involvement reduces the likelihood of supply disruptions and negative supply events (Zsidsin and Smith 2005).”
BackgroundSUPPLIER INNOVATIVENESS AND SUPPLIER PRICING: THE ROLE OF PREFERRED CUSTOMER STATUS
SCHIELE, H., VELDMAN, J., & HÜTTINGER, L. (2011) · International Journal of Innovation Management · doi:10.1142/s1363919611003064 · Cited by 179
The impact of product design on supply chain risk: a case study
Khan, O., Christopher, M., & Burnes, B. (2008) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030810882834 · Cited by 170
“The impact of design on supply chain risk has been explored by Zsidisin et al. (2005)”
BackgroundModels for supplier selection and risk mitigation: a holistic approach
Yoon, J., Talluri, S., Yildiz, H., & Ho, W. (2018) · International Journal of Production Research · doi:10.1080/00207543.2017.1403056 · Cited by 162
“, 2005), early supplier involvement (Zsidisin and Smith, 2005), adopting business continuity planning as a formal risk management technique (Zsidisin et al.”
BackgroundAligning product design with the supply chain: a case study
Khan, O., Christopher, M., & Creazza, A. (2012) · Supply Chain Management: An International Journal · doi:10.1108/13598541211227144 · Cited by 159
Metadata
- Authors
- Zsidisin, G. A., & Smith, M. E.
- Venue
- Journal of Supply Chain Management
- Publisher
- Wiley
- Published
- 2005-10-10
- Volume
- 41
- Issue
- 4
- Pages
- 44-57
- ISSN
- 1055-6001 (ISSN-L)
- 1523-2409
- 1745-493X
- OpenAlex
- W2023595300
- Cited by
- 288
- References
- 40
- FWCI
- 18.32
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.