The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Managing Demand Risk in Tactical Supply Chain Planning for a Global Consumer Electronics Company
Open accessAbstract
We consider the problem of managing demand risk in tactical supply chain planning for a particular global consumer electronics company. The company follows a deterministic replenishment‐and‐planning process despite considerable demand uncertainty. As a possible way to formally address uncertainty, we provide two risk measures, “demand‐at‐risk” (DaR) and “inventory‐at‐risk” (IaR) and two linear programming models to help manage demand uncertainty. The first model is deterministic and can be used to allocate the replenishment schedule from the plants among the customers as per the existing process. The other model is stochastic and can be used to determine the “ideal” replenishment request from the plants under demand uncertainty. The gap between the output of the two models as regards requested replenishment and the values of the risk measures can be used by the company to reallocate capacity among different products and to thus manage demand/inventory risk.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Operating Flexibility, Global Manufacturing, and the Option Value of a Multinational Network
Kogut, B., & Kulatilaka, N. (1994) · Management Science · doi:10.1287/mnsc.40.1.123 · Cited by 1,131 · cited 1×
“There is greater reliance on economic theory including incentives and game-theoretic modeling and well as on incorporating market information, e.g., using real options (e.g., Miller and Park 2005; Kleindorfer and Wu 2003; Huchzermeier and Cohen 1996; Kogut and Kulatilaka 1994).”
Background
Cited by
Managing Disruption Risks in Supply Chains
Kleindorfer, P. R., & Saad, G. H. (2005) · Production and Operations Management · doi:10.1111/j.1937-5956.2005.tb00009.x · Cited by 2,088
The Severity of Supply Chain Disruptions: Design Characteristics and Mitigation Capabilities
Craighead, C. W., Blackhurst, J., Rungtusanatham, M. J., & Handfield, R. B. (2007) · Decision Sciences · doi:10.1111/j.1540-5915.2007.00151.x · Cited by 1,685
Supply chain risk management: a literature review
Ho, W., Zheng, T., Yildiz, H., & Talluri, S. (2015) · International Journal of Production Research · doi:10.1080/00207543.2015.1030467 · Cited by 1,363
Hendricks, K. B., & Singhal, V. R. (2005) · Production and Operations Management · doi:10.1111/j.1937-5956.2005.tb00008.x · Cited by 1,303
Identifying risk issues and research advancements in supply chain risk management
Tang, O., & Nurmaya Musa, S. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.06.013 · Cited by 979
Metadata
- Authors
- Sodhi, M. S.
- Venue
- Production and Operations Management
- Publisher
- SAGE Publications
- Published
- 2005-01-03
- Volume
- 14
- Issue
- 1
- Pages
- 69-79
- ISSN
- 1059-1478 (ISSN-L)
- 1937-5956
- OpenAlex
- W2145083481
- Cited by
- 172
- References
- 1
- FWCI
- 14.45
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Managing Demand Risk in Tactical Supply Chain Planning for a Global Consumer Electronics Company. https://app.cochat.ai/papers/10.1111/j.1937-5956.2005.tb00010.x
- The paper
- Sodhi, M. S. (2005). Managing Demand Risk in Tactical Supply Chain Planning for a Global Consumer Electronics Company. Production and Operations Management. https://doi.org/10.1111/j.1937-5956.2005.tb00010.x
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.