CoChat

Life Cycle Assessment of Construction and Demolition Waste from Railway Engineering Projects

Huang, Jianling, Yin, Yang, Zheng, Lei, Zhang, Sibo, Zhao, Qingyun, Chen, Huihua · 2022 · Computational Intelligence and Neuroscience
Cited by 6

The DOI matches its Crossref record; 4 of the 4 references it cites were found in a registry or an index.

Abstract

Railway engineering generates large amounts of construction and demolition waste (CDW). To quantify the amount of CDW generated from railway engineering projects throughout the whole life cycle, a process-based life cycle assessment model is proposed in this paper. The life-cycle CDW is divided into four parts: CDW from off-site transportation of construction materials (OSTCM), CDW from site operation wastage of construction materials (SOWCM), discard ballast from roadbeds, stationyard, bridges and tunnels (DB), and CDW from reparation and renewal of aging components (RRAC). Yun-Gui Railway is selected as a case study to validate the developed model, and an uncertainty analysis is conducted with Oracle Crystal Ball software. The results show that between 175 and 311 million tons of CDW is generated throughout the whole life cycle of Yun-Gui Railway. DB is the largest component of the life-cycle CDW from railway engineering projects. This indicates the negative environmental impacts of railway construction can be significantly mitigated by optimizing the location of ballast disposal sites and developing suitable landfill proposals. Also, the CDW generated by wastage of construction materials during off-site construction and site operation is important in waste management in railway engineering projects, in which rubble, sand, and cement have the high potential for waste reduction. Findings from this study can contribute to the knowledge body as well as the engineering practice in green railways.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1155/2022/6145755

Cites

4 of 4 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Research works printed but not linked: 38

  1. 10.1016/j.jclepro.2020.121405 · DOI · Paper page
  2. 10.1002/sd.2119 · DOI
  3. 10.1016/j.jclepro.2019.118163 · DOI · Paper page
  4. 10.1016/j.resconrec.2015.11.001 · DOI
  5. 10.1080/15623599.2021.1874677 · DOI
  6. 10.1177/0734242x11423955 · DOI · Paper page
  7. 10.1177/0734242x16666944 · DOI
  8. 10.1109/actea.2016.7560117 · doi:10.1109/actea.2016.7560117
  9. X. Yu, 2020, A review on reduction of construction engineering waste in China and exploration on the assessment standard, Environmental Engineering, 38, 1
  10. 10.13205/j.hjgc.202001019 · doi:10.13205/j.hjgc.202001019
  11. 10.13205/j.hjgc.202003003 · doi:10.13205/j.hjgc.202003003
  12. 10.1177/0734242X19886635 · DOI
  13. 10.13205/j.hjgc.201810020 · doi:10.13205/j.hjgc.201810020
  14. J. Tu, 2017, Quantitative estimation model of solid waste on construction site, Journal of Wuhan University of Technology, 11, 61
  15. 10.1007/s00267-022-01617-8 · DOI
  16. 10.1109/TCSS.2022.3158585 · DOI · Paper page
  17. 10.1016/j.wasman.2014.05.010 · DOI · Paper page
  18. 10.1016/j.wasman.2010.04.008 · DOI · Paper page
  19. 10.1016/j.autcon.2013.05.002 · DOI
  20. 10.1016/j.wasman.2010.01.008 · DOI
  21. ISO, 2006, ISO 14040:2006. Environmental Management - Life Cycle Assessment - Principles and Framework
  22. ISO, 2006, ISO 14044:2006 Environmental Management - Life Cycle Assessment - Requirements and Guidelines
  23. 10.1016/j.jclepro.2021.130083 · DOI · Paper page
  24. 10.1007/s11367-019-01727-2 · DOI
  25. 10.1016/j.trd.2015.09.017 · doi:10.1016/j.trd.2015.09.017
  26. 10.1111/jiec.12824 · doi:10.1111/jiec.12824
  27. 10.3390/su12010206 · DOI
  28. 10.1016/j.eiar.2020.106444 · DOI
  29. 10.1016/j.trd.2010.12.004 · DOI · Paper page
  30. 10.1016/j.jclepro.2018.04.022 · DOI
  31. 10.1016/j.trd.2015.10.005 · DOI
  32. 10.1016/j.eiar.2021.106608 · DOI
  33. 10.1007/s11367-016-1177-7 · DOI
  34. China Railway Administration, 2017, Railway Engineering Basic Quota
  35. Y. Dai, 2020, The Influence of Gross weight of trains passing through beijing-Guangzhou railway on rail damage, China Railway, 2020, 74
  36. Z. Q. N. Xi, 2004, Distribution and prediction of rail fatigue failures, China Railway Science, 5, 55
  37. 10.1016/j.resconrec.2018.09.029 · DOI · Paper page
  38. 10.1016/j.wasman.2012.01.007 · DOI

Metadata

Authors
Huang, J., Yin, Y., Zheng, L., Zhang, S., Zhao, Q., & Chen, H.
Affiliations
  • School of Civil Engineering, Central South University, Changsha, China
  • School of Civil Engineering, Anhui Jianzhu University, Hefei, China
Venue
Computational Intelligence and Neuroscience
Publisher
Wiley
Published
2022-04-28
Volume
2022
Pages
1-10
ISSN
  • 1687-5273
  • 1687-5265
Cited by
6
References
4
Language
en
Funders
  • Science and Technology R & D Program of China Railway Corporation Limited (2021-ZHONGDA-06, 2021ZZTS0245)
  • Fundamental Research Funds for Central Universities of the Central South University (2021-ZHONGDA-06, 2021ZZTS0245)

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.