CoChat

Automatic Task Planning and Its On-Orbit Verification of Agile Remote Sensing Satellite

Open access
Yahang, Zhang, Haiyue, Yang, Mengfei, Yang, Ruochu, Yang, Shuhang, Leng · 2023 · International Journal of Aerospace Engineering

The DOI matches its Crossref record; 18 of the 18 references it cites were found in a registry or an index.

Abstract

An on-board autonomous task planning system is designed and implemented in this article, aiming at the problem that the current remote sensing satellite needs complex instruction support to perform tasks and depends on the ground system too much. The complex earth observation task description and injection decomposition modules are designed in the system. No more than 128 ordered points describe the curve area task or irregular polygon area task, and the complex task is decomposed into several strips according to the satellite imaging width. Then, the task’s orbit, attitude, mobility, energy, and time constraints are calculated through the modules of on-board orbit prediction, agile attitude calculation, track planning, energy prediction, and visible arc calculation. Finally, the on-board autonomous task planning and execution are completed through task solution space search and metatask command generation modules. The on-orbit flight verification is carried out on the high-resolution multimode (GFDM) satellite. The results show that this paper’s on-board autonomous task planning system can complete complex task injection and autonomous planning and finally execute.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1155/2023/8923088

Cites

18 of 18 references verified0 citation errors · 0 not checkable

Statistics

Figures

Figure 1 On-board task planning architecture.
Figure 1 On-board task planning architecture.CC-BY · From the PDF
Figure 2 A polygonal area complex task decomposition.
Figure 2 A polygonal area complex task decomposition.CC-BY · From the PDF
Figure 4 Decomposition of the curve strip task.
Figure 4 Decomposition of the curve strip task.CC-BY · From the PDF
Figure 5 Scheme of visible window calculation.
Figure 5 Scheme of visible window calculation.CC-BY · From the PDF
Geography location of all description point (longitude and latitude)
Geography location of all description point (longitude and latitude)CC-BY · From the PDF
Figure 6 Instruction package on curve complex task.
Figure 6 Instruction package on curve complex task.CC-BY · From the PDF
Figure 8 On-board attitude planning and trajectory planning of curve complex tasks.
Figure 8 On-board attitude planning and trajectory planning of curve complex tasks.CC-BY · From the PDF
Figure 9 The curve strip task shown in map software.
Figure 9 The curve strip task shown in map software.CC-BY · From the PDF
Figure 10 Imaging result of Figure 9(b) by on-board mission planning.
Figure 10 Imaging result of Figure 9(b) by on-board mission planning.CC-BY · From the PDF
Image 10
CC-BY · From the PDF
Figure 11 Non-along-track strip task shown in map software.
Figure 11 Non-along-track strip task shown in map software.CC-BY · From the PDF

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Research works printed but not linked: 7

  1. 1. W. Jiang, H. Hao, and Y. Li, "Review of task scheduling research for the Earth observation satellites," System Engineer- ing and Electronics, vol. 35, pp. 1878-1885, 2013.
  2. 5. K. Zhang, Y. Sun, L. Xia, Z. Zhu, and J. Wang, "A method of network satellite on-orbit distributed collaborative mission scheduling," Journal of Harbin Engineering University, vol. 40, pp. 393-399, 2019.
  3. 6. L. Yu, X. Wu, Y. Mao, H. Gao, and Y. Hao, "Task allocation for distributed remote sensing satellites based on contract network algorithm," Journal of Harbin Engineering University, vol. 41, pp. 1059-1065, 2020.
  4. 9. Z. Yan, Y. Chen, and L. Xing, "Agile satellite scheduling based on improved ant colony algorithm," System Engineering The- ory & Practice, vol. 34, pp. 793-801, 2014.
  5. 14. Y. Li, Z. Sun, and D. Ye, "Robust PD+ controller for satellite attitude fast maneuvering," Journal of Harbin Engineering University, vol. 40, pp. 703-709, 2019.
  6. 19. L. Yu, J. Wang, and S. Zhao, "Design and verification of GFDM satellite ground-to-satellite task management procedure," Spacecraft Engineering, vol. 30, pp. 43-51, 2021.
  7. 20. X. Dong, Research on multi type task combination scheduling method of optical imaging agile satellite, Harbin Institute of technology, 2017.

Cited by

See all 3

Metadata

Authors
Yahang, Z., Haiyue, Y., Mengfei, Y., Ruochu, Y., & Shuhang, L.
Affiliations
  • College of Computer Science and Technology, Xidian University, Xi’an 710071, China
  • College of Aerospace and Civil Engineering, Harbin Engineering University, Harbin 150001, China
  • Institute of Spacecraft System Engineering (CN)
  • Harbin Engineering University (CN)
Venue
International Journal of Aerospace Engineering
Publisher
Wiley
Published
2023-02-28
Volume
2023
Pages
1-10
ISSN
  • 1687-5966 (ISSN-L)
  • 1687-5974
OpenAlex
W4322621593
Cited by
3
References
18
Citations by year
2025: 3
FWCI
0.37
Type
journal article
Language
en
Open access
Locations
  • International Journal of Aerospace Engineering (publishedVersion, cc-by)
  • DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
Funders
Fundamental Research Funds for the Central Universities (D030307, 3072022JC0202)
Topics
  • Physical Sciences › Engineering › Aerospace Engineering › Spacecraft Design and Technology
  • Physical Sciences › Engineering › Aerospace Engineering › Spacecraft Dynamics and Control
  • Physical Sciences › Engineering › Aerospace Engineering › Satellite Communication Systems
Keywords
in-orbit verification, task decomposition, orbit prediction, track planning, energy prediction, solution space exploration, Earth observation

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.