Virtual reality-integrated workflow in BIM-enabled projects collaboration and design review: a case study
Open accessThe DOI matches its Crossref record; 22 of the 22 references it cites were found in a registry or an index.
Abstract
Introduction: A successful project delivery based on building information modeling (BIM) methods is interdependent on an efficient collaboration. This relies mainly on the visualization of a BIM model, which can appear on different mediums. Visualization on mediums such as computer screens, lack some degrees of immersion which may prevent the full utilization of the model. Another problem with conventional collaboration methods such as BIM-Big room, is the need of physical presence of participants in a room. Virtual Reality as the most immersive medium for visualizing a model, has the promise to become a regular part of construction industry. The virtual presence of collaborators in a VR environment, eliminates the need of their physical presence. Simulation of on-site task can address a number of issues during construction, such as feasibility of operations. As consumer VR tools have recently been available in the market, little research has been done on their actual employment in architecture, engineering and construction (AEC) practices. Case description: This paper investigates the application of a VR based workflow in a real project. The authors collaborated with a software company to evaluate some of their advanced VR software features, such as simulation of an on-site task. A case study of VR integrated collaboration workflow serves as an example of how firms can overcome the challenge of benefiting this new technology. A group of AEC professionals involved in a project were invited to take part in the experiment, utilizing their actual project BIM models. Discussion and evaluation: The results of the feedbacks from the experiment confirmed the supposed benefits of a VR collaboration method. Although the participants of the study were from a wide range of disciplines, they could find benefits of the technology in their practice. It also resulted that an experimental method of clash detection via simulation, could actually be practical. Conclusion: The simulation of on-site tasks and perception of architectural spaces in a 1:1 scale are assets unique to VR application in AEC practices. Nevertheless, the study shows the investment in new hardware and software, and resistant against adoption of new technologies are main obstacles of its wide adoption. Further works in computer industry is required to make these technologies more affordable.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1984) · Cited by 81,983
Case study research: design and methods
Phelan, S. (2011) · Evaluation & Research in Education · doi:10.1080/09500790.2011.582317 · Cited by 21,763
Designing qualitative research
(1989) · Choice Reviews Online · doi:10.5860/choice.27-1232 · Cited by 9,905
Designing Qualitative Research
McQuarrie, E. F., Marshall, C., & Rossman, G. B. (1990) · Journal of Marketing Research · doi:10.2307/3172595 · Cited by 6,059 · cited 2×
“These were the main sources of the case study evidence; However, we should be aware that a complete list of sources can be quite extensive-including films, photographs, and videotapes; projective techniques and psychological testing; proxemics; kinesics; “street” ethnography; and life histories (Marshall and Rossman 1…”
BackgroundEastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
A theoretical framework of a BIM-based multi-disciplinary collaboration platform
Singh, V., Gu, N., & Wang, X. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.09.011 · Cited by 625
Building Information Modeling (BIM) partnering framework for public construction projects
Porwal, A., & Hewage, K. N. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.004 · Cited by 482
Understanding effects of BIM on collaborative design and construction: An empirical study in China
Liu, Y., van Nederveen, S., & Hertogh, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.007 · Cited by 411
Visualisation in architecture, engineering and construction (AEC)
Bouchlaghem, D., Shang, H., Whyte, J., & Ganah, A. (2005) · Automation in Construction · doi:10.1016/j.autcon.2004.08.012 · Cited by 262
Characteristics of Head-Mounted Displays and Their Effects on Simulator Sickness
Moss, J. D., & Muth, E. R. (2011) · Human Factors: The Journal of the Human Factors and Ergonomics Society · doi:10.1177/0018720811405196 · Cited by 241
Modelling multiple views on buildings
van Nederveen, G. A., & Tolman, F. P. (1992) · Automation in Construction · doi:10.1016/0926-5805(92)90014-b · Cited by 223
Sociotechnical Systems Approach to BIM Implementation in a Multidisciplinary Construction Context
Sackey, E., Tuuli, M. M., & Dainty, A. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000303 · Cited by 196
Owen, M. R., Grant, L., Facer, K., & Sayers, S. (2005) · Bristol Research (University of Bristol) · Cited by 188
Zucker, P., & Rasmussen, S. E. (1961) · Journal of Aesthetics and Art Criticism · doi:10.2307/428088 · Cited by 185
Virtual Reality and the Built Environment
Whyte, J. K., & Whyte, J. K. (2007) · Routledge eBooks · doi:10.4324/9780080520667 · Cited by 153
Two design patterns for facilitating Building Information Model-based synchronous collaboration
Isikdag, U., & Underwood, J. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.11.006 · Cited by 121
Virtual Reality and the Built Environment
Whyte, J. K. (2003) · PRESENCE Virtual and Augmented Reality · doi:10.1162/105474603322761333 · Cited by 114 · cited 2×
“It is interactive (users can interact with models), spatial (models are represented in three spatial dimensions), and real-time (feedback from actions is given without noticeable pause) (Whyte 2002).”
BackgroundRasmussen, S. E. (1974) · Cited by 96
Implementing lean in construction : lean construction and BIM
Dave, B. A., Koskela, L., Kiviniemi, A., Tzortzopoulos, P., & Owen, R. (2013) · University of Huddersfield Repository (University of Huddersfield) · Cited by 87
Virtual reality-based cloud BIM platform for integrated AEC projects
Goulding, J. S., Rahimian, F. P., & Wang, X. (2014) · TeesRep (Teesside University) · Cited by 76
Social BIM: Co-creation with shared situational awareness
Adamu, Z. A., Emmitt, S., & Soetanto, R. (2015) · Research Open (London South Bank University) · Cited by 60
Rahimian, F. P., Arciszewski, T., & Goulding, J. S. (2014) · Visualization in Engineering · doi:10.1186/2213-7459-2-4 · Cited by 57
Cited by
City Digital Twin Potentials: A Review and Research Agenda
Shahat, E., Hyun, C. T., & Yeom, C. (2021) · Sustainability · doi:10.3390/su13063386 · Cited by 460
Schiavi, B., Havard, V., Beddiar, K., & Baudry, D. (2022) · Automation in Construction · doi:10.1016/j.autcon.2021.104054 · Cited by 205
Safikhani, S., Keller, S., Schweiger, G., & Pirker, J. (2022) · International Journal of Digital Earth · doi:10.1080/17538947.2022.2038291 · Cited by 176
“Zhang et al. (2020) present a mixed quantitative-qualitative review on VR applications in AEC.”
BackgroundElghaish, F., Matarneh, S., Talebi, S., Kagioglou, M., Hosseini, M. R., & Abrishami, S. (2021) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-06-2020-0077 · Cited by 158
Prebanić, K. R., & Vukomanović, M. (2021) · Sustainability · doi:10.3390/su132212690 · Cited by 93
Metadata
- Authors
- Zaker, R., & Coloma, E.
- Venue
- Visualization in Engineering
- Published
- 2018-09-27
- Volume
- 6
- Issue
- 1
- ISSN
- 2213-7459 (ISSN-L)
- OpenAlex
- W2893435307
- Cited by
- 195
- References
- 22
- FWCI
- 10.95
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.