Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 390

The DOI matches its Crossref record; 52 of the 52 references it cites were found in a registry or an index.

Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty

Sommer, Svenja C., Loch, Christoph H.·2004·Management Science

Abstract

Companies innovating in dynamic environments face the combined challenge of unforeseeable uncertainty (the inability to recognize the relevant influence variables and their functional relationships; thus, events and actions cannot be planned ahead of time) and high complexity (large number of variables and interactions; this leads to difficulty in assessing optimal actions beforehand). There are two fundamental strategies to manage innovation with unforeseeable uncertainty and complexity: trial and error learning and selectionism. Trial and error learning involves a flexible (unplanned) adjustment of the considered actions and targets to new information about the relevant environment as it emerges. Selectionism involves pursuing several approaches independently of one another and picking the best one ex post. Neither strategy nor project management literatures have compared the relative advantages of the two approaches in the presence of unforeseeable uncertainty and complexity. We build a model of a complex project with unforeseeable uncertainty, simulating problem solving as a local search on a rugged landscape. We compare the project payoff performance under trial and error learning and selectionism, based on a priori identifiable project characteristics: whether unforeseeable uncertainty is present, how high the complexity is, and how much trial and error learning and parallel trials cost. We find that if unforeseeable uncertainty is present and the team cannot run trials in a realistic user environment (indicating the project's true market performance), trial and error learning is preferred over selectionism. Moreover, the presence of unforeseeable uncertainty can reverse an established result from computational optimization: Without unforeseeable uncertainty, the optimal number of parallel trials increases in complexity. But with unforeseeable uncertainty, the optimal number of trials might decrease because the unforeseeable factors make the trials less and less informative as complexity grows.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1287/mnsc.1040.0274

Cites

52 of 52 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 52 references

Cited by

See all 390

Metadata

Authors
Sommer, S. C., & Loch, C. H.
Venue
Management Science
Published
2004-10
Volume
50
Issue
10
Pages
1334-1347
ISSN
  • 0025-1909 (ISSN-L)
  • 1526-5501
OpenAlex
W2105407474
Cited by
390
References
52
FWCI
14.51
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty. https://app.cochat.ai/papers/10.1287/mnsc.1040.0274
The paper
Sommer, S. C., & Loch, C. H. (2004). Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty. Management Science. https://doi.org/10.1287/mnsc.1040.0274

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.