The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
Abstract
Mixed-model assembly lines are used to produce many different products without carrying large inventories. The effective utilization of these lines requires that a schedule for assembling the different products be determined. For Just-In-Time (JIT) production systems, which require producing only the necessary products in the necessary quantities at the necessary times, the objective is to keep a constant rate of usage of all parts used by the line. This is called levelling or balancing the schedule. This paper develops a theoretical basis for scheduling these systems, and presents new scheduling algorithms and heuristics.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Mixed Model Line Balancing with Smoothed Station Assignments
Thomopoulos, N. T. (1970) · Management Science · doi:10.1287/mnsc.16.9.593 · Cited by 237
Cited by
Assembly system design and operations for product variety
Hu, S. J., Ko, J., Weyand, L., ElMaraghy, H. A., Lien, T. K., Koren, Y., Bley, H., Chryssolouris, G., Nasr, N., & Shpitalni, M. (2011) · CIRP Annals · doi:10.1016/j.cirp.2011.05.004 · Cited by 511
Is production and operations management a discipline? A citation/co‐citation study
Pilkington, A., & Liston‐Heyes, C. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910244188 · Cited by 188
Metadata
- Authors
- Miltenburg, J.
- Venue
- Management Science
- Published
- 1989-02
- Volume
- 35
- Issue
- 2
- Pages
- 192-207
- ISSN
- 0025-1909 (ISSN-L)
- 1526-5501
- OpenAlex
- W2099796355
- Cited by
- 440
- References
- 1
- FWCI
- 36.57
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.