The DOI matches its Crossref record.
Optimal Timing of Reviews in Concurrent Design for Manufacturability
Abstract
Concurrent design can reduce the time required to develop new products and redesign old ones. In contrast to the conventional approach, in which the product design is (nearly) completed before it is “thrown over the wall” to the process design group, concurrent design for manufacturability, as conceptualized here, conducts a number of progress reviews during the product design process. Frequent reviews have two benefits: (1) (Parallel Development) process designers receive sufficient information about the design to enable them to work in parallel with the product designers, and (2) (Quality Control) flaws in the design are discovered soon after they are introduced, saving the time and resources required for redesign later. The disadvantage of frequent reviews is that each review requires setup/penalty time that otherwise would not be required. The optimal policy is derived for some special stationary cases of the model. When the parallel development benefit dominates, the review periods either increase or decrease according to the rate at which product design work empowers useful process design work to be conducted. When the quality control benefit dominates, the review periods will vary only to the extent that the quality related parameters change. Numerical examples illustrate the insights gained from the analysis.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Product Development Decisions: A Review of the Literature
Krishnan, V., & Ulrich, K. T. (2001) · Management Science · doi:10.1287/mnsc.47.1.1.10668 · Cited by 1,701
Innovation Contests, Open Innovation, and Multiagent Problem Solving
Terwiesch, C., & Xu, Y. (2008) · Management Science · doi:10.1287/mnsc.1080.0884 · Cited by 923
A Model-Based Framework to Overlap Product Development Activities
Krishnan, V., Eppinger, S. D., & Whitney, D. E. (1997) · Management Science · doi:10.1287/mnsc.43.4.437 · Cited by 605
Lin, T.-C., & Huang, C.-C. (2008) · Information & Management · doi:10.1016/j.im.2008.06.004 · Cited by 522
Communication and Uncertainty in Concurrent Engineering
Loch, C. H., & Terwiesch, C. (1998) · Management Science · doi:10.1287/mnsc.44.8.1032 · Cited by 352
Process models in design and development
Wynn, D. C., & Clarkson, P. J. (2018) · Research in Engineering Design · doi:10.1007/s00163-017-0262-7 · Cited by 319
A Simulation-Based Process Model for Managing Complex Design Projects
Cho, S.-H., & Eppinger, S. D. (2005) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.850722 · Cited by 293
Problem–Solving Oscillations in Complex Engineering Projects
Mihm, J., Loch, C., & Huchzermeier, A. (2003) · Management Science · doi:10.1287/mnsc.49.6.733.16021 · Cited by 280
Threats to new product manufacturability and the effects of development team integration processes
Swink, M. (1999) · Journal of Operations Management · doi:10.1016/s0272-6963(99)00027-3 · Cited by 272
Faster, better, cheaper: A study of NPD project efficiency and performance tradeoffs
Swink, M., Talluri, S., & Pandejpong, T. (2006) · Journal of Operations Management · doi:10.1016/j.jom.2005.09.004 · Cited by 265
Parallel and Sequential Testing of Design Alternatives
Loch, C. H., Terwiesch, C., & Thomke, S. (2001) · Management Science · doi:10.1287/mnsc.47.5.663.10480 · Cited by 252
Lean product development and lean manufacturing: Testing moderation effects
Marodin, G., Frank, A. G., Tortorella, G. L., & Netland, T. (2018) · International Journal of Production Economics · doi:10.1016/j.ijpe.2018.07.009 · Cited by 139
How Peripheral Developers Contribute to Open-Source Software Development
Setia, P., Rajagopalan, B., Sambamurthy, V., & Calantone, R. (2012) · Information Systems Research · doi:10.1287/isre.1100.0311 · Cited by 110
Metadata
- Authors
- Ha, A. Y., & Porteus, E. L.
- Venue
- Management Science
- Published
- 1995-09
- Volume
- 41
- Issue
- 9
- Pages
- 1431-1447
- ISSN
- 0025-1909 (ISSN-L)
- 1526-5501
- OpenAlex
- W1981198144
- Cited by
- 193
- References
- 0
- FWCI
- 9.86
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.