The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Eliciting von Neumann-Morgenstern Utilities When Probabilities Are Distorted or Unknown
Open accessAbstract
This paper proposes a new method, the (gamble-)tradeoff method, for eliciting utilities in decision under risk or uncertainty. The elicitation of utilities, to be used in the expected utility criterion, turns out to be possible even if probabilities are ambiguous or unknown. A disadvantage of the tradeoff method is that a few more questions usually must be asked to clients. Also, the lotteries that are needed are somewhat more complex than in the certainty-equivalent method or in the probability-equivalent method. The major advantage of the tradeoff method is its robustness against probability distortions and misconceptions, which constitute a major cause of violations of expected utility and generate inconsistencies in utility elicitation. Thus the tradeoff method retains full validity under prospect theory, rank-dependent utility, and the combination of the two, i.e., cumulative prospect theory. The tradeoff method is tested for monetary outcomes and for outcomes describing life-duration. We find higher risk aversion for life duration, but the tradeoff method elicits similar curvature of utility. Apparently the higher risk aversion for life duration is due to more pronounced deviations from expected utility.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Advances in prospect theory: Cumulative representation of uncertainty
Tversky, A., & Kahneman, D. (1992) · Journal of Risk and Uncertainty · doi:10.1007/bf00122574 · Cited by 15,467
Cited by
Developments in Non-Expected Utility Theory: The Hunt for a Descriptive Theory of Choice under Risk
Starmer, C. (2000) · Journal of Economic Literature · doi:10.1257/jel.38.2.332 · Cited by 1,899
Parameter-Free Elicitation of Utility and Probability Weighting Functions
Abdellaoui, M. (2000) · Management Science · doi:10.1287/mnsc.46.11.1497.12080 · Cited by 926
Loss Aversion Under Prospect Theory: A Parameter-Free Measurement
Abdellaoui, M., Bleichrodt, H., & Paraschiv, C. (2007) · Management Science · doi:10.1287/mnsc.1070.0711 · Cited by 783
A Parameter-Free Elicitation of the Probability Weighting Function in Medical Decision Analysis
Bleichrodt, H., & Pinto, J. L. (2000) · Management Science · doi:10.1287/mnsc.46.11.1485.12086 · Cited by 483
Ambiguity Made Precise: A Comparative Foundation
Ghirardato, P., & Marinacci, M. (2002) · Journal of Economic Theory · doi:10.1006/jeth.2001.2815 · Cited by 482
Metadata
- Authors
- Wakker, P., & Deneffe, D.
- Venue
- Management Science
- Published
- 1996-08
- Volume
- 42
- Issue
- 8
- Pages
- 1131-1150
- ISSN
- 0025-1909 (ISSN-L)
- 1526-5501
- OpenAlex
- W2128845303
- Cited by
- 491
- References
- 1
- FWCI
- 5.91
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Eliciting von Neumann-Morgenstern Utilities When Probabilities Are Distorted or Unknown. https://app.cochat.ai/papers/10.1287/mnsc.42.8.1131
- The paper
- Wakker, P., & Deneffe, D. (1996). Eliciting von Neumann-Morgenstern Utilities When Probabilities Are Distorted or Unknown. Management Science. https://doi.org/10.1287/mnsc.42.8.1131
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.