The DOI matches its Crossref record; 53 of the 53 references it cites were found in a registry or an index.
On Uncertainty, Ambiguity, and Complexity in Project Management
Abstract
This article develops a model of a project as a payoff function that depends on the state of the world and the choice of a sequence of actions. A causal mapping, which may be incompletely known by the project team, represents the impact of possible actions on the states of the world. An underlying probability space represents available information about the state of the world. Interactions among actions and states of the world determine the complexity of the payoff function. Activities are endogenous, in that they are the result of a policy that maximizes the expected project payoff. A key concept is the adequacy of the available information about states of the world and action effects. We express uncertainty, ambiguity, and complexity in terms of information adequacy. We identify three fundamental project management strategies: instructionism, learning, and selectionism. We show that classic project management methods emphasize adequate information and instructionism, and demonstrate how modern methods fit into the three fundamental strategies. The appropriate strategy is contingent on the type of uncertainty present and the complexity of the project payoff function. Our model establishes a rigorous language that allows the project manager to judge the adequacy of the available project information at the outset, choose an appropriate combination of strategies, and set a supporting project infrastructure—that is, systems for planning, coordination and incentives, and monitoring.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Artificial intelligence: a modern approach
(1995) · Choice Reviews Online · doi:10.5860/choice.33-1577 · Cited by 21,974
The Origins of Order: Self-Organization and Selection in Evolution
Kauffman, S. A. (1993) · doi:10.1093/oso/9780195079517.001.0001 · Cited by 7,855
Hamel, G., & Prahalad, C. K. (1994) · CERN Document Server (European Organization for Nuclear Research) · Cited by 5,747
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
Accelerating Adaptive Processes: Product Innovation in the Global Computer Industry
Eisenhardt, K. M., & Tabrizi, B. N. (1995) · Administrative Science Quarterly · doi:10.2307/2393701 · Cited by 2,426
Wellsprings of knowledge: building and sustaining the sources of innovation
(1996) · Choice Reviews Online · doi:10.5860/choice.33-3996 · Cited by 2,085
The lever of riches: technological creativity and economic progress
(1990) · Choice Reviews Online · doi:10.5860/choice.28-1056 · Cited by 1,884
The design structure system: A method for managing the design of complex systems
Steward, D. V. (1981) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1981.6448589 · Cited by 1,749
Project management — A managerial approach
(1989) · European Journal of Operational Research · doi:10.1016/0377-2217(89)90451-7 · Cited by 1,547
Resource-constrained project scheduling: Notation, classification, models, and methods
Brucker, P., Drexl, A., Möhring, R., Neumann, K., & Pesch, E. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(98)00204-5 · Cited by 1,500
Learning from Samples of One or Fewer
March, J. G., Sproull, L. S., & Tamuz, M. (1991) · Organization Science · doi:10.1287/orsc.2.1.1 · Cited by 1,258
Marschak, J., & Radner, R. (1972) · Medical Entomology and Zoology · Cited by 1,082
Stochastic models in operations research
Heyman, D. P., & Sobel, M. J. (1982) · Medical Entomology and Zoology · Cited by 1,041
Learning and executing generalized robot plans
Fikes, R. E., Hart, P. E., & Nilsson, N. J. (1972) · Artificial Intelligence · doi:10.1016/0004-3702(72)90051-3 · Cited by 1,019
The need for new paradigms for complex projects
Williams, T. M. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00047-7 · Cited by 930
Marketing and Discontinuous Innovation: The Probe and Learn Process
Lynn, G. S., Morone, J. G., & Paulson, A. S. (1996) · California Management Review · doi:10.2307/41165841 · Cited by 915
Discontinuous Innovation and the New Product Development Process
Veryzer, R. W. (1998) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(97)00105-7 · Cited by 860
Schwartz, P. (1991) · Cited by 852
Portfolio approach to information systems
McFarlan, F. W. (1989) · IEEE Press eBooks · Cited by 771
Origins of Genius: Darwinian Perspectives on Creativity
Simonton, D. K. (1999) · doi:10.1093/oso/9780195128796.001.0001 · Cited by 639
Tatikonda, M. V., & Rosenthal, S. R. (2000) · IEEE Transactions on Engineering Management · doi:10.1109/17.820727 · Cited by 634
Toyota's Principles of Set-Based Concurrent Engineering
Sobek, D. K., Ward, A. C., & Liker, J. Κ. (1999) · Sloan management review · Cited by 632
Toward a typological theory of project management
Shenhar, A. J., & Dvir, D. (1996) · Research Policy · doi:10.1016/0048-7333(95)00877-2 · Cited by 614
Third‐Generation New Product Processes
Cooper, R. G. (1994) · Journal of Product Innovation Management · doi:10.1111/1540-5885.1110003 · Cited by 554
Managing Experimentation in the Design of New Products
Thomke, S. H. (1998) · Management Science · doi:10.1287/mnsc.44.6.743 · Cited by 545
Origins of genius : Darwinian perspectives on creativity
Simonton, D. K. (1999) · Cited by 539
A survey of algorithmic methods for partially observed Markov decision processes
Lovejoy, W. S. (1991) · Annals of Operations Research · doi:10.1007/bf02055574 · Cited by 532
Perspective third-generation new product processes
Cooper, R. (1994) · Journal of Product Innovation Management · doi:10.1016/0737-6782(94)90115-5 · Cited by 515
Managing project uncertainty: from variation to chaos
De Meyer, A., Loch, C. H., & Pich, M. T. (2002) · IEEE Engineering Management Review · doi:10.1109/emr.2002.1032403 · Cited by 464
Self-citationEdelman, G. M. (2000) · Medical Entomology and Zoology · Cited by 462
In search of project classification: a non-universal approach to project success factors
Dvir, D., Lipovetsky, S., Shenhar, A., & Tishler, A. (1998) · Research Policy · doi:10.1016/s0048-7333(98)00085-7 · Cited by 423
A Predictive Model of Sequential Iteration in Engineering Design
Smith, R. P., & Eppinger, S. D. (1997) · Management Science · doi:10.1287/mnsc.43.8.1104 · Cited by 412
Darwin machines and the nature of knowledge
(1994) · Choice Reviews Online · doi:10.5860/choice.32-2092 · Cited by 410
Behavior in escalation situations: Antecedents, prototypes, and solutions.
Staw, B. M., & Ross, J. (1987) · Research in Organizational Behavior · Cited by 364
Agile Product Development: Managing Development Flexibility in Uncertain Environments
Thomke, S., & Reinertsen, D. (1998) · California Management Review · doi:10.2307/41165973 · Cited by 333
Morris, P. W. G., & Hough, G. (1987) · UCL Discovery (University College London) · Cited by 300
The nature of market visioning for technology-based radical innovation
O’Connor, G. C., & Veryzer, R. W. (2001) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(01)00092-3 · Cited by 263
Parallel and Sequential Testing of Design Alternatives
Loch, C. H., Terwiesch, C., & Thomke, S. (2001) · Management Science · doi:10.1287/mnsc.47.5.663.10480 · Cited by 252
Self-citationChoice over uncertainty and ambiguity in technical problem solving
Schrader, S., Riggs, W. M., & Smith, R. P. (1993) · Journal of Engineering and Technology Management · doi:10.1016/0923-4748(93)90059-r · Cited by 246
Integrating planning, execution and monitoring
Ambros‐Ingerson, J., & Steel, S. (1988) · National Conference on Artificial Intelligence · Cited by 227
Managing New Product Definition in Highly Dynamic Environments
Bhattacharya, S., Krishnan, V., & Mahajan, V. (1998) · Management Science · doi:10.1287/mnsc.44.11.s50 · Cited by 225
Integrated Product Design for Marketability and Manufacturing
Srinivasan, V., Lovejoy, W. S., & Beach, D. (1997) · Journal of Marketing Research · doi:10.2307/3152072 · Cited by 209
A classified bibliography of recent research relating to project risk management
Williams, T. (1995) · European Journal of Operational Research · doi:10.1016/0377-2217(93)e0363-3 · Cited by 200
Learning, Change, and Evolution: An Enquiry into the Teleonomy of Learning
Plotkin, H. C., & Odling-Smee, F. J. (1979) · Advances in the Study of Behavior · doi:10.1016/s0065-3454(08)60092-3 · Cited by 195
Planned Flexibility: Linking Anticipation and Reaction in Product Development Projects
Verganti, R. (1999) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(98)00067-8 · Cited by 193
GERT - Graphical Evaluation and Review Technique
Pritsker, A. A. B. (1966) · NASA Technical Reports Server (NASA) · Cited by 161
On the Edge: Heeding the Warnings of Unusual Events
Marcus, A. A., & Nichols, M. L. (1999) · Organization Science · doi:10.1287/orsc.10.4.482 · Cited by 158
Parkinson's Law and Its Implications for Project Management
Gutierrez, G. G., & Kouvelis, P. (1991) · Management Science · doi:10.1287/mnsc.37.8.990 · Cited by 104
A risk engineering approach to project risk management
Chapman, C. B. (1990) · International Journal of Project Management · doi:10.1016/0263-7863(90)90003-t · Cited by 63
A Computational Study on Bounding the Makespan Distribution in Stochastic Project Networks
Ludwig, A., Möhring, R. H., & Stork, F. (2001) · Annals of Operations Research · doi:10.1023/a:1010945830113 · Cited by 62
Effective risk management : some keys to success
Conrow, E. H. (2000) · American Institute of Aeronautics and Astronautics eBooks · Cited by 58
Crow, J. F. (2001) · Nature · doi:10.1038/35057409 · Cited by 39
Effective Risk Management—Some Keys to Success
Pohlmann, L. D. (2001) · Insight · doi:10.1002/inst.20014349a · Cited by 31
Cited by
The Misalignment of Product Architecture and Organizational Structure in Complex Product Development
Sosa, M. E., Eppinger, S. D., & Rowles, C. M. (2004) · Management Science · doi:10.1287/mnsc.1040.0289 · Cited by 656
Mir, F. A., & Pinnington, A. H. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.05.012 · Cited by 602
Now, let's make it really complex (complicated): A systematic review of the complexities of projects
Geraldi, J., Maylor, H., & Williams, T. (2011) · International Journal of Operations & Production Management · doi:10.1108/01443571111165848 · Cited by 559
Williams, T. (2005) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.856572 · Cited by 456
Do project managers practice what they preach, and does it matter to project success?
Papke-Shields, K. E., Beise, C., & Quan, J. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.11.002 · Cited by 393
Metadata
- Authors
- Pich, M. T., Loch, C. H., & Meyer, A. D.
- Venue
- Management Science
- Published
- 2002-08
- Volume
- 48
- Issue
- 8
- Pages
- 1008-1023
- ISSN
- 0025-1909 (ISSN-L)
- 1526-5501
- OpenAlex
- W2064671882
- Cited by
- 942
- References
- 53
- FWCI
- 16.78
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.