Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 456

The DOI matches its Crossref record; 57 of the 57 references it cites were found in a registry or an index.

Assessing and Moving on From the Dominant Project Management Discourse in the Light of Project Overruns

Williams, T. · 2005 · IEEE Transactions on Engineering Management

Abstract

There has been much prescriptive work in project management, exemplified in various "Bodies of Knowledge". However, experience shows some projects overspending considerably. Recently, systemic modeling research into the behavior of large projects explains project oversponds by "systemic" effects and the (sometimes counterintuitive) effect of management actions. However, while this work is becoming more widely known, embedding the lessons in project-management practice is not straightforward. The current prescriptive dominant discourse of project management contains implicit underlying assumptions with which the systemic modeling work clashes, indeed showing how conventional methods can exacerbate rather than alleviate project problems. Exploration of this modeling suggests that for projects that are complex, uncertain, and time-limited, conventional methods might be inappropriate, and aspects of newer methodologies in which the project "emerges" rather than being fully preplanned might be more appropriate. Some of the current literature on project-classification schemes also suggests similar parameters, without the rationale that the systemic modeling provides, thus providing useful backup to this analysis. The eventual aim of this line of work is to enable project managers to choose effective ways to manage projects based on understanding and model-based theory.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1109/tem.2005.856572

Cites

57 of 57 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 57 references

Research works printed but not linked: 64

  1. 2000, Project Management Inst.
  2. Turner, 1993, McGraw-Hill
  3. Dixon, 2000, Assoc. Project Management
  4. Stevens, 2002, Project Management Pathways
  5. Johnson, 2002, The Pathways Concepts and BOK, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
  6. Holton, 2002, Project Management, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
  7. Cleland, 1983, Van Nostrand
  8. Lundin, 2000, Kluwer
  9. Lundin, 1998, Kluwer
  10. Sahlin-Andersson, 2002, Copenhagen Bus. School Press
  11. 10.1111/1467-6486.00198 · doi:10.1111/1467-6486.00198
  12. Harrison, 1972, How to describe your organization, Harv. Bus. Rev., 5, 119
  13. 10.1111/j.1467-8551.1991.tb00021.x · doi:10.1111/j.1467-8551.1991.tb00021.x
  14. 1986, National Audit Office, HMSO, London, U.K.
  15. 10.1002/1520-6750(198806)35:3<367::AID-NAV3220350306>3.0.CO;2-D · doi:10.1002/1520-6750(198806)35:3<367::aid-nav3220350306>3.0.co;2-d
  16. Koskela, The underlying theory of project management is obsolete, 293
  17. 10.1177/875697280003100403 · doi:10.1177/875697280003100403
  18. Williams, 2003, Structuring a disruption and delay claim, Eur. J. Opl. Res., 148, 192, 10.1016/S0377-2217(02)00372-7 · doi:10.1016/s0377-2217(02)00372-7
  19. 10.1002/(SICI)1099-1727(199622)12:2<121::AID-SDR99>3.0.CO;2-X · doi:10.1002/(sici)1099-1727(199622)12:2<121::aid-sdr99>3.0.co;2-x
  20. 10.1061/(ASCE)0733-9364(1987)113:3(488) · doi:10.1061/(asce)0733-9364(1987)113:3(488
  21. Cooper, 1993, The rework cycle: Benchmarks for the project manager, Proj. Manage. J., 20, 17
  22. 10.1002/sdr.213 · doi:10.1002/sdr.213
  23. Eden, 2004, The amoebic growth of project costs, Proj. Manage. J.
  24. Eden, 2000, On the nature of disruption and delay (D&D) in major projects, J. Opl. Res. Soc., 51, 291, 10.1057/palgrave.jors.2600919 · doi:10.1057/palgrave.jors.2600919
  25. Stevens, 2002, Project Context, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
  26. Turner, 1999, Editorial. project management: A profession based on knowledge or faith?, Int. J. Proj. Mgmt., 17, 329
  27. 1999, Project Manage. Inst.
  28. 10.1016/0956-5221(95)00033-R · doi:10.1016/0956-5221(95)00033-r
  29. Bredillet, Beyond the positivist mirror: Toward a project management ‘gnosis’, 70
  30. 10.1016/S0925-5273(97)00091-1 · doi:10.1016/s0925-5273(97)00091-1
  31. Koskela, The theory of project management: Explanation to novel methods
  32. Remington, Illusions of control: Philosophical foundations for project management, 563
  33. Hampden-Turner, 1993, The Seven Cultures of Capitalism
  34. Stefanou, Research program overview
  35. Fleming, 2000, Earned Value Project Management
  36. Pritchard, 2001, Risk Management: Concepts and Guidance
  37. 10.1680/cien.2002.150.2.82 · doi:10.1680/cien.2002.150.2.82
  38. 10.1016/S0263-7863(01)00050-3 · doi:10.1016/s0263-7863(01)00050-3
  39. Malgrati, Rethinking the new project management framework: New epistemology, new insights, 371
  40. Thomas, Living in the white spaces between the lines: Exploring the use of gendered logic systems in project managers’ discourse, 620
  41. 10.1037/0033-2909.108.2.233 · doi:10.1037/0033-2909.108.2.233 · Paper page
  42. Bredillet, Understanding the very nature of project management: A praxiological approach
  43. Obeng, 1996, Financial Times Manage.
  44. Milosevic, 2003, Project Management Toolbox: Tools and Techniques for the Practicing Project Manager
  45. Archer, Project management in network organizations
  46. Crawford, Project categorization systems and their use in organizations: An empirical study
  47. Davey, 2002, Risk Management, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
  48. Williams, 1997, Project risk: Systemicity, cause mapping and a scenario approach, 343
  49. Thompson, 1967, Organizations in Action
  50. Ulri, 2000, Le management de projets et ses evolution en Amerique du Nord, Revue Francaise de Gestion, 129, 21
  51. Lock, 2002, Change Control, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
  52. Engwall, 2002, The futile dream of the perfect goal, 261
  53. 10.1016/0024-6301(79)90070-0 · doi:10.1016/0024-6301(79)90070-0
  54. Ashton, 1990, Shop floor control in a system job shop: Definitely not MRP, Prod. Inv. Manage. J., 31, 27
  55. Brown, A cure that harms? The enactment of project management on IS projects
  56. Molin, Divided loyalties in project management
  57. Udo, Will agile development change the way we manage software projects? AGILE from a PMBOK guide perspective
  58. Charette, 2003, Challenging the fundamental notions of software development, 4
  59. 10.1016/S0263-7863(98)00005-2 · doi:10.1016/s0263-7863(98)00005-2
  60. Andersen, 1995, Goal Directed Project Management
  61. Thomas, On learning and control—Competing paradigms or co-existing requirements for managing projects in ambiguous situations?
  62. Besner, An empirical investigation of project management practice: In reality, which tools do practitioners use?
  63. Pinto, 1998, The elements of project success, 13
  64. Shenhar, Improving PM: Linking success criteria to project type

Cited by

See all 456

Metadata

Authors
Williams, T.
Venue
IEEE Transactions on Engineering Management
Published
2005-11
Volume
52
Issue
4
Pages
497-508
ISSN
0018-9391 (ISSN-L)
OpenAlex
W2167113207
Cited by
456
References
57
FWCI
20.40
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Assessing and Moving on From the Dominant Project Management Discourse in the Light of Project Overruns. https://app.cochat.ai/papers/10.1109/tem.2005.856572
The paper
Williams, T. (2005). Assessing and Moving on From the Dominant Project Management Discourse in the Light of Project Overruns. IEEE Transactions on Engineering Management. https://doi.org/10.1109/tem.2005.856572

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.