The DOI matches its Crossref record; 57 of the 57 references it cites were found in a registry or an index.
Assessing and Moving on From the Dominant Project Management Discourse in the Light of Project Overruns
Abstract
There has been much prescriptive work in project management, exemplified in various "Bodies of Knowledge". However, experience shows some projects overspending considerably. Recently, systemic modeling research into the behavior of large projects explains project oversponds by "systemic" effects and the (sometimes counterintuitive) effect of management actions. However, while this work is becoming more widely known, embedding the lessons in project-management practice is not straightforward. The current prescriptive dominant discourse of project management contains implicit underlying assumptions with which the systemic modeling work clashes, indeed showing how conventional methods can exacerbate rather than alleviate project problems. Exploration of this modeling suggests that for projects that are complex, uncertain, and time-limited, conventional methods might be inappropriate, and aspects of newer methodologies in which the project "emerges" rather than being fully preplanned might be more appropriate. Some of the current literature on project-classification schemes also suggests similar parameters, without the rationale that the systemic modeling provides, thus providing useful backup to this analysis. The eventual aim of this line of work is to enable project managers to choose effective ways to manage projects based on understanding and model-based theory.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Culture's Consequences: Comparing Values, Behaviors, Institutions, and Organizations across Nations
Bhagat, R. S., & Hofstede, G. (2002) · The Academy of Management Review · doi:10.2307/4134391 · Cited by 21,664
Gender and leadership style: A meta-analysis.
Eagly, A. H., & Johnson, B. T. (1990) · Psychological Bulletin · doi:10.1037//0033-2909.108.2.233 · Cited by 2,749
Agile Software Development with SCRUM
Schwaber, K., & Beedle, M. (2001) · Cited by 2,656
Modeling Managerial Behavior: Misperceptions of Feedback in a Dynamic Decision Making Experiment
Sterman, J. D. (1989) · Management Science · doi:10.1287/mnsc.35.3.321 · Cited by 2,500
Megaprojects and Risk: An Anatomy of Ambition
Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003) · Cambridge University Press eBooks · doi:10.1017/cbo9781107050891 · Cited by 2,415
General and Industrial Management
Carter, N. M., & Fayol, H. (1986) · The Academy of Management Review · doi:10.2307/258475 · Cited by 2,241
The Case for Qualitative Research
Morgan, G., & Smircich, L. (1980) · The Academy of Management Review · doi:10.2307/257453 · Cited by 1,850
Organizational Culture and Marketing: Defining the Research Agenda
Deshpande, R., & Webster, F. E. (1989) · Journal of Marketing · doi:10.1177/002224298905300102 · Cited by 1,803
Measuring and Assessing Organizations.
Price, J. L., de Ven, A. H. V., & Ferry, D. L. (1981) · Administrative Science Quarterly · doi:10.2307/2392488 · Cited by 1,648
(1998) · Springer eBooks · doi:10.1007/978-1-4615-5529-2 · Cited by 1,235
Research works printed but not linked: 64
- 2000, Project Management Inst.
- Turner, 1993, McGraw-Hill
- Dixon, 2000, Assoc. Project Management
- Stevens, 2002, Project Management Pathways
- Johnson, 2002, The Pathways Concepts and BOK, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
- Holton, 2002, Project Management, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
- Cleland, 1983, Van Nostrand
- Lundin, 2000, Kluwer
- Lundin, 1998, Kluwer
- Sahlin-Andersson, 2002, Copenhagen Bus. School Press
- 10.1111/1467-6486.00198 · doi:10.1111/1467-6486.00198
- Harrison, 1972, How to describe your organization, Harv. Bus. Rev., 5, 119
- 10.1111/j.1467-8551.1991.tb00021.x · doi:10.1111/j.1467-8551.1991.tb00021.x
- 1986, National Audit Office, HMSO, London, U.K.
- 10.1002/1520-6750(198806)35:3<367::AID-NAV3220350306>3.0.CO;2-D · doi:10.1002/1520-6750(198806)35:3<367::aid-nav3220350306>3.0.co;2-d
- Koskela, The underlying theory of project management is obsolete, 293
- 10.1177/875697280003100403 · doi:10.1177/875697280003100403
- Williams, 2003, Structuring a disruption and delay claim, Eur. J. Opl. Res., 148, 192, 10.1016/S0377-2217(02)00372-7 · doi:10.1016/s0377-2217(02)00372-7
- 10.1002/(SICI)1099-1727(199622)12:2<121::AID-SDR99>3.0.CO;2-X · doi:10.1002/(sici)1099-1727(199622)12:2<121::aid-sdr99>3.0.co;2-x
- 10.1061/(ASCE)0733-9364(1987)113:3(488) · doi:10.1061/(asce)0733-9364(1987)113:3(488
- Cooper, 1993, The rework cycle: Benchmarks for the project manager, Proj. Manage. J., 20, 17
- 10.1002/sdr.213 · doi:10.1002/sdr.213
- Eden, 2004, The amoebic growth of project costs, Proj. Manage. J.
- Eden, 2000, On the nature of disruption and delay (D&D) in major projects, J. Opl. Res. Soc., 51, 291, 10.1057/palgrave.jors.2600919 · doi:10.1057/palgrave.jors.2600919
- Stevens, 2002, Project Context, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
- Turner, 1999, Editorial. project management: A profession based on knowledge or faith?, Int. J. Proj. Mgmt., 17, 329
- 1999, Project Manage. Inst.
- 10.1016/0956-5221(95)00033-R · doi:10.1016/0956-5221(95)00033-r
- Bredillet, Beyond the positivist mirror: Toward a project management ‘gnosis’, 70
- 10.1016/S0925-5273(97)00091-1 · doi:10.1016/s0925-5273(97)00091-1
- Koskela, The theory of project management: Explanation to novel methods
- Remington, Illusions of control: Philosophical foundations for project management, 563
- Hampden-Turner, 1993, The Seven Cultures of Capitalism
- Stefanou, Research program overview
- Fleming, 2000, Earned Value Project Management
- Pritchard, 2001, Risk Management: Concepts and Guidance
- 10.1680/cien.2002.150.2.82 · doi:10.1680/cien.2002.150.2.82
- 10.1016/S0263-7863(01)00050-3 · doi:10.1016/s0263-7863(01)00050-3
- Malgrati, Rethinking the new project management framework: New epistemology, new insights, 371
- Thomas, Living in the white spaces between the lines: Exploring the use of gendered logic systems in project managers’ discourse, 620
- 10.1037/0033-2909.108.2.233 · doi:10.1037/0033-2909.108.2.233 · Paper page
- Bredillet, Understanding the very nature of project management: A praxiological approach
- Obeng, 1996, Financial Times Manage.
- Milosevic, 2003, Project Management Toolbox: Tools and Techniques for the Practicing Project Manager
- Archer, Project management in network organizations
- Crawford, Project categorization systems and their use in organizations: An empirical study
- Davey, 2002, Risk Management, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
- Williams, 1997, Project risk: Systemicity, cause mapping and a scenario approach, 343
- Thompson, 1967, Organizations in Action
- Ulri, 2000, Le management de projets et ses evolution en Amerique du Nord, Revue Francaise de Gestion, 129, 21
- Lock, 2002, Change Control, in M. Stevens, Project Management Pathways, High Wycombe, U.K.: Assoc. Project Management
- Engwall, 2002, The futile dream of the perfect goal, 261
- 10.1016/0024-6301(79)90070-0 · doi:10.1016/0024-6301(79)90070-0
- Ashton, 1990, Shop floor control in a system job shop: Definitely not MRP, Prod. Inv. Manage. J., 31, 27
- Brown, A cure that harms? The enactment of project management on IS projects
- Molin, Divided loyalties in project management
- Udo, Will agile development change the way we manage software projects? AGILE from a PMBOK guide perspective
- Charette, 2003, Challenging the fundamental notions of software development, 4
- 10.1016/S0263-7863(98)00005-2 · doi:10.1016/s0263-7863(98)00005-2
- Andersen, 1995, Goal Directed Project Management
- Thomas, On learning and control—Competing paradigms or co-existing requirements for managing projects in ambiguous situations?
- Besner, An empirical investigation of project management practice: In reality, which tools do practitioners use?
- Pinto, 1998, The elements of project success, 13
- Shenhar, Improving PM: Linking success criteria to project type
Cited by
Rethinking Project Management: Researching the actuality of projects
Cicmil, S., Williams, T., Thomas, J., & Hodgson, D. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.08.006 · Cited by 678
Self-citationNow, let's make it really complex (complicated): A systematic review of the complexities of projects
Geraldi, J., Maylor, H., & Williams, T. (2011) · International Journal of Operations & Production Management · doi:10.1108/01443571111165848 · Cited by 559
Self-citationBosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.07.008 · Cited by 471
Preparing project managers to deal with complexity – Advanced project management education
Thomas, J., & Mengel, T. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.01.001 · Cited by 471
Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation
Söderlund, J. (2011) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2010.00290.x · Cited by 352
Metadata
- Authors
- Williams, T.
- Venue
- IEEE Transactions on Engineering Management
- Published
- 2005-11
- Volume
- 52
- Issue
- 4
- Pages
- 497-508
- ISSN
- 0018-9391 (ISSN-L)
- OpenAlex
- W2167113207
- Cited by
- 456
- References
- 57
- FWCI
- 20.40
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Assessing and Moving on From the Dominant Project Management Discourse in the Light of Project Overruns. https://app.cochat.ai/papers/10.1109/tem.2005.856572
- The paper
- Williams, T. (2005). Assessing and Moving on From the Dominant Project Management Discourse in the Light of Project Overruns. IEEE Transactions on Engineering Management. https://doi.org/10.1109/tem.2005.856572
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.