Cited by 15Quality and Supply ManagementAssembly Line Balancing OptimizationManagement and Optimization Techniques

Lean methodologies to improve assembly line efficiency: an industrial application

Kanaganayagam, Kaneesa, Muthuswamy, Shanthi, Damodaran, Purushothaman·2015·International Journal of Industrial and Systems Engineering

Abstract

Similar to automobile industries, the large earth moving equipment (LEME) industries have a dominant assembly line layout. Improving the assembly line efficiency would improve the productivity of the line. This paper focuses on using lean tools such as time and motion study, kaizen events and spaghetti map to reduce waste in a LEME assembly line. For this research, five zones (or work areas) of assembly were studied and using the lean tools the cycle time was reduced to achieve a 15% reduction in takt time. There were four phases to this research effort: data collection, construction of the process flow map, creation of the spaghetti map, and the implementation of kaizen events. The results from this research demonstrate that waste in an assembly can be identified and removed by studying the process and utilising simple yet powerful lean tools.

Integrity signals

Registry

Crossref · 10.1504/ijise.2015.069000

Cites

Statistics

Recomputing p-values needs the paper’s full text.

Claims the paper makes

This paper’s full text isn’t openly available, so its claims and self-check weren’t run. The registry and citation checks still apply.

Cited by

Sorted by citations

Authors
Kanaganayagam, K., Muthuswamy, S., & Damodaran, P.
Affiliations
Northern Illinois University (US)
Venue
International Journal of Industrial and Systems Engineering
Published
2015
Volume
20
Issue
1
Pages
104
ISSN
  • 1748-5037 (ISSN-L)
  • 1748-5045
OpenAlex
W2009169266
Cited by
15
References
0
Citations by year
2025: 1 · 2024: 2 · 2023: 2 · 2022: 4 · 2021: 1 · 2020: 2 · 2019: 2 · 2016: 1
FWCI
0.73
Type
journal article
Language
en
Open access
closed
Locations
  • International Journal of Industrial and Systems Engineering (publishedVersion)
  • RePEc: Research Papers in Economics (submittedVersion)
Topics
  • Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
  • Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Assembly Line Balancing Optimization
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
Keywords
lean manufacturing, assembly line efficiency, waste reduction, cycle time reduction, kaizen events, time and motion study, productivity improvement

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review