The DOI matches its Crossref record.
Lost Roots: How Project Management Came to Emphasize Control over Flexibility and Novelty
Abstract
The discipline of project management (PM) adheres to the dominant model of the project life cycle or phased stage-gate approach to executing projects. This implies a clear definition of mission and system are given at the outset (to reduce uncertainty), and subsequent execution in phases with decision gates. It contrasts with approach applied in the seminal projects that are credited with establishing the foundation of the discipline in the 1940s and 50s. Those projects started out with missions that were beyond the currently possible; any solutions had to emerge over time. They succeeded by a combination of parallel trials (from which the best would then be selected) and trial-and-error iteration (allowing for the modification of solutions pursued over a period of time). Although the success of these approaches was well documented and explained by scientific study in the 1950s, today they seem to fly in the face of accepted professional standards, making managers uncomfortable when they are encountered. The explanation for this contradiction has its roots in the 1960s, when the so-called McNamara revolution at the Department of Defense (DoD) gave a control orientation to the PM discipline. This shift was cemented by the codes and practices of the DoD and NASA, contemporary scientific writing, and the foundation of the Project Management Institute, a professional organization that translated the standard into the educational norm for a generation of project managers. The proj…
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Ironically, however, it seems that project teams spend most of their time on the science structured parts, and only a small portion on the art parts [5].”
From What is Strategic Project Leadership? (2015) · cites this paper as [5]
In the citing paper
“Two influential studies by Williams [4] and Lenfile and Loch [5] have demonstrated specific shortcomings such as, sticking to an operational view based on the triple constraint, or the focus on excessive control of process, while neglecting to deal with uncertainty and change.”
From What is Strategic Project Leadership? (2015) · cites this paper as [5]
Citations
Cited by
What's Next?: After Stage-Gate
Cooper, R. G. (2014) · Research-Technology Management · doi:10.5437/08956308x5606963 · Cited by 474
Svejvig, P., & Andersen, P. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.06.004 · Cited by 324
Denicol, J., Davies, A., & Krystallis, I. (2020) · Project Management Journal · doi:10.1177/8756972819896113 · Cited by 266
Agile–Stage-Gate for Manufacturers
Cooper, R. G., & Sommer, A. F. (2018) · Research-Technology Management · doi:10.1080/08956308.2018.1421380 · Cited by 298
Explicating the dynamics of project capabilities
Davies, A., & Brady, T. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.04.006 · Cited by 265
Metadata
- Authors
- Lenfle, S., & Loch, C.
- Venue
- California Management Review
- Publisher
- SAGE Publications
- Published
- 2010-11
- Volume
- 53
- Issue
- 1
- Pages
- 32-55
- ISSN
- 0008-1256 (ISSN-L)
- 2162-8564
- OpenAlex
- W2054262764
- Cited by
- 348
- References
- 0
- Citations by year
- 2026: 8 · 2025: 15 · 2024: 22 · 2023: 20 · 2022: 25 · 2021: 30 · 2020: 27 · 2019: 27 · 2018: 40 · 2017: 26 · 2016: 25 · 2015: 19 · 2014: 20 · 2013: 22 · 2012: 15
- FWCI
- 18.75
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- journals.sagepub.com/page/policies/text-and-data-mining-license (tdm)
- Locations
- California Management Review (publishedVersion)
- HAL (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Organizational Behavior and Human Resource Management › Management Theory and Practice
- Social Sciences › Business, Management and Accounting › Organizational Behavior and Human Resource Management › Management and Organizational Studies
- Keywords
- project management, control, flexibility, novelty, organizational change
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.