Lost Roots: How Project Management Came to Emphasize Control over Flexibility and Novelty
Abstract
The discipline of project management (PM) adheres to the dominant model of the project life cycle or phased stage-gate approach to executing projects. This implies a clear definition of mission and system are given at the outset (to reduce uncertainty), and subsequent execution in phases with decision gates. It contrasts with approach applied in the seminal projects that are credited with establishing the foundation of the discipline in the 1940s and 50s. Those projects started out with missions that were beyond the currently possible; any solutions had to emerge over time. They succeeded by a combination of parallel trials (from which the best would then be selected) and trial-and-error iteration (allowing for the modification of solutions pursued over a period of time). Although the success of these approaches was well documented and explained by scientific study in the 1950s, today they seem to fly in the face of accepted professional standards, making managers uncomfortable when they are encountered. The explanation for this contradiction has its roots in the 1960s, when the so-called McNamara revolution at the Department of Defense (DoD) gave a control orientation to the PM discipline. This shift was cemented by the codes and practices of the DoD and NASA, contemporary scientific writing, and the foundation of the Project Management Institute, a professional organization that translated the standard into the educational norm for a generation of project managers. The proj…
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Ironically, however, it seems that project teams spend most of their time on the science structured parts, and only a small portion on the art parts [5].”
From What is Strategic Project Leadership? (2015) · cites this paper as [5]
In the citing paper
“Two influential studies by Williams [4] and Lenfile and Loch [5] have demonstrated specific shortcomings such as, sticking to an operational view based on the triple constraint, or the focus on excessive control of process, while neglecting to deal with uncertainty and change.”
From What is Strategic Project Leadership? (2015) · cites this paper as [5]
Citations
Cited by
What's Next?: After Stage-Gate
Cooper, R. G. (2014) · Research-Technology Management · doi:10.5437/08956308x5606963 · Cited by 474
Svejvig, P., & Andersen, P. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.06.004 · Cited by 324
Denicol, J., Davies, A., & Krystallis, I. (2020) · Project Management Journal · doi:10.1177/8756972819896113 · Cited by 266
Agile–Stage-Gate for Manufacturers
Cooper, R. G., & Sommer, A. F. (2018) · Research-Technology Management · doi:10.1080/08956308.2018.1421380 · Cited by 298
Explicating the dynamics of project capabilities
Davies, A., & Brady, T. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.04.006 · Cited by 265
Managing Structural and Dynamic Complexity: A Tale of Two Projects
Brady, T., & Davies, A. C. (2014) · Project Management Journal · doi:10.1002/pmj.21434 · Cited by 267
Ahern, T. C., Leavy, B., & Byrne, P. J. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.06.007 · Cited by 205
Dynamic Capabilities in Complex Projects: The Case of London Heathrow Terminal 5
Davies, A. C., Dodgson, M., & Gann, D. (2016) · Project Management Journal · doi:10.1002/pmj.21574 · Cited by 195
Agile-Stage-Gate: New idea-to-launch method for manufactured new products is faster, more responsive
Cooper, R. G., & Sommer, A. F. (2016) · Industrial Marketing Management · doi:10.1016/j.indmarman.2016.10.006 · Cited by 191
Bianchi, M., Marzi, G., & Guerini, M. (2018) · Journal of Business Research · doi:10.1016/j.jbusres.2018.05.003 · Cited by 189
A history of project management models: From pre-models to the standard models
Garel, G. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.12.011 · Cited by 187
Daniel, P. A., & Daniel, C. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.07.004 · Cited by 176
Teller, J., Kock, A., & Gemünden, H. G. (2014) · Project Management Journal · doi:10.1002/pmj.21431 · Cited by 161
Rampa, R., & Agogué, M. (2021) · Creativity and Innovation Management · doi:10.1111/caim.12423 · Cited by 161
Davies, A. C., Manning, S. D., & Söderlund, J. (2018) · Research Policy · doi:10.1016/j.respol.2018.03.002 · Cited by 155
Gil, N. A., & Fu, Y. (2021) · Academy of Management Discoveries · doi:10.5465/amd.2020.0029 · Cited by 145
COVID-19 and the Acceleration of Digital Transformation and the Future of Work
Kudyba, S. P. (2020) · Information Systems Management · doi:10.1080/10580530.2020.1818903 · Cited by 140
Osipova, E., & Eriksson, P. E. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.09.007 · Cited by 137
Projects and institutions: towards understanding their mutual constitution and dynamics
Söderlund, J., & Sydow, J. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.01.001 · Cited by 137
Eriksson, P. E., Larsson, J., & Pesämaa, O. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.08.015 · Cited by 135
Teller, J. (2013) · Project Management Journal · doi:10.1002/pmj.21327 · Cited by 120
Park, J., & Kwak, Y. H. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.10.013 · Cited by 115
Ika, L. A., & Munro, L. T. (2022) · International Journal of Project Management · doi:10.1016/j.ijproman.2022.05.008 · Cited by 110
Moving Beyond the Planning Fallacy: The Emergence of a New Principle of Project Behavior
Ika, L. A., Love, P. E. D., & Pinto, J. K. (2020) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2020.3040526 · Cited by 103
Trust in megaprojects: A comprehensive literature review of research trends
Cerić, A., Vukomanović, M., Ivić, I., & Kolarić, S. (2020) · International Journal of Project Management · doi:10.1016/j.ijproman.2020.10.007 · Cited by 98
The Nature of Risk in Complex Projects
Williams, T. (2017) · Project Management Journal · doi:10.1177/875697281704800405 · Cited by 96
Escalation in major projects: Lessons from the Channel Fixed Link
Winch, G. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.01.012 · Cited by 87
If maturity is the answer, then exactly what was the question?
Mullaly, M. (2014) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-09-2013-0047 · Cited by 86
Knowledge formation and learning in the management of projects: A problem solving perspective
Ahern, T. C., Leavy, B., & Byrne, P. J. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.02.004 · Cited by 86
Lenfle, S. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.02.001 · Cited by 86
Self-citationIdea-to-Launch Gating Systems: Better, Faster, and More Agile
Cooper, R. G. (2017) · Research-Technology Management · doi:10.1080/08956308.2017.1255057 · Cited by 86
Delivery Model Innovation: Insights From Infrastructure Projects
Davies, A. C., MacAulay, S. C., & Brady, T. (2019) · Project Management Journal · doi:10.1177/8756972819831145 · Cited by 86
Multiproject lineage management: Bridging project management and design-based innovation strategy
Maniak, R., & Midler, C. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.03.006 · Cited by 84
When cultures collide: What can we learn from frictions in the implementation of design thinking?
Carlgren, L., & Mahmoud‐Jouini, S. B. (2021) · Journal of Product Innovation Management · doi:10.1111/jpim.12603 · Cited by 81
Floating in Space? On the Strangeness of Exploratory Projects
Lenfle, S. (2016) · Project Management Journal · doi:10.1002/pmj.21584 · Cited by 77
Self-citationEvaluating the Agile-Stage-Gate Hybrid Model: Experiences From Three SME Manufacturing Firms
Edwards, K., Cooper, R. G., Vedsmand, T., & Nardelli, G. (2019) · International Journal of Innovation and Technology Management · doi:10.1142/s0219877019500482 · Cited by 76
Fowler, N., Lindahl, M., & Sköld, D. (2015) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-10-2013-0059 · Cited by 76
Project Society: Paths and Challenges
Lundin, R. A. (2016) · Project Management Journal · doi:10.1177/875697281604700402 · Cited by 74
Governmental Governance of Megaprojects: The Case of EXPO 2010 Shanghai
Zhai, Z., Ahola, T., Le, Y., & Xie, J. (2017) · Project Management Journal · doi:10.1177/875697281704800103 · Cited by 70
Framing value management for creative projects: An expansive perspective
Gillier, T., Hooge, S., & Piat, G. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.11.002 · Cited by 67
Reframing Systems Integration: A Process Perspective on Projects
Whyte, J. K., & Davies, A. C. (2021) · Project Management Journal · doi:10.1177/8756972821992246 · Cited by 65
Yazici, H. J. (2020) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-08-2019-0207 · Cited by 64
Exploring the Role of Project Management in Product Development of New Technology-Based Firms
Sońta-Drączkowska, E., & Mrożewski, M. J. (2019) · Project Management Journal · doi:10.1177/8756972819851939 · Cited by 62
Critical learning themes in project management education: Implications for blended learning
Ashleigh, M., Ojiako, U., Chipulu, M., & Wang, J. K. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.05.002 · Cited by 62
Dealing with uncertainty in complex projects: revisiting Klein and Meckling
Brady, T., Davies, A. C., & Nightingale, P. (2012) · International Journal of Managing Projects in Business · doi:10.1108/17538371211269022 · Cited by 61
Do You Need a New Product-Development Strategy?
MacCormack, A., Crandall, W. “., Henderson, P. D., & Toft, P. (2012) · Research-Technology Management · doi:10.5437/08956308x5501014 · Cited by 61
Feedback systems in the design and development process
Wynn, D. C., & Maier, A. M. (2022) · Research in Engineering Design · doi:10.1007/s00163-022-00386-z · Cited by 60
Sergeeva, N., & Ali, S. (2020) · Project Management Journal · doi:10.1177/8756972820919215 · Cited by 60
Making Project History: Revisiting the Past, Creating the Future
Söderlund, J., & Lenfle, S. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.02.005 · Cited by 60
Self-citationOrganizing innovation projects under technological turbulence
Candi, M., van den Ende, J., & Gemser, G. (2013) · Technovation · doi:10.1016/j.technovation.2013.01.002 · Cited by 58
Geraldi, J. G., & Söderlund, J. (2016) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2016-0016 · Cited by 58
Enabling Agility in Product Development through an Adaptive Engineering Change Management
Schuh, G., Gartzen, T., Soucy-Bouchard, S., & Basse, F. H.-U. (2017) · Procedia CIRP · doi:10.1016/j.procir.2017.03.106 · Cited by 58
Toward a genealogy of project management: Sidewinder and the management of exploratory projects
Lenfle, S. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.10.017 · Cited by 57
Self-citationCreativity and Risk Taking Aren't Rational: Behavioral Operations in MOT
Loch, C. H. (2016) · Production and Operations Management · doi:10.1111/poms.12666 · Cited by 56
Self-citationMaking it happen: How managerial actions enable project-based ambidexterity
Turner, N. W., Swart, J., Maylor, H. R., & Antonacopoulou, E. P. (2015) · Management Learning · doi:10.1177/1350507615610028 · Cited by 55
Project governance and path creation in the early stages of Finnish nuclear power projects
Hellström, M., Ruuska, I., Wikström, K., & Jåfs, D. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.01.005 · Cited by 53
Equifinality in Project Management Exploring Causal Complexity in Projects
Kapsali, M. (2012) · Systems Research and Behavioral Science · doi:10.1002/sres.2128 · Cited by 53
Project management and system dynamics modelling: Time to connect with innovation and sustainability
Calderon‐Tellez, J. A., Bell, G., Herrera, M. M., & Sato, C. E. Y. (2023) · Systems Research and Behavioral Science · doi:10.1002/sres.2926 · Cited by 51
Lenfle, S., & Söderlund, J. (2022) · Research Policy · doi:10.1016/j.respol.2021.104455 · Cited by 48
Self-citationSzentes, H., & Eriksson, P. E. (2015) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001081 · Cited by 47
Value Management for Exploration Projects
Maniak, R., Midler, C., Lenfle, S., & Pellec-Dairon, M. L. (2014) · Project Management Journal · doi:10.1002/pmj.21436 · Cited by 47
Self-citationGeraldi, J. G., Teerikangas, S. P., & Birollo, G. (2022) · International Journal of Project Management · doi:10.1016/j.ijproman.2022.03.005 · Cited by 46
Roehrich, J. K., Davies, A. C., Tyler, B. B., Mishra, A., & Bendoly, E. (2023) · Journal of Operations Management · doi:10.1002/joom.1280 · Cited by 46
Organizational Ambidexterity: A Critical Review and Development of a Project-Focused Definition
Petro, Y., Ojiako, U., Williams, T., & Marshall, A. J. (2019) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000685 · Cited by 46
Sankaran, S., Jacobsson, M., & Blomquist, T. (2021) · Systems Research and Behavioral Science · doi:10.1002/sres.2814 · Cited by 46
Designing Decisions in the Unknown: A Generative Model
Masson, P. L., Hatchuel, A., Glatin, M. L., & Weil, B. (2018) · European Management Review · doi:10.1111/emre.12289 · Cited by 45
Ambidexterity and Knowledge Strategy in Major Projects: A Framework and Illustrative Case Study
Turner, N. W., Maylor, H. R., Lee‐Kelley, L., Brady, T., Kutsch, E., & Carver, S. (2014) · Project Management Journal · doi:10.1002/pmj.21454 · Cited by 45
Rethinking project reliability using the ambidexterity and mindfulness perspectives
Turner, N. W., Kutsch, E., & Leybourne, S. A. (2016) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-08-2015-0074 · Cited by 44
Exploration, project evaluation and design theory: a rereading of the Manhattan case
Lenfle, S. (2012) · International Journal of Managing Projects in Business · doi:10.1108/17538371211235335 · Cited by 44
Self-citationProject and Innovation Management: Bridging Contemporary Trends in Theory and Practice
Midler, C., Killen, C. P., & Kock, A. (2016) · Project Management Journal · doi:10.1002/pmj.21587 · Cited by 44
PERT, Polaris, and the realities of project execution
Engwall, M. (2012) · International Journal of Managing Projects in Business · doi:10.1108/17538371211268898 · Cited by 42
A Hybrid Innovation Management Framework for Manufacturing – Enablers for more Agility in Plants
Brandl, F. J., Kagerer, M., & Reinhart, G. (2018) · Procedia CIRP · doi:10.1016/j.procir.2018.04.022 · Cited by 41
Project Management in Engineering Education: Providing Generation Z With Transferable Skills
Magano, J., Silva, C. S., Figueiredo, C., Vitória, A., & Nogueira, T. (2021) · IEEE Revista Iberoamericana de Tecnologias del Aprendizaje · doi:10.1109/rita.2021.3052496 · Cited by 40
Griffin, M. A., Hodkiewicz, M. R., Dunster, J., Kanse, L., Parkes, K. R., Finnerty, D., Cordery, J. L., & Unsworth, K. L. (2013) · Accident Analysis & Prevention · doi:10.1016/j.aap.2013.12.005 · Cited by 40
Lenfle, S., Masson, P. L., & Weil, B. (2016) · Creativity and Innovation Management · doi:10.1111/caim.12164 · Cited by 40
Self-citationThe Temporary Marketing Organization
Hadida, A. L., Heide, J. B., & Bell, S. J. (2018) · Journal of Marketing · doi:10.1177/0022242918813119 · Cited by 39
Högman, U., & Johannesson, H. L. (2013) · Journal of Engineering and Technology Management · doi:10.1016/j.jengtecman.2013.05.002 · Cited by 39
The process of creation in creative industries
Paris, T., & Mahmoud‐Jouini, S. B. (2019) · Creativity and Innovation Management · doi:10.1111/caim.12332 · Cited by 38
Gil, N. A. (2021) · Construction Management and Economics · doi:10.1080/01446193.2021.1946832 · Cited by 38
PMO managers' self-determined participation in a purposeful virtual community-of-practice
Lee‐Kelley, L., & Turner, N. W. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.09.014 · Cited by 37
Gorod, A., Hallo, L., & Nguyen, T. (2018) · Systems Research and Behavioral Science · doi:10.1002/sres.2520 · Cited by 37
Liu, Y., Houwing, E.-J., Hertogh, M. J. C. M., Yuan, Z., & Liu, H. (2022) · Project Management Journal · doi:10.1177/87569728211065574 · Cited by 37
The intervening role of ambidexterity in the knowledge management project success connection
Alshawabkeh, R. O. K., Rumman, A. R. A., Al-Abbadi, L. H., & Abu-Rumman, A. (2020) · Problems and Perspectives in Management · doi:10.21511/ppm.18(3).2020.05 · Cited by 36
Experimenting in the Unknown: Lessons from The Manhattan Project
Gillier, T., & Lenfle, S. (2018) · European Management Review · doi:10.1111/emre.12187 · Cited by 35
Self-citationCrossing the Valley of Death: Managing the When, What, and How of Innovative Development Projects
Midler, C. (2019) · Project Management Journal · doi:10.1177/8756972819857881 · Cited by 35
Managing exploratory projects: A repertoire of approaches and their shared underpinnings
Wied, M., Koch-Ørvad, N., Welo, T., & Oehmen, J. (2020) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.12.002 · Cited by 35
Improving Building Design Processes and Design Management Practices: A Case Study
Pikas, E., Koskela, L., & Seppänen, O. (2020) · Sustainability · doi:10.3390/su12030911 · Cited by 35
Toward a Commonly Shared Public Policy Perspective for Analyzing Risk Coping Strategies
Li, Y., Taeihagh, A., de Jong, M., & Klinke, A. (2020) · Risk Analysis · doi:10.1111/risa.13505 · Cited by 35
Classics in project management: revisiting the past, creating the future
Söderlund, J., & Geraldi, J. G. (2012) · International Journal of Managing Projects in Business · doi:10.1108/17538371211280245 · Cited by 34
Project control: an exploratory study of levers of control in the context of managing projects
Rezania, D., Baker, R., & Burga, R. (2016) · Journal of Accounting & Organizational Change · doi:10.1108/jaoc-10-2015-0084 · Cited by 34
Enninga, T., & van der Lugt, R. (2016) · Project Management Journal · doi:10.1002/pmj.21578 · Cited by 33
Researching navigation of project complexity using action design research
Mikkelsen, M. F., Venable, J. R., & Aaltonen, K. (2020) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2020-0040 · Cited by 32
Ambidexterity and Agile project management: an empirical framework
Binci, D., Cerruti, C., Masili, G., & Paternoster, C. (2022) · The TQM Journal · doi:10.1108/tqm-01-2022-0011 · Cited by 32
Project management learning: Key dimensions and saliency from student experiences
Ojiako, U., Chipulu, M., Ashleigh, M., & Williams, T. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.02.002 · Cited by 32
Technical and institutional factors in the emergence of project management
Johnson, S. B. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.01.006 · Cited by 32
Symbols, Sublimes, Solutions, and Problems: A Garbage Can Model of Megaprojects
Steen, J. T., Ford, J. A., & Verreynne, M. (2017) · Project Management Journal · doi:10.1177/875697281704800609 · Cited by 32
Culture, Communication, and Leadership for Projects in Dynamic Environments
Collyer, S. (2016) · Project Management Journal · doi:10.1177/875697281604700608 · Cited by 31
Papachristos, G., Papadonikolaki, E., & Morgan, B. (2024) · Technovation · doi:10.1016/j.technovation.2024.102967 · Cited by 31
Söderlund, J., & Pemsel, S. (2021) · Human Relations · doi:10.1177/0018726721991623 · Cited by 30
Fang, S., & Zhang, L. (2021) · International Journal of Project Management · doi:10.1016/j.ijproman.2021.09.004 · Cited by 30
Metadata
- Authors
- Lenfle, S., & Loch, C.
- Venue
- California Management Review
- Publisher
- SAGE Publications
- Published
- 2010-11
- Volume
- 53
- Issue
- 1
- Pages
- 32-55
- ISSN
- 0008-1256 (ISSN-L)
- 2162-8564
- OpenAlex
- W2054262764
- Cited by
- 348
- References
- 0
- Citations by year
- 2026: 8 · 2025: 15 · 2024: 22 · 2023: 20 · 2022: 25 · 2021: 30 · 2020: 27 · 2019: 27 · 2018: 40 · 2017: 26 · 2016: 25 · 2015: 19 · 2014: 20 · 2013: 22 · 2012: 15
- FWCI
- 18.75
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- journals.sagepub.com/page/policies/text-and-data-mining-license (tdm)
- Locations
- California Management Review (publishedVersion)
- HAL (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Organizational Behavior and Human Resource Management › Management Theory and Practice
- Social Sciences › Business, Management and Accounting › Organizational Behavior and Human Resource Management › Management and Organizational Studies
- Keywords
- project management, control, flexibility, novelty, organizational change
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.