The DOI matches its Crossref record; 24 of the 24 references it cites were found in a registry or an index.
Impact of management decisions based on managerial competencies and skills developed trough BIM technology on performance of construction enterprises
Open accessAbstract
Management of construction enterprises requires experience or managerial competencies. To achieve successful results of construction enterprises and projects, for example as cost reducing, increasing revenues, shortening construction time, both are necessary. Building information modeling represents technology for developing of managerial skills for managers. Main aim of research is to analyze and quantify the management decisions based on managerial competencies developed through building information modeling on results of construction enterprises in Slovakia. Cost reducing, increasing of revenues and shortening construction time are main monitored by enterprise and project results. Research hypotheses are based on the assumption that building information modeling has a positive impact on development of managerial competencies and skills and manager’s t decisions.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The check wasn’t confident either way, so it gives no verdict — never disputed.
In the citing paper
“In this way, the possibility of confusion or the incorrect selection of goods is minimized and the speed and accuracy of the process is increased [4,5].”
From Poka Yoke in Smart Production Systems with Pick-to-Light Implementation to Increase Efficiency (2023) · cites this paper as [4]
Experimental — accuracy not yet measured
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Use of Ranks in One-Criterion Variance Analysis
Kruskal, W. H., & Wallis, W. A. (1952) · Journal of the American Statistical Association · doi:10.1080/01621459.1952.10483441 · Cited by 13,912
International Journal of Applied Engineering Research
(2022) · International Journal of Applied Engineering Research · doi:10.37622/ijaer · Cited by 3,175
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry
Azhar, S. (2011) · Leadership and Management in Engineering · doi:10.1061/(asce)lm.1943-5630.0000127 · Cited by 2,207
Wang, X. (2012) · Construction Economics and Building · doi:10.5130/ajceb.v12i3.2749 · Cited by 1,510
Nonparametric statistics for non-statisticians: a step-by-step approach
(2010) · Choice Reviews Online · doi:10.5860/choice.47-3859 · Cited by 1,026
Nonparametric Statistics for Non‐Statisticians
Corder, G. W., & Foreman, D. I. (2009) · Wiley eBooks · doi:10.1002/9781118165881 · Cited by 971
Journal of Construction Engineering and Management
de la Garza, J., Jahren, C. T., Jaselskis, E. J., Rowings, J. E., & Harris, R. B. (1983) · Cited by 969
(2012) · Cited by 852
Journal of Information Technology in Construction
(2019) · Journal of Information Technology in Construction · doi:10.36680/j.itcon · Cited by 503
Research works printed but not linked: 5
- Štrba Ľ., 2016, International Journal of Business and Management Studies, 5, 3
- Kreider R. G., 2013, The uses of BIM - classifying and selecting of BIM uses
- Černý M., 2013, BIM handbook
- Morton J., 2011, Build, 105, 4
- Mitchell D., Proceedings of the 19th CIB World Building Congress, 74
Cited by
Sorted by citations
Poka Yoke in Smart Production Systems with Pick-to-Light Implementation to Increase Efficiency
Trojanowska, J., Husár, J., Hrehova, S., & Knapčíková, L. (2023) · Applied Sciences · doi:10.3390/app132111715 · Cited by 23
“The main mission of the Poka Yoke method is to identify and In this way, the possibility of confusion or the incorrect selection of goods is minimized and the speed and accuracy of the process is increased [4,5]. prevent errors.”
Method
Metadata
- Authors
- Mandičák, T., Mesároš, P., & Tkáč, M.
- Affiliations
- Technical University of Košice (SK)
- Department of Construction Technology and Management, Faculty of Civil Engineering Technical University of Kosice, Vysokoskolska 4, 042 00 Kosice, Slovakia
- ORCID
- Mandičák, Tomáš
- Venue
- Pollack Periodica
- Publisher
- Akademiai Kiado Zrt.
- Published
- 2018-12
- Volume
- 13
- Issue
- 3
- Pages
- 131-140
- ISSN
- 1788-1994 (ISSN-L)
- 1788-3911
- OpenAlex
- W2901240430
- Semantic Scholar
- 045793db9173a872ae1c249f1da15301a83fe5fa
- Cited by
- 38
- References
- 24
- Citations by year
- 2026: 2 · 2025: 3 · 2024: 3 · 2023: 8 · 2022: 7 · 2021: 5 · 2020: 8 · 2019: 2
- FWCI
- 3.00
- Type
- journal article
- Language
- en
- Open access
- bronze
- doi.org
- Locations
- Pollack Periodica (publishedVersion)
- Repository of the Academy's Library (Library of the Hungarian Academy of Sciences) (acceptedVersion)
- Funders
- Vedecká Grantová Agentúra MŠVVaŠ SR a SAV (VEGA 1/0828/17, 1/0828/17)
- Topics
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Engineering › Building and Construction › Construction Management and Sustainability
- Keywords
- building information modeling, managerial competencies, construction management, management decision-making, cost reduction, sales growth, construction time reduction
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Impact of management decisions based on managerial competencies and skills developed trough BIM technology on performance of construction enterprises. https://app.cochat.ai/papers/10.1556/606.2018.13.3.13
- The paper
- Mandičák, T., Mesároš, P., & Tkáč, M. (2018). Impact of management decisions based on managerial competencies and skills developed trough BIM technology on performance of construction enterprises. Pollack Periodica. https://doi.org/10.1556/606.2018.13.3.13