CoChat

Implementation of a Lean Manufacturing and SLP- based system for a footwear company

Silvestre, Sergio Enrique Munive, Chaicha, Victor David Paucar, Merino, Jose Carlos Alvarez, Nallusamy, S. · 2022 · Production
Cited by 29

The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.

Abstract

Paper aims This research article addresses an innovative solution to face one of the main problems in the footwear industry, namely the high order non-fulfillment rate. Originality This research offers companies in the footwear industry the possibility of implementing Andon through a structured and planned process that allows expediting problem solving. The advantage of this system is the ability to signal the status of workstations through rapid visual identification. Moreover, in this way social distancing is also secured, in line with World Health Organization guidelines to prevent the spread of COVID-19. Research method The article presents four phases through which the case study was addressed. Planning (determination of objectives), Restructuring of the Operations Area, Improvement of the Production Line and Continuous Improvement. Main findings An Arena simulation system was used to establish a new scenario where the defective product indicator decreases by 3.13% and productivity improves by about 38%. In turn, the resulting increase in the number of orders enhances company sales and profits, as well as the ability to meet the customer demand in a timely manner. Implications for theory and practice The case study suggests that the main causes of this issue (high order non-fulfillment rate) are the increasing rate of defective goods, delays in the production process, and excessive time consumption in the movement of staff and materials. This research serves as the basis for future lines of research, as well as for other organizations with similar characteristics to implement the proposal.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1590/0103-6513.20210072

Cites

1 of 1 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 1 references

Research works printed but not linked: 26

  1. Abdul-Rashid S. H., 2017, The impact of sustainable manufacturing practices on sustainability performance: empirical evidence from Malaysia, International Journal of Operations & Production Management, 37, 182, 10.1108/IJOPM-04-2015-0223 · DOI · Paper page
  2. Abu F., 2021, An SEM approach for the barrier analysis in lean implementation in manufacturing industries, Sustainability, 13, 1
  3. Adesta E., 2018, The evaluation of lean manufacturing implementation and their impact to manufacturing performance, IOP Conference Series. Materials Science and Engineering, 453, 10.1088/1757-899X/453/1/012031 · DOI
  4. Ali Naqvi S. A., 2016, Productivity improvement of a manufacturing facility using systematic layout planning, Cogent Engineering, 3, 10.1080/23311916.2016.1207296 · DOI
  5. Andrade Y., 2019, Lean manufacturing model for the reduction of production times and reduction of the returns of defective items in textile industry.
  6. Everett R. J., 1991, Individual Involvement and Intervention in Quality Improvement Programmes: Using the Andon System, International Journal of Quality & Reliability Management, 8, 10.1108/EUM0000000001635 · doi:10.1108/eum0000000001635
  7. Andrade A. M., 2019, Estudio de Tiempos y Movimientos para Incrementar la Eficiencia en una Empresa de Producción de Calzado, Información Tecnológica, 30, 83, 10.4067/S0718-07642019000300083 · doi:10.4067/s0718-07642019000300083
  8. Goyal G., 2019, Optimization of plant layout in manufacturing industry, International Journal of Recent Technology and Engineering, 8, 3115
  9. Jiamruangjarus P., 2016, An integrated multi-criteria decision making methodology for conveyor system selection, Cogent Engineering, 3, 10.1080/23311916.2016.1158515 · doi:10.1080/23311916.2016.1158515
  10. Kłodawski M., 2017, The issues of selection warehouse process strategies, Procedia Engineering, 187, 451, 10.1016/j.proeng.2017.04.399 · doi:10.1016/j.proeng.2017.04.399
  11. Lopez-Leyva J. A., 2020, Customized smart andon system to improve the efficiency of industrial departments, Journal of Scientific and Industrial Research, 79, 35
  12. Nasution A. A., 2018, Lean manufacturing applications in the manufacturing industry, MATEC Web of Conferences, 220, 02005, 10.1051/matecconf/201822002005 · doi:10.1051/matecconf/201822002005
  13. Rabanal Mariela, 2020, Systematic layout planning: a research on the third party logistics of a Peruvian Company.
  14. Randhawa J. S., 2017, 5S - a quality improvement tool for sustainable performance: literature review and directions, International Journal of Quality & Reliability Management, 34, 334, 10.1108/IJQRM-03-2015-0045 · DOI
  15. Randhawa J. S., 2017, Evaluating impact of 5S implementation on business performance, International Journal of Productivity and Performance Management, 66, 948, 10.1108/IJPPM-08-2016-0154 · DOI
  16. Sarria Yépez M. P., 2017, Modelo metodológico de implementación de lean manufacturing, Revista EAN, 83, 51, 10.21158/01208160.n83.2017.1825 · DOI
  17. Sayid Mia M. A., 2017, Court shoe production line: improvement of process cycle efficiency by using lean tools, Leather and Footwear Journal, 17, 135, 10.24264/lfj.17.3.3 · doi:10.24264/lfj.17.3.3
  18. Sayid Mia M. A., 2017, Footwear industry in bangladesh: reduction of lead time by using lean tools, Journal of Environmental Science, Computer Science and Engineering & Technology, 6, 251
  19. Sierra V. P., 2017, Metodología dinámica para la implementación de 5’s en el área de producción de las organizaciones, Revista Ciencias Estratégicas, 25, 411
  20. Singh J., 2018, Enigma of KAIZEN approach in manufacturing industry of Northern India: a case study, International Journal of Quality & Reliability Management, 35, 187, 10.1108/IJQRM-12-2016-0220 · doi:10.1108/ijqrm-12-2016-0220
  21. Suhardini D., 2017, Design and simulation plant layout using systematic layout planning, IOP Conference Series. Materials Science and Engineering, 277, 10.1088/1757-899X/277/1/012051 · doi:10.1088/1757-899x/277/1/012051
  22. Tanco F., 2021, Main challenges involved in the adoption of sustainable manufacturing in Uruguayan small and medium sized companies, Journal of Cleaner Production, 293, 10.1016/j.jclepro.2021.126139 · doi:10.1016/j.jclepro.2021.126139
  23. Tarigan U., 2020, Implementation of lean services and facility layout to improve health clinical service processes, IOP Conference Series. Materials Science and Engineering, 1003, 10.1088/1757-899X/1003/1/012031 · DOI
  24. Vanichchinchai A., 2020, Exploring organizational contexts on lean manufacturing and supply chain relationship, Journal of Manufacturing Technology Management, 31, 236, 10.1108/JMTM-01-2019-0017 · DOI
  25. Yang T., 2000, Systematic layout planning: A study on semiconductor wafer fabrication facilities, International Journal of Operations & Production Management, 20, 1359, 10.1108/01443570010348299 · DOI
  26. Yuik C. J., 2020, Exploring critical success factors for the implementation of lean manufacturing in machinery and equipment SMEs, Engineering Management in Production and Services, 12, 77, 10.2478/emj-2020-0029 · DOI

Metadata

Authors
Silvestre, S. E. M., Chaicha, V. D. P., Merino, J. C. A., & Nallusamy, S.
Affiliations
  • Universidad Peruana de Ciencias Aplicadas, Peru
  • Jadavpur University, India
Venue
Production
Published
2022
Volume
32
ISSN
  • 1980-5411
  • 0103-6513
Cited by
29
References
1

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.