Sustainable site clean-up from megaprojects: lessons from London 2012
Open accessThe DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Abstract
The London 2012 Olympic and Paralympic Games are considered to have been a great success for the UK. In building the Olympic Park, another great achievement was the clean-up and reuse of a large area of contaminated land. A remediation project of this size would typically take 5 to 15 years to complete, but the project team completed the remediation work in less than 3 years. This study provides an in-depth examination of the remediation practices at the site, mainly from the perspective of sustainable construction. Data were collected from multiple sources, including project files, publications by various government agencies and non-governmental organisations, as well as qualitative interviews with project team members. The paper first presents a review of brownfield redevelopment and sustainable remediation literature. Sustainability initiatives and achievements in the Olympic Park site remediation project are summarised and discussed. These mainly included suitable remediation strategies, recycling and reuse of contaminated soil by using soil washing and innovative in situ remediation of contaminated groundwater through bioremediation. The paper identifies a number of challenges and lessons learned regarding brownfield remediation in megaprojects, which warrant further technological development and appropriate policy actions to address.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Mega‐projects in New York, London and Amsterdam
FAINSTEIN, S. S. (2008) · International Journal of Urban and Regional Research · doi:10.1111/j.1468-2427.2008.00826.x · Cited by 317
Cited by
Sustainable remediation and redevelopment of brownfield sites
Hou, D., Al-Tabbaa, A., O’Connor, D., Hu, Q., Zhu, Y.-G., Wang, L., Kirkwood, N., Ok, Y. S., Tsang, D. C. W., Bolan, N. S., et al. (2023) · Nature Reviews Earth & Environment · doi:10.1038/s43017-023-00404-1 · Cited by 338
Self-citationSong, Y., Kirkwood, N., Maksimović, Č., Zheng, X., O'Connor, D., Jin, Y., & Hou, D. (2019) · Science of The Total Environment · doi:10.1016/j.scitotenv.2019.01.347 · Cited by 325
Self-citationA review of green remediation strategies for heavy metal contaminated soil
Wang, L., Rinklebe, J., Tack, F. M. G., & Hou, D. (2021) · Soil Use and Management · doi:10.1111/sum.12717 · Cited by 317
Self-citationZhai, X., Li, Z., Huang, B., Luo, N., Huang, M., Zhang, Q., & Zeng, G. (2018) · Science of The Total Environment · doi:10.1016/j.scitotenv.2018.04.119 · Cited by 273
Shen, Z., Hou, D., Xu, W., Zhang, J., Jin, F., Zhao, B., Pan, S., Peng, T., & Alessi, D. S. (2018) · Science of The Total Environment · doi:10.1016/j.scitotenv.2018.06.321 · Cited by 75
Self-citation
Metadata
- Authors
- Hou, D., Al-Tabbaa, A., & Hellings, J.
- Venue
- Proceedings of the Institution of Civil Engineers - Engineering Sustainability
- Publisher
- Emerald
- Published
- 2015-04
- Volume
- 168
- Issue
- 2
- Pages
- 61-70
- ISSN
- 1478-4629 (ISSN-L)
- 1751-7680
- OpenAlex
- W2103109396
- Cited by
- 30
- References
- 1
- FWCI
- 1.53
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Sustainable site clean-up from megaprojects: lessons from London 2012. https://app.cochat.ai/papers/10.1680/ensu.14.00025
- The paper
- Hou, D., Al-Tabbaa, A., & Hellings, J. (2015). Sustainable site clean-up from megaprojects: lessons from London 2012. Proceedings of the Institution of Civil Engineers - Engineering Sustainability. https://doi.org/10.1680/ensu.14.00025
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.