Architect and contractor attitudes to waste minimisation
Open accessThe DOI matches its Crossref record.
Abstract
Around 420 million t of materials are used each year in the construction industry in the UK; however, only 360 million t are incorporated into products. Additionally, construction and demolition activities in the UK generated more than 150 million t of waste in 1998 comprising 40% from the manufacture of products and 60% from site-based activities, including an estimated 13 million t of unused materials. Research has been undertaken to assess UK architects'p and contractors' attitudes towards waste minimisation, by investigating the integration of waste minimisation strategies into current design processes, examining contractors' existing waste management practices and establishing responsibilities for, and barriers to, managing waste minimisation. A questionnaire survey based on specific and interrelated organisational waste minimisation issues was conducted with architects and contractors and revealed that very few attempts are made to reduce waste during the design process. On the other hand, the results show that contractors are pursuing a more proactive approach to manage on-site waste production through the development of environmental and waste management policies. The results reveal that poorly defined responsibilities are leading to confusion regarding who should control and monitor waste management. Both architects and contractors are constrained by internal and external factors, such as ‘waste accepted as inevitable’ and lack of interest from clients.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Big Data in the construction industry: A review of present status, opportunities, and future trends
Bilal, M., Oyedele, L. O., Qadir, J., Munir, K., Ajayi, S. O., Akinade, O. O., Owolabi, H. A., Alaka, H. A., & Pasha, M. (2016) · Advanced Engineering Informatics · doi:10.1016/j.aei.2016.07.001 · Cited by 929
Circular economy in construction: current awareness, challenges and enablers
Adams, K. T., Osmani, M., Thorpe, T., & Thornback, J. (2017) · Proceedings of the Institution of Civil Engineers - Waste and Resource Management · doi:10.1680/jwarm.16.00011 · Cited by 624
“The prevention of CDW is being considered more so, although more research is needed, especially at the design stages (Osmani et al., 2006).”
BackgroundSelf-citationJaillon, L., Poon, C. S., & Chiang, Y. H. (2009) · Waste Management · doi:10.1016/j.wasman.2008.02.015 · Cited by 592
Trend of the research on construction and demolition waste management
Yuan, H., & Shen, L. (2011) · Waste Management · doi:10.1016/j.wasman.2010.10.030 · Cited by 574
Life cycle greenhouse gas emissions and energy analysis of prefabricated reusable building modules
Aye, L., Ngo, T., Crawford, R. H., Gammampila, R., & Mendis, P. (2012) · Energy and Buildings · doi:10.1016/j.enbuild.2011.11.049 · Cited by 466
A model for quantifying construction waste in projects according to the European waste list
Llatas, C. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.023 · Cited by 326
“…of the main causes which generates a substantial amount of construction waste as a result of poor design concepts and decisions (e.g.: Osmani et al., 2007, Osmani et al., 2006, Innes, 2004; Chandrakanthi et al., 2002; Ekanayake and Ofori, 2000; Faniran and Caban, 1998; Bossink and Brouwers, 1996).”
BackgroundLife cycle design and prefabrication in buildings: A review and case studies in Hong Kong
Jaillon, L., & Poon, C. S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.09.006 · Cited by 305
Yuan, H. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.04.137 · Cited by 225
Wang, J., Li, Z., & Tam, V. W. Y. (2014) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2013.11.003 · Cited by 218
Ajayi, S. O., & Oyedele, L. O. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.01.075 · Cited by 191
Design issues of using prefabrication in Hong Kong building construction
Jaillon, L., & Poon, C. (2010) · Construction Management and Economics · doi:10.1080/01446193.2010.498481 · Cited by 189
“Prefabrication has been identified as a solution to reduce waste generation during the building design and construction processes (Poon and Jaillon, 2002; Osmani et al ., 2006; Jaillon and Poon, 2008; Jaillon et al ., 2009).”
BackgroundIdentifying best design strategies for construction waste minimization
Wang, J., Li, Z., & Tam, V. W. Y. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.12.076 · Cited by 186
Park, J., & Tucker, R. (2017) · International Journal of Construction Management · doi:10.1080/15623599.2016.1192248 · Cited by 180
Material Waste in the UAE Construction Industry: Main Causes and Minimization Practices
Al-Hajj, A., & Hamani, K. (2011) · Architectural Engineering and Design Management · doi:10.1080/17452007.2011.594576 · Cited by 173
Methods for estimating construction and demolition (C&D) waste
Llatas, C. (2013) · Handbook of Recycled Concrete and Demolition Waste · doi:10.1533/9780857096906.1.25 · Cited by 22
Metadata
- Authors
- Osmani, M., Glass, J., & Price, A.
- Venue
- Proceedings of the Institution of Civil Engineers - Waste and Resource Management
- Publisher
- Emerald
- Published
- 2006-05
- Volume
- 159
- Issue
- 2
- Pages
- 65-72
- ISSN
- 1747-6526 (ISSN-L)
- 1747-6534
- OpenAlex
- W2082402236
- Cited by
- 122
- References
- 0
- FWCI
- 2.19
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.