CoChat

NIBCO’S “BIG BANG”

Open access
Brown, Carol V., Vessey, Iris · 2001 · Communications of the Association for Information Systems
Cited by 79

The DOI matches its Crossref record.

Abstract

NIBCO, Inc., a mid-sized manufacturer of valves and pipe fittings headquartered in the U.S. with $460 million annual revenues, implemented SAP R/3 across its 10 plants and 4 new distribution centers with a Big Bang approach in December 1997. NIBCO management agreed with the Boston Consulting Group recommendation to "cut loose" from its existing legacy systems and replace them with common, integrated systems for finance, materials management, production, and sales/distribution, such as offered in the ERP packages of major vendors by the second half of the 1990s. However, the company leaders chose not to heed the advice of their consultants, or the current trade press, about taking a slower, phased-in approach. Instead, they developed plans for a Big Bang implementation of all modules (except HR) with a $17 million budget and a project completion date 15 months later that allowed for only a 30-day grace period. The project is led by a triad of NIBCO managers with primary accountabilities for business process, IT, and change management. The case describes the legacy IT environment, the ERP purchase and implementation partner choices, the selection and composition of what came to be called the TIGER team, the workspace design for the project team (TIGER den), the key issues addressed by each project sub-team, the incentive scheme, and the complexity added by a distribution center consolidation initiative that runs behind schedule. The case story ends shortly after the Go Live date, with the project leaders replaying their warnings to the executive team about initial dips in productivity and profits. This case study can be used to demonstrate the tradeoffs between Big Bang versus slower ERP implementation approaches that allow time for organizational learning. Students can identify the technology and organizational risks associated with ERP projects in general, and Big Bang implementations in particular, and then assess how well NIBCO's leaders manage these risks over the life of the project. Specific examples of communications and training initiatives, including ways to achieve employee buy-in, are detailed in the case so that students can better understand change management practices in the context of a major system implementation.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.17705/1cais.00501

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 79

Metadata

Authors
Brown, C. V., & Vessey, I.
Venue
Communications of the Association for Information Systems
Published
2001
Volume
5
ISSN
1529-3181 (ISSN-L)
OpenAlex
W266742865
Cited by
79
References
0
FWCI
11.69
Type
journal article
Language
en
Open access
green

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: NIBCO’S “BIG BANG”. https://app.cochat.ai/papers/10.17705/1cais.00501
The paper
Brown, C. V., & Vessey, I. (2001). NIBCO’S “BIG BANG”. Communications of the Association for Information Systems. https://doi.org/10.17705/1cais.00501

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.